Knowledge concerning the nutritional requirements and nutritional problems of fanned deer is limited. Nutritional recommendations must be based on data from domestic ruminants and fanned deer. An understanding of the biology and adaptative characteristics of wild deer is essential for sensible application of sheep and cattle nutritional principles. Nutritional requirements of deer are generally separated into five categories: energy, protein, minerals, vitamins and water. Research on deer nutrition has primarily focused on energy, protein and minerals (phosphorus and calcium). Changes in the nutritional requirements that occur with gestation, lactation, breeding and antler growth should be coordinated with seasonal changes in nutrient availability from forage plants. This paper describes aspects of current knowledge of energy, protein, minerals, vitamins and water requirements. Nutritional problems of. fanned deer are described with recommendations for prevention or control. A comparison of production efficiency of deer, lamb, beef cattle and dairy cattle is included.
Kim, Joong-Hoon;Geem, Zong-Woo;Lee, Hyun-dong;Kim, Seong-Han
Korean Journal of Hydrosciences
/
v.8
/
pp.31-40
/
1997
Flow carrying capacity of water distribution systems is getting reduced by deterioration of pipes in the systems. The objective of this paper is to present a managerial decision-making model for the rehabilitation of water distribution systems with a mininum cost. The decisions made by the model also satisfy the requirements for discharge and pressure at demanding nodes in the systems. Replacement cost, pipe break repair cost, and pumping cost are considered in the economic evaluation of the decision along with the break rate and the interest rate to determine the optimal replacement time for each pipe. Then, the hydraulic integrity of the water distribution system is checked for the decision by a pipe network simulator, KYPIPE, if discharge and pressure requirements are satisfied. In case the system does not satisfy the hydraulic requirements, the decision made for the optimal replacement time is revised until the requirments are satisfied. The model is well applied to an existing water distribution system, the Seoul Metropolitan Water Supply System (1st Phase). The results show that the decisions for the replacement time determined by the economic analysis are accepted as optimal and hydraulic integrity of the system is in good condition.
Magazine of the Korean Society of Agricultural Engineers
/
v.42
no.2
/
pp.55-62
/
2000
In order to make the reasonable irrigation plan in the unripended tidal reclaimed paddy fields, the estimation of irrigation water requirements by soil textures and water management methods for the normal growth of crops is very important . This study was carried out to determine leaching requirements before cultivating crops. For the purpose of this study, the physical and chemical properties of soil samples used in the desalinization experiments were analyzed, and change of salinity by supplying water and leaching water were investigated in the experimental field with lysimeters. As a result considering the soil textures, desalinization effects of good drainage soils(S1) were better than those of poor drainage soils (S2). In the changes of salinity of the soils with supplying water by water management methods, among the good grainage soils with culvert treatment(S1CW), salinity of S1CW3 with 1, 120mm and S1W4 with 1, 440mm supplying water were 2.6dS/m and 1.1dS/m respectively, and salinity of S1NW4 with 1.680mm among those non-culvert treatment (S1NW) was 3.0dS/m, less than critical salanity value 3.0dS/m. On the other hand, of the poor drainage soils with cultvert treatment , salinity of S2CW3 was ranged 9.4-6.0dS/m with supplied water, and that of non-culverted treatment S2NW as 12.3-8.4dS/m.
We investigated design requirements of vent lines for Sodium-Water Reaction Pressure Relief System of Prototype Generation-IV Sodium-Cooled Fast Reactor. We developed design requirements of areas of the rupture disks of the steam generator, a diameter of the gas vent line of the sodium dump tank, a diameter of the gas vent line of the water dump tank, a diameter of the water dump line of the steam generator. With the design requirements, we calculated the time to vent fluid inside the steam generator and analyzed the transient pressure behavior, also evaluated the close pressure value of the isolation valve of the water dump line. Our results are expected to be used as basis information to design Sodium-Water Reaction Pressure Relief System of Prototype Generation IV Sodium-Cooled Fast Reactor.
