• 제목/요약/키워드: workload process

검색결과 205건 처리시간 0.021초

작업부하에 의한 생산셀 설계 모델과 셀설계지원시스템 (A manufacturing cell design model and cell design support system based on workload)

  • 문치웅;이상용
    • 경영과학
    • /
    • 제12권1호
    • /
    • pp.51-60
    • /
    • 1995
  • This paper presents a workload based model and cell design support system (CDSS) in manufacturing cell design. The proposed model consider manufacturing factor such as machine capacity, production volume, process time, and cell size. Based on those information, workload is calculated and according to the workload, the relationship between machine and part is represented by the workload matrix. To form the manufacturing cell, correlation similarity coefficient (CSC) among machines are calculated and a pair of machines that has the highest value of CSC is assigned to a machine cell. Repeat the above steps until the desired manufacturing cells are obtained. Finally, a cell design support system that could increase the efficiency in the application of a proposed model is developed. The proposed model and CDSS are illustrated by a numerical example.

  • PDF

VoD 시스템의 효율적인 동적 작업부하조정을 위한 규칙 추론 및 사례기반 학습 방법 (A Rule's Reasoning and Case-Based Learning Method for Efficient Dynamic Workload Balancing of VoD Systems)

  • 김중환;박정윤
    • 컴퓨터교육학회논문지
    • /
    • 제11권2호
    • /
    • pp.107-117
    • /
    • 2008
  • VoD(Video on Demand) 시스템의 작업과정을 주기적으로 모니터링하며, 작업부하(workload)를 동적으로 조정할 수 있는 에이전트 시스템(agent system)은 VoD 시스템과 인터페이스를 하는 에이전시(Agency) 부분과 작업부하 조정에 필요한 조치를 추론하거나 학습하는 인텔리전스(Intelligence) 부분으로 구성된다. 본 연구에서는 에이전트 시스템의 인텔리전스 부분에서 적용할 수 있는 학습 방법(learning method)을 제안하였다. 제안된 방법은 규칙의 추론과정과 사례기반 학습 과정에 의하여 작업부하를 보다 효율적으로 조정할 수 있게 한다. 그리고 제안된 방법을 VoD 시스템에 적용하는 경우에 실효성이 있는지를 시뮬레이터를 구현하여 실험하였다. 실험의 결과, 제안된 방법을 적용하는 경우에 기존의 방법을 적용한 경우보다 상대적으로 성공적인 스트림 서비스 처리량(throughput) 과 VoD 서버에서의 평균 대기시간이 향상된다는 것을 알 수 있었다.

  • PDF

Lead Exposure Indices, Workloads, and Environmental Factors in Battery Manufacturing Workplace

  • Cho, Kwang Sung;Jeong, Byung Yong
    • 대한인간공학회지
    • /
    • 제32권3호
    • /
    • pp.259-266
    • /
    • 2013
  • Objective: This study aims to evaluate the workloads of industrial and automobile storage battery industries and their association to biological exposure indices. Background: Occupational lead exposure at battery manufacturing workplace is the most serious problem in safety and health management. Method: We surveyed 145 workers in 3 storage battery industries. Environmental factors(lead in air, temperature, humidity and vibration)), biological exposure indices(lead in blood and zinc protoporphyrin in blood) and individual workload factors(process type, work time, task type, weight handling and restrictive clothing) were measured in each unit workplace. Results/Conclusion: Air lead concentration is statistically significant in associations with workload factors(process type, work time, task type, and restrictive clothing) and environmental factors (humidity and vibration), whereas zinc protoporphyrin in blood are significantly associated with work time and weight handling. And lead in blood is significantly associated with work time, weight handling and temperature. Application: The results of this study are expected to be a fundamental data to job design.

동시공학적 설계의 IDEF3프로세스 모델을 CPM Network 모델로 변환하기 위한 절차 (Procedures of Transform the IDEF3 Process Model of Concurrent Design into CPM Precedence Network Model)

  • 강동진
    • 한국산업정보학회논문지
    • /
    • 제4권2호
    • /
    • pp.73-80
    • /
    • 1999
  • 동시공학적 설계의 특징은 활동의 동시성과 정보의 계층적 모델링이다. 중첩, 병행화, 순환 등 다양한 유형의 프로세스 동시성은 특정기간에 업무부하가 집중되는 문제를 발생시킨다. 따라서 자원제한이 있는 상황에서의 업무부하 관리는 대단히 유용하여, 설계 프로세스 분석을 위한 효과적인 방법이 필요하다. 본 연구는 계층적인 정보 모델링으로 더욱 복잡화된 프로세스의 효율적인 분석을 위하여 동시공학적 설계의 IDEF3 프로세스 모델을 기존의 순차적 네트웍모델로 변환하는 절차를 제안한 것이다. 이 절차는 동시공학환경에서의 자원제한 문제를 보다 체계적으로 해결하는 방법이 될 수 있을 것이다.

