• Title/Summary/Keyword: whole building

Search Result 773, Processing Time 0.023 seconds

국.공립도서관 비교평가연구 -전국 46개 4년제 대학도서관을 중심으로-

  • 최정태
    • Journal of Korean Library and Information Science Society
    • /
    • v.26
    • /
    • pp.23-56
    • /
    • 1997
  • The purpose of this study is put emphasis on the importance of the library statistics. e. g., more than ten related current library statistics were inaccurated each other, so whole of statistic figures is not to be trusted. This research is make an attempt to more accurate information about library situations. Especially, with special reference to basic library statistics in the [Bulletin of National & College University libraries](Vol. 1-14, 1983-96, published by Council on National College & University Libraries), take the 24 major factors to compare and evaluate with 46 national and public university libraries. Analyzing 24 factors including 5 subjects. These subjects are as follows: 1) Total numbers of staffs with faculty members and students enrollment 2) Whole library collection of monographs and serial and publishcations. 3) Annual university budgets and library material expenditures. 4) Library facilities and building square measure. 5) Library service situation with circulation, inter-library loan/borrow and monograph D/B build up.

  • PDF

A Review on Changes in Spatial Formation of the Sangrojun Area in Tongdo Temple (통도사 상로전 영역의 공간구성 변화 고찰)

  • Hong, Jae-Dong
    • Journal of architectural history
    • /
    • v.10 no.3 s.27
    • /
    • pp.45-60
    • /
    • 2001
  • The Tongdo temple have been transformed continuously since its first establishment about 1300 years ago. Nevertheless three critical elements specified by 'Jajangyulsa', founder of the temple have not varied over the times but rather strengthened and strongly combined. All elements and doctrines of the religion coexist and form a harmony within the whole of the temple. This researcher examined what changes, or combinations, in spatial formation were sought for such unique structures of the Tongue temple by focusing mainly on the Sangrojun area of the temple to obtain the following findings. First. unlike a work by a Japanese researcher 'Sekino Tadashi', the east yard of the main building was found located on the section line which corresponded to the separation line of Yungkuncheokdo(營建尺度=measure running) from the edge of the Keumkangkyedan(金剛戒壇 =Buddhist platform) embankment to the corner column of the Kamrodang. This was confirmed as a result of the review of photos shown in [Chosun Kojukdobo]. Second, the number of stairs used for the Keumkangkyedan was thought to become three when the temple was firstly restored in 1379 as a result that this researcher reviewed Chinese literature 'DoSun' and [Kyedandokyung(戒壇圖經)], records by 'Lee saek' and 'Jung Shihan', studies of Yungkun measure and actual changes in the temple. Then the temple was forth restored in 1705 when the second of the stairs was changed in area and height and at the same time grounded hard for a space for a Buddhist service. Third, the roof of the main building was probably changed in shape during the Koryo period when the plane structure, furnish arrangement, emphasized front, stone lanterns of the building and political factors of that time were all considered. Fourth, the main building was Initially designed to provide a Buddhist sermon service which was assumedly followed by a similar service at a Keumkangkyedan. Thus the main building had a small window on the northern side which might be opened up to look out or otherwise go outside like a door. However, the window was probably locked up like a surrounding wall since the main building was entirely repaired after the end of Japanese invasion of Korea in 1592.

  • PDF

Extension of Typical Meteorological Data and Energy Demand Analysis for Building Energy Efficiency Rating Certification System

  • Lee, Sung-Jin;Kim, Jonghun;Jeong, Hakgeun;Yoo, Seunghwan;Lee, Junghun
    • KIEAE Journal
    • /
    • v.17 no.2
    • /
    • pp.13-20
    • /
    • 2017
  • Meteorological data is one of the important factors in the calculation of building energy demand. The purposes of this study are to review the limitations of the typical meteorological data of ECO2 program and to create the new typical meteorological data and then analyze the building energy demands for additional regions which are not included in the existing 13 region in the ECO2 program. The extended typical meteorological data to a total of 33 regions were based on IWEC(International Weather for Energy Calculations) data files and were created in the form applicable to the building energy efficiency rating certification system. As a result of comparing the heating energy demands of a representative region with the surrounding regions in each of five regions in Korea, the variance of Cv(RMSE) ranged from 36% to 344% and MBE ranged from -32% to 190% for the whole regions. This suggests that the difference of heating energy demand may vary greatly depending on the region where the meteorological data is used and the meteorological data of more detailed regions is needed for reliable calculation of building energy demand.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

A Comparative Study on the Architetural Characteristics of Traditional Korean-Chinese and Chinese Dwellings of Sujoenchon Village in Jilin Province of Northeast China (중국(中國) 길림성(吉林省) 수전촌(水田村)의 조선족(朝鮮族) 주거(住居)와 한족(漢族) 주거(住居)의 비교(比較))