Journal of Advanced Marine Engineering and Technology
/
v.38
no.3
/
pp.325-332
/
2014
In installing ballast water treatment system, the cost of the system is high and many technical aspects are to be considered and also it takes significant time to retro-fitting on the existing ships. In addition, in the current circumstance which the Ballast Water Management Convention has not been entered into force, the 28th IMO Assembly adopted a resolution to mediate the implementation schedule of the treatment systems. In the mean time, California State and New York State have declared more stringent discharge requirements of ballast water and are planning to implement them earlier than the schedule of the Convention. In these circumstances, the implication in the difference between ballast water treatment system manufacturers and ship owners need to be considered. In this study, through the review on the considerations when installing the system onboard, stringent requirements of United States of America, and determent or mediated implementation schedules of Convention and California and New York States, the author would like to suggest the strategy of concerned parties for anticipated entrry into force of the Convention and implementation of the stringent requirements of United States of America.
Journal of Advanced Marine Engineering and Technology
/
v.41
no.2
/
pp.163-170
/
2017
The International Convention for the Control and Management of Ships' Ballast Water and Sediments (hereafter "BWM Convention") will be enforced beginning on September 8, 2017. Even though the STCW Convention (International Convention on Standards of Training, Certification and Watchkeeping for Seafarers) and other international instruments require all ship personnel be qualified under certain competencies and standards, the International Maritime Organization (hereafter "IMO") has no unified requirements for training ship personnel on ballast water management. When the BWM Convention enters into force, all officers and crew on board ships should be intimately familiar with the guidelines and procedures outlined by the BWM Convention, regarding, among other topics, proper record keeping techniques and measures, the layout of the ballast control system, methods of ballast water exchange, and inspections by the port state control. To ensure that officers and crew members are adequately familiar, this paper proposes new competency requirements for ballast water management training and education to be added to the STCW Code. To support the introduction of these new competency requirements, this paper explores the evolution of the BWM Convention and examines how international regulations will be used to implement it.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1999.10c
/
pp.41-46
/
1999
In the practice , ET was mainly estimated by Blaney-Criddle or FAO Penman method. But these methods were found to frequently overestimate ET. And calculation of effective rainfall by empirical formula is hardly to explain drop property and soil texture. Since 1990, FAO recommended the adoption of Penman-Moneteith combination method as a new standard for reference ET. Purpose of this study is establish new estimate method of upland crop requirements. We asopt P-M method to estimate ET and set up soil moisture balance equation to equation to calculate effective rainfall and irrigation water requirements. We expect that this new method rise efficiency to upland water management.
Magazine of the Korean Society of Agricultural Engineers
/
v.42
no.6
/
pp.45-55
/
2000
Seasonal water requirements by paddy rice is important to water budgeting for the water resources planning at a basin scale. This paper compares the water requirements resulting from different approaches for the Han River Basin. The demands from the drought years of 1967 and 1968 were found to be significantly less than the irrigation standards. This may result in significant underestimation of the basin-wide water demands. A conversion factor method is proposed to define seasonal irrigation demands. The factor is defined from the ratios of the standards for each growing stage to the drought year demands. The results were compared satisfactorily with those from the irrigation standards, and readily applicable to the water resources planning.
By using the heat recovery of water-cooled chillers, it is possible to reduce the energy operating costs positively and at the same time it could fulfill the heating re-heat air conditioning system as well as the hot water requirements. Basically templifiers are designed to economically to turn the waste heat into useful heat. Waste heat is extracted from a fluid stream by cooling it in the evaporator, the compressor amplifies the temperature of the heat and the condenser delivers the heat to heating loads such as space heating, kitchens and domestic hot water. Design of higher water temperature requirements and split condenser heat recovery chiller system (using of templifiers) produced hotter condenser water approximately up to $60^{\circ}C$ and control the entire heat recovery system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.