  • PDF

천장 크레인 운전 작업부하 평가모델 개발 (Development of a Workload Assessment Model for Overhead Crane Operation)

  • 권오채;이상기;조영석;박정철;정기효;유희천;한성호
    • 대한인간공학회지
    • /
    • 제26권2호
    • /
    • pp.45-59
    • /
    • 2007
  • The operating tasks of overhead crane have caused undue stress to the operators from physical, mental, and environmental workload. Existing workload assessment models for musculoskeletal disorders such as OWAS, RULA, and QEC have limited applicability to the crane operating tasks because they focus mainly on physical factors and do not consider the relative importance of each factor. The present study was to develop a workload assessment model customized to overhead crane operation, following a systematic process: (1) analyzing task characteristics, (2) selecting workload factors, (3) developing assessment methods, (4) establishing action levels, and (5) computerizing the assessment model. Based on literature review, worksite survey, and focus group interview, 4 physical factors (awkward posture, static posture, repetitive motion, and excessive force), 6 mental factors (visual demand, auditory demand, task complexity and difficulty, time urgency, work schedule related stress, and safety related stress), and 4 environmental factors (noise, vibration, dust, and temperature) were selected and their rating scales and relative weights were determined. Then, based on the workload assessment results of 8 overhead cranes operated at different workplaces, the action levels of each factor category were established. Finally, the crane operation assessment model was computerized for effective analysis and report preparation. The present approach is applicable to develop a customized workload assessment model for an operating task under consideration.

AHP를 활용한 VTS업무 중요도 평가 (VTS Task Assessment using AHP)

  • 김주성;정초영;김광일
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2018년도 추계학술대회
    • /
    • pp.261-262
    • /
    • 2018
  • 해상교통관제 업무는 제공하는 정보의 내용에 따라 분류된다. 우리나라는 1993년 포항에 최초의 해상교통관제센터 설립 이후 대한민국의 해상교통관제는 꾸준히 발전하고 있으며, 업무 영역의 확장이 이루어지고 있다. 본 논문에서는 해상교통관제 업무의 분류에 따른 해상 교통관제사의 업무 중요도 및 작업 부하에 대해여 분석하였다. 중요도 및 작업 부하를 측정하기 위하여 전국의 해상교통관제사를 대상으로 설문을 실시하였으며, 다기준의사결정 기법인 계층화분석과정을 사용하여 결론을 도출하였다. 해상교통관제사의 업무 중요도와 작업 부하의 관계를 고찰하여 향후 해상교통관제 센터에서 관제 구역 설정의 가중치로 사용할 수 있으며, 중요도와 작업부하의 관계를 바탕으로 가변 섹터 운영 등의 자료로 사용할 수 있을 것으로 기대한다.

  • PDF

일량제어정책을 갖는 이산시간 BMAP/G/1 대기행렬의 고객수와 체재시간 분석 (Queue Lengths and Sojourn Time Analysis of Discrete-time BMAP/G/1 Queue under the Workload Control)

  • 이세원
    • 한국산업정보학회논문지
    • /
    • 제29권1호
    • /
    • pp.63-76
    • /
    • 2024
  • 본 논문에서는 D-정책을 갖는 이산시간 BMAP/G/1 대기행렬의 이탈시점 및 임의시점 고객수 분포와 체재시간 분포를 분석하였다. 서로 상관성을 갖는 집단고객(패킷)들이 이산시간 마코비안 도착과정을 따라 시스템에 도착하고, 서버는 도착한 고객들의 서비스시간의 총합이 일량 임곗값을 초과하였을 때 재가동을 시작하여 시스템에 남은 고객이 없을 때까지 서비스한다. 시스템의 안정상태 고객수 분포와 체재시간 분포를 변환 벡터 형태로 유도하고 성능척도로서 평균값을 계산하였다. 수치 예제를 통해 복잡한 형태의 수식으로 나타나는 결과들을 계산하여 얻을 수 있음을 확인하고, 시뮬레이션 결과와 비교하여 이론값의 타당성을 검증하였다. 본 연구의 결과는 다양한 산업 분야에서 유사하게 작동하는 복잡계 시스템의 주요 성능척도들을 구하고 여러 가지 최적화 문제를 분석하는 데 사용할 수 있다.