  • Lee, sang-hae
    • Korean Journal of Heritage: History & Science
    • /
    • v.34
    • /
    • pp.138-171
    • /
    • 2001
  • This paper, based on the filed survey conducted from August 14 to 21, 2000, examines the architectural characteristics of traditional dwellings of Sujeonchon(수전촌, 水田村) village. Sujeonchon village is located on the northen slope of Changbaishan Mt., Andohyun(안도현, 安圖縣) of jilin Province(吉林省), a province in the northeastern region of China. The village was established between late 1940's and early 1950's by the Korean-Chinese. Later on, some of the Korean-Chinese residents moved out of the village and presently, the residents are composed of both the Korean-Chinese and the Chinese consisting about fifty-fifty. Since the cultural background and the living custom are different from each other ethnic group, that is, the Korean-Chinese and the Chinese, their dwellings reveal some differences between them. Through the study, the architectural characteristics and distinctions of the Korean-Chinese and Chinese dwellings are found and summarized as follows: 1.The way of building layout is different between them: the Chinese mainly follows the north-south direction of building layout, while the Korean-Chinese considers the surrounding environmental condition. 2.The floor level of kitchen is different between them: that of the Chinese house is same as the outdoor earth level, while that of the Korean-Chinese is lower than the outdoor level. 3.The way of providing the kitchen space is different between them: the kitchen of the Chinese house is consist of one separate room, while that of the Korean-Chinese is open to the living area. 4.The way of heating system is different between them: the Chinese house has kang only at the sleeping area, while the Korean-Chinese install whole under-floor heating of gudeul in the living area. 5.The attitude to the way of building is different between them: the Chinese are easily adapt to the new building materials and construction method, while the Korean-Chinese are showing strong attachment to the traditional way of building. 6.The houses of the Chinese and the Korean-Chinese have their own traditional ornaments and talismans on and in the building.

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

The Improvement of Comprehensive situation management systems of Disaster Report (재난신고 종합상황관리체계 발전방안)

  • Lee, Jung-Il
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.559-580
    • /
    • 2010
  • General Command in the whole situation, managed effectively in order to perform the first briefing room of the reorganization plan and the personnel, the situation room of the business division of the scope(function), information exchange and delivery quickly and accurately to support the computerized Communications equipment and system construction, and various field Construction activities related to the information database construction, and should be made to secure the expertise of management personnel. Building of Computer - communication systems equipment environment for new IT technologies is necessary. From this perspective, the leadership position in the country in the Disaster Management Center in Seoul, organization and personnel, computer systems and communication system status, status of foreign countries like Dispatch managing disaster situations by identifying and analyzing the development plan is aimed to find.

  • PDF

Approach of establishing As-Is BIM Model Process in Apartment Remodeling project using 3D Laser Scanning. (공동주택 리모델링 사업에서 3D 레이저스캐닝 기술을 활용한 기존 구조체 As-Is BIM모델 구축 프로세스 제안)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.183-184
    • /
    • 2015
  • More than 50% of the existing buildings in Korea are over 15 years old. Therefore it is necessary to be held reconstruction or remodeling deteriorated buildings more efficiently. Especially, since remodeling project reserves existing structures, it requires less period of project and construction period compare to reconstruction. It is possible to minimize uncertainty in communication between participants and able to manage information and construct efficiently in remodeling projects. This paper is first step of integrated BIM-based whole lifecyle management of apartment remodeling process. It suggests 3D laser scanner specification factors and site constraint factors for mapping between two groups. Therefore it will contribute to develop mapping algorithm of two groups and find optimal combination for apartment remodeling.

  • PDF

A Study on the Remicon B/P Application and Properties of High Strength Concrete using Crushed Sand (부순모래를 사용한 고강도콘크리트의 특성 및 레미콘 B/P 적용에 관한 연구)

  • Choi, Se-Jin;Lee, Seong-Yeon;Lee, Sang-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.1 s.23
    • /
    • pp.57-62
    • /
    • 2007
  • Generally, the strength of concrete depends on factors of materials, mix proportions, compaction, manufacturing methods and curing and so on. And recently, it has increased the using of crushed sand for concrete due to the exhaustion of good natural aggregate. In case of Korea, in 2004, the using ratio of crushed sand occupies about 28% of whole fine aggregate. This is an experimental study to compare and analyze the influence of W/B ratio and replacement ratio of crushed sand on the fluidity and compressive strength of high strength concrete. For this purpose, the mix proportions of concrete according to the W/B (31.5, 27.5, 23.5%) and replacement ratio of crushed sand (0, 20, 40%) was selected. And then air content, slump-flow, a-lot, compressive strength test were performed.

Elicitation of Key Environmental-Friendly Technologies for Construction Activities Using Cross-Impact Analysis (교차영향분석을 활용한 건설 공종별 주요 친환경기술 도출)

  • Lee, Sanggyu;Kang, Goune;Kim, Chang-Won;Kim, Chunhak;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.155-157
    • /
    • 2012
  • Recently, construction industry makes a great effort on minimizing the environmental impact. While various environmental-friendly technologies are applied to the operating phase of buildings, few equipment or machinery are partly used during the construction phase. For this reason, this study carried out a comprehensive analysis on environmental-friendly technologies for the whole construction process. In this study, appropriate environmental-friendly technologies of each construction activity were elicited to improve the environment of construction sites. Environmental-friendly technologies and construction activities were selected by professional consultation and descriptive statistics analysis, and proper environmental-friendly technologies were elicited from Cross-Impact Analysis. As a result, waste disposal and recycling technology was highly effective for demolition work while development of replacing materials was for reinforced concrete work.

  • PDF