• Title/Summary/Keyword: water quality goal

Search Result 128, Processing Time 0.027 seconds

Assessment of the Water Quality of Jungnang Stream by Flow Conditions Using Load Duration Curve (부하지속곡선을 이용한 중랑천의 유량 조건별 수질특성 평가)

  • Choi, Kyung-Wan;Shin, Kyung-Yong;Lee, Hyung-Jin;Jun, Sang-Ho
    • Journal of Environmental Health Sciences
    • /
    • v.38 no.5
    • /
    • pp.438-447
    • /
    • 2012
  • Objective: The objective of this study was to suggest a method through which load duration curve was used to assess the achievement of water quality targets in accordance with the criteria for pollutant load depending on flow rate variation. Methods: The stage-discharge curve and flow duration curve of Jungnang Stream were deduced. Using water quality targets and measurement of the stream, the flow duration curve was also drawn. Based on these, the feasibility of achievement of water quality targets in respect to flow rate was assessed. Results: In terms of the load duration curve of the stream, it was observed that excess of criteria for concentrations of $BOD_5$, $COD_{Mn}$ and SS frequently occurred. On the other hand, when the flow rate was low, the concentrations of T-N and T-P exceeded the criteria. Conclusions: Through the load duration curve, the overall water quality of Jungnang Stream was understood. When the flow rate is high, management of point source of $BOD_5$, $COD_{Mn}$ and SS is needed to achieve water quality targets for Jungnang Stream. On the other hand, when the flow rate is low, the management of non-point source T-N and T-P is necessary to attain the water quality goal.

Development of Water Quality Management System in Daecheong Reservoir Using Geographic Information System (GIS를 이용한 저수지의 수질관리시스템 구축)

  • 한건연;백창현
    • Spatial Information Research
    • /
    • v.12 no.1
    • /
    • pp.13-27
    • /
    • 2004
  • The current industrial development and the increase of population in Daecheong Reservoir basin have produced a rapid increase of wastewater discharge. This has resulted in problem of water quality control and management. Although many efforts have been carried out, reservoir water quality has not significantly improved. In this sense, the development of water quality management system is required to improve reservoir water quality. The goal of this study is to design a GIS-based water quality management system for the scientific water quality control and management in the Daecheong Reservoir. For general water quality analysis, WASP5 model was applied to the Daecheong Reservoir. A sensitivity analysis was made to determine significant parameters and an optimization was made to estimate optimal values. The calibration and verification were performed by using observed water quality data for Daecheong Reservoir. A water quality management system for Daecheong Reservoir was made by connecting the WASP5 model to ArcView. It allows a Windows-based Graphic User Interface(GUI) to implement all operation with regard to water quality analysis. The proposed water quality management system has capability for the on-line data process including water quality simulation, and has a post processor far the reasonable visualization for various output. The modeling system in this study will be an efficient NGIS(National Geographic Information System) far planning of reservoir water quality management.

  • PDF

Improvement of Procedures for Reasonable Implementation of TMDL (수질오염총량관리제의 합리적인 시행을 위한 시행절차 개선방안)

  • Kim, Young-Il;Yi, Sang-Jin
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.8
    • /
    • pp.617-622
    • /
    • 2011
  • The policy of total maximum daily load (TMDL) was introduced to manage wasteload within the loading capacity to achieve water quality standards in the watershed. While the TMDL was implemented, the institutional and technical correction for the improvement of procedure was accomplished even though there were various problems and basically through the process of trial & error. However, a fundamental improvement of this policy is needed to implement the TMDL. This study has come up with a new viewpoint on improving this procedure for reasonable implementation of TMDL. First of all, the water quality and flowrate monitoring of the tributaries should be implemented. This should be done through the establishment of a monitoring system which will include standards of scope, a set time period, water quality parameters and frequency follow ups for the implementation of TMDL. The basic plan in all of the watersheds should be developed based on the establishment of water quality parameters and standards for water use and ecological purposes according to the results of the water quality and flowrate monitoring in the watersheds. The implementation plan for water quality improvement should be established in the watersheds where exceeds the targeted water quality standards. The performance assessment of TMDL should be conducted every year to meet the satisfaction assessment of water quality standards in the watersheds. Finally, if the water quality standards in the watersheds can not be attained or the water quality parameters and standards should be changed, the implementation procedure will be performed according to the iterative process. On the contrary, the policy of TMDL in the watersheds where the water quality standards have been met the goal will be finished.