Workload에 따른 FMS의 버퍼 Capacity 결정에 관한 연구

  • 이정표
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 2000년도 춘계학술대회 논문집
    • /
    • pp.131-136
    • /
    • 2000
  • FMS(Flexible Manufacturing System, 유연생산 시스템)는 1960년대 최초로 소개된 이후, 뛰어난 Throughput과 Flexibility로 지금까지 다양한 생산 현장에서 널리 활용되고 있다. 하지만 복잡한 Part의 흐름, 충분하지 못한 AGV(Automated Guided Vehicle) 등으로 인한 성능 저하는 가장 큰 장애물이라 할 수 있다. 이에 대한 대비책으로 시스템 내에 설치하는 버버는 일시적인 WIP(Work In Process, 재공재고)의 저장공간으로써 Blocking, Starving 등의 발생을 최소화하는 역할을 수행한다. 따라서 이러한 버퍼의 적절한 배치는 시스템 성능에 큰 영향을 미치게 되며, 이에 본 연구에서는 각 Workstation의 Workload를 고려해 각 버퍼의 적절한 Capacity를 결정하는 과정을 소개하며, 제시된 방법론의 실효성을 시뮬레이션을 통해 검증하고자 한다.

  • PDF

일량제어정책과 단수휴가를 갖는 이산시간 대기행렬의 고객수 분석 (Queue Length Analysis of Discrete-time Queueing System under Workload Control and Single Vacation)

  • 이세원
    • 한국산업정보학회논문지
    • /
    • 제25권1호
    • /
    • pp.89-99
    • /
    • 2020
  • 본 논문에서는 유휴기간을 갖는 서버의 재가동이 단수휴가와 그동안 도착한 고객들의 총 일량에 의해 결정되는 이중제어정책을 다룬다. 고객들은 베르누이 도착과정으로 시스템에 한 명씩 도착하며, 자기 차례가 될 때까지 기다렸다가 선착순으로 서비스를 받는다. 서버는 시스템 내에 더 이상 서비스할 고객이 없으면 유휴기간을 가지며, 이와 동시에 이산확률변수 V의 휴가를 떠난다. 휴가 종료시점에서 대기 중인 고객들의 서비스 시간 총합이 일량 임계값 D를 초과하면 바로 서비스를 시작하고, 휴가 종료시점의 시스템 내 총 일량이 D 이하인 경우에는 일량 임계값을 넘길 때까지 기다렸다가 재가동한다. 이러한 혼합제어정책 하에서 운영되는 이산시간 Geo/G/1 대기행렬시스템을 대상으로 하여 유휴기간을 분석하고 안정상태 고객수 분포를 유도하였다.

일량제어정책과 복수휴가를 갖는 이산시간 Geo/G/1 대기행렬의 분석 (Analysis of Discrete-Time Geo/G/1 Queues under Workload Control and Multiple Vacations)

  • 이세원
    • 한국산업정보학회논문지
    • /
    • 제23권2호
    • /
    • pp.29-39
    • /
    • 2018
  • 본 논문에서는 일량제어정책과 복수휴가정책이 혼합된 서버제어정책 하에서 운영되는 이산시간 대기행렬시스템을 다룬다. 고객들은 베르누이 도착과정으로 시스템에 도착하고, 서버는 한대가 운영되며 시스템 내 서비스할 고객이 없으면 유휴기간을 갖는 서버가 이산 확률변수 V만큼의 휴가를 떠났다가 돌아와서 대기 중인 고객들의 총 일량이 임계값 D를 넘길 때까지 휴가를 반복한다. 본 논문에서는 이산시간 시스템을 대상으로 하여 보다 현실적이며 유연한 혼합제어 정책 하에서 운영되는 대기행렬시스템의 안정상태 일량분포를 유도하고 평균일량을 계산하였다. 이는 시스템 내 고객수, 대기시간, 체재시간과 같은 시스템의 여러 성능척도를 분석하는데 기본이 된다.