Water Quality Management Strategies Evaluation of Juam Lake by A Fuzzy Decision-Making Method (퍼지 의사결정법에 의한 주암호 수질관리 전략 평가)

  • Lee, Yong Woon;Hwang, Yun Ae;Lee, Sung Woo;Lee, Byong Hi;Choi, Jung Wook
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.22 no.4
    • /
    • pp.699-712
    • /
    • 2000
  • Juam lake is a major water resource for the industrial and agricultural activities as well as the resident life of Kwangju and Chonnam regions. However, the water quality of the lake is getting worse due to a large quantity of pollutant inflowing to the lake. Thus, the strategy for achieving the water quality goal of the lake should be developed as soon as possible. When there are various alternatives that can be used as the strategy, several criteria based on the achievement degree of water quality goal, the applicability of technique and social environment, and the reasonableness of the cost required are made to evaluate and rank the alternatives. However, it is difficult to make a decision when there are multiple criteria and conflicting objectives and specifically the estimated values of criteria contain elements of uncertainty. The uncertainty stems from the lack of available information, the randomness of future situation, and the incomplete knowledge of expert. As the degree of uncertainty is higher, the decision becomes more difficult. In this study, a fuzzy decision-making method is presented to assist decision makers in evaluating various alternatives under uncertainty. The method allows decision makers to characterize the associated uncertainty by applying fuzzy theory and incorporate the uncertainty directly into the decision making process for selecting the "best" alternative so decisions can be made that are more appropriate and realistic than those made without taking uncertainty in account.

  • PDF

A Study on the Swelling Property of Bentonite Mat under Salt Water Condition (담수환경하에 노출된 일반 벤토나이트 매트재의 팽윤성능 평가)

  • 양승도;김영삼;유재강;오상근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.81-84
    • /
    • 2002
  • Recently Bentonite mat is applied various structure : External waterproofing for underground structure, A reclaimed land, Artificial lake, Large-scaled civil structure, etc. With these various structure environment, water quality for application of Bentonite Mat affects watertightness. Specially spot with a large quantity of Chloride ion like salt water, degree of watertightness revelation is evaluated and applied. In this study, it is a main goal to investigate watertightness of Bentonite Mat with distilled water and salt water dissolved chloride ion Contents 0.88%. The result of this paper is as follows. 1) Water permeability coefficient of Bentonite Mat : distilled water(1.21$\times$10$^{-9}$cm/sec), salt water(3.12$\times$10$^{-7}$cm/sec). 2) Variation of thickness : distilled water(187%), salt water(108%). 3) Swelling ratio : distilled water(1500%), salt water(350%).

  • PDF

Reasonable Decision Making for Sustainable Water Supply Source Management (상수원의 지속가능한 관리를 위한 합리적 의사결정 방향)

  • Choi, Ji Yong
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.4
    • /
    • pp.504-511
    • /
    • 2007
  • Built-out issue of copper processing appearing recently in the Paldang watershed is a critical problem to deteriorate the basic framework of national water management policy as well as to be simply a copper-related problem. Up to now, Korea government has invested hard and relevant upstream areas have been victimized readily in a variety of field to comply its goal of 'Safe Water Supply'. Because of the reason, the desirable water quality level of the Paldang watershed has been maintained regardless of its dense population. Paldang drinking water management policy is based on residents' understanding which is considered as a 'social capital'. The issue raised in the aspect of water quality management policy should be reviewed on the basis of the 'social capital' concept. One regarding semiconductor industry as a potential industry to export many products in 10 years insists that the industry not be a simple private business but be a prominent part for national competitiveness. There is no doubt about this opinion. However, a nation should support environmental right-to-life of its people prior to any other tasks. In other words, it is really risky to give up people's right due to economic benefits. Therefore, it should not happen to trade 'life', the dignity of man, with national competitiveness which is likely to be preferred in these days. In addition, coherent policy not to destroy 'social capital' promoting Paldang drinking water resource management policy should be maintained.

Towards a novel approach to improve drinking water quality at Dhaka, Bangladesh

  • Serajuddin, Md.;Chowdhury, Md. Aktarul Islam
    • Environmental Engineering Research
    • /
    • v.23 no.2
    • /
    • pp.136-142
    • /
    • 2018
  • The river water source of Saidabad Surface Water Treatment Plant at Dhaka, Bangladesh, is deteriorated too much to be treated by conventional treatment process due to excessive ammonia pollution. In order to improve the raw water quality before it enters into the main treatment chain, a pilot study was conducted for pre-treatment of the raw water. The objective is to investigate the rate of reduction of ammonia using the Meteor pilot, a biological pretreatment system, which is a laboratory scale Moving Bed Biofilm Reactor with a nominal volume of hundred liters, filled with 50 L of Meteor 660 media. The reduction of ammonia was quite significant on average 73%, while the reduction of COD was in a range from 20 to 60%. The Meteor pilot was able to treat and nitrify the raw water and produce an effluent that respects the guarantee of ammonia < $4.0mg\;NH_3-N/L$ when the raw water ammonia concentration was < $15mg\;NH_3-N/L$. The study identified operating parameters necessary to achieve the desired goal of adequate ammonia removal. The study results would benefit a range of systems across the country by providing guidance on the design and operation of a biological pre-treatment system for ammonia removal.

Characterization on the Variation of Streamflow at the Unit Watershed for the Management of Total Maximum Daily Loads - in Guem River Basin - (수질오염총량관리 단위유역의 유량변화 특성분석 - 금강수계를 대상으로 -)

  • Park, Jun Dae;Oh, Seung Young;Choi, Ok Youn
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.6
    • /
    • pp.914-925
    • /
    • 2011
  • The variation of streamflow is regarded as one of the most influential factors on the fluctuation of water quality in the stream. The characteristics of the variation should be taken into account in the plans for the management of Total Maximum Daily Loads (TMDLs). This study analysed and characterized spatial distribution and temporal variation of streamflow at each unit watershed in Guem-river basin. For the analysis of the distribution of streamflow, the type and the extent of the distribution were investigated for the unit watershed. For the analysis of the variation, short and long term changes of streamflow were examined. The result showed that most of the distributions were not log-normalized and the extent of variation tends to be greater at the unit watershed placed on the tributaries in the basin. A kind of margin could be granted to the unit watershed involving high variations so as to establish the water quality goal and load allotment more reasonably and effectively in view of whole waterbody.

The Research about the Water Quality Prediction at Imha Reservoir Using a WASP7 Model (WASP7 모형을 이용한 임하호 수질모의에 관한 연구)

  • Ahn, Seung-Seop;Seo, Myung-Joon;Jung, Do-Joon;Park, Ro-Sam
    • Journal of Environmental Science International
    • /
    • v.17 no.6
    • /
    • pp.611-621
    • /
    • 2008
  • This study intends to provide the necessary basic data needed for predicting the water quality and examining changes in water quality on the basis of the hydrological changes: an outflow or the character of a flow by investigating the interaction of the parameters through the estimation of optimal parameters need for predicting the water quality of the dam basin and the sensitivity among those estimated parameters. Im-Ha Dam in the upstream area of the Nakdong River was selected for analysis, and the water quality survey data necessary for parameter estimation was based on the monthly water quality data (water temperature, BOD, T-N and T-P) between December 1, $2005{\sim}$November 31, 2006. K1C(the saturated growth rate of plant plankton), K1RC (endogenous respiratory quotient of plankton), KDC(deoxidized ratio), K71C(minealized ratio of dissolved organic phosphorus), K83C(mineralized ratio of dissolved organic nitrogen) have been considered as the factors of the water quality performed in this water quality simulation, that is, the most effective parameters on BOD, T-N and T-P. In the result of the analysis of the sensitivity, KDC(deoxidized ratio) was the most sensitively reacted parameter on BOD and it was K71C(mineralized ratio of dissolved organic phosphorus) and K83C(mineralized ratio of dissolved organic nitrogen) on T-N and T-P. It is considered that it will be possible to apply the most optimal parameter to an analysis of the water quality simulation at Im-Ha Ho basin in the goal year by examining the interaction of the parameters through the parameters sampling which are able to applicable to prediction of the water quality and the analysis of the its sensitivity, in the future, also the analysis on the basis of the hydrological conditions: an outflow or the character of a flow will be needed.

Analysis of Algal Species and Movements in Juam Lake (주암호의 조류 출현종 및 거동 분석)

  • Lee, Yong Woon;Chung, Seon Yong;Bae, Sang Ok;Moon, Yang Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.8 no.4
    • /
    • pp.37-45
    • /
    • 1999
  • Juam Lake is a major water resource for the industrial and agricultural activities as well as for the resident life of Kwangju and Chonnam regions. However, the water quality of the lake is getting worse due to a large quantity of pollutant inflowing to the lake. The excessive growth of algae by the overfertilization may result in water treatment problems and also the interference with desirable water uses of navigation, aesthetics, recreation and fish maintenance. Therefore, the purpose of this study is to analyze algal species and movements in Juam Lake in order to use as basic data in making the countermeasure to achieve the water quality goal of the lake. The results of the analysis show that (1) the predominant species of algae are Microcystis aeruginosa, Anabaena affinis, Melosira granulata, Synedra acus, and Coelastrum cambricum, (2) their groups are changed in order of diatoms, green algae, and blue-green algae with the lapse of time, and (3) the distance of the vertical movements of algae for 24 hours is about 2m.

  • PDF