• Title/Summary/Keyword: water operation

Search Result 4,054, Processing Time 0.036 seconds

Water Quality Behavior by the Sluice Gate Operation of Freshwater Lake (배수갑문 방류시점 및 방류량에 따른 담수호의 수질변화)

  • 김선주;김성준;김필식;이창형
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.1
    • /
    • pp.91-101
    • /
    • 2003
  • Boryeong Seadike located at southwestern seashore of Korean peninsula completed in 1997. Sluice gate operation can be an important factor to maintain lake water quality and reduce retaining time of pollutants within lake. The lake water quality simulation model, WASPS was adopted and tested to find out proper gate operation timing and discharge amount. From the simulation of sluice gate operation, the results showed that the later the time of discharge for loosing 1 day successively to 6 days, the better the quality of water. Discharge amount showed relatively minor changes of water quality. This means that pollutants flowed into lake from watershed do not have enough time to mix up with deep water when the gate opened at early time. About 3 days delay of discharge caused the dilution effect to stabilize the lake water quality in case of Boryeong freshwater lake.

Bhumipol Dam Operation Improvement via smart system for the Thor Tong Daeng Irrigation Project, Ping River Basin, Thailand

  • Koontanakulvong, Sucharit;Long, Tran Thanh;Van, Tuan Pham
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.164-175
    • /
    • 2019
  • The Tor Tong Daeng Irrigation Project with the irrigation area of 61,400 hectares is located in the Ping Basin of the Upper Central Plain of Thailand where farmers depended on both surface water and groundwater. In the drought year, water storage in the Bhumipol Dam is inadequate to allocate water for agriculture, and caused water deficit in many irrigation projects. Farmers need to find extra sources of water such as water from farm pond or groundwater as a supplement. The operation of Bhumipol Dam and irrigation demand estimation are vital for irrigation water allocation to help solve water shortage issue in the irrigation project. The study aims to determine the smart dam operation system to mitigate water shortage in this irrigation project via introduction of machine learning to improve dam operation and irrigation demand estimation via soil moisture estimation from satellite images. Via ANN technique application, the inflows to the dam are generated from the upstream rain gauge stations using past 10 years daily rainfall data. The input vectors for ANN model are identified base on regression and principal component analysis. The structure of ANN (length of training data, the type of activation functions, the number of hidden nodes and training methods) is determined from the statistics performance between measurements and ANN outputs. On the other hands, the irrigation demand will be estimated by using satellite images, LANDSAT. The Enhanced Vegetation Index (EVI) and Temperature Vegetation Dryness Index (TVDI) values are estimated from the plant growth stage and soil moisture. The values are calibrated and verified with the field plant growth stages and soil moisture data in the year 2017-2018. The irrigation demand in the irrigation project is then estimated from the plant growth stage and soil moisture in the area. With the estimated dam inflow and irrigation demand, the dam operation will manage the water release in the better manner compared with the past operational data. The results show how smart system concept was applied and improve dam operation by using inflow estimation from ANN technique combining with irrigation demand estimation from satellite images when compared with the past operation data which is an initial step to develop the smart dam operation system in Thailand.

  • PDF

A1gorithm Embodiment for Automatic Pump Operation Pattern (원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현)

  • Byun, Doo-Gyoon;Yoon, Young-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

Development of Integrated Water Operation System through Engineering Standardization (표준화를 통한 통합형 수(水)운영시스템의 개발)

  • Han, Geung-Jeon;Kim, Jin-Mun;Jeon, Hwa-Sung;Lee, Kyung-Woo
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.17 no.6
    • /
    • pp.602-609
    • /
    • 2011
  • In this paper, we standardized the water operation system picture, process control logic, realtime database and system configuration. All aspects, including monitoring & controlling processes, symbols such as pumps, valves and pipes were standardized. As a result we have developed a specialized Integrated water operation system, iWater. We have developed a variety of advanced application programs that are essential for water treatment systems, such as IWS (Integrated Warning system), MBO(modbus opc)/LSE(LS ethernet) driver, video monitoring, self diagnosis system, network monitoring, etc. IWS prevents water supply accidents by using a variety of alarms and warning messages. Drivers have the flexibility to communicate with other 3rd party systems. We expect that iWater will eliminate any concerns regarding water-related issues while also promoting the production and fair distribution of clean water.

Operation and Diagnosis of DAF Water Treatment Plant at Highly Turbid Raw Water (고탁도시 DAF 정수장의 운영 및 진단)

  • Kwon, Soon-Buhm;Ahn, Hyo-Won;Kang, Jun-gu;Son, Byong-Yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.2
    • /
    • pp.191-200
    • /
    • 2004
  • DAF process has been designed considering raw water quality characteristics in Korea. Although direct filtration is usually operated, DAF is operated when the freshwater blooms occut or raw water turbidity become high. Pre-sedimentation iS prepared in case when raw water turbidity is very high by rainstorms. A main feature of this plant is that the operation mode can be changed (controlled) based on the characteristics of raw water to optimize the effluent quality and the operation costs. Treatment capacity (surface loading rate) and efficiency of DAF was found to be better than conventional sedimentation process. Moreover, low-density particles (algae and alum flocs) are easily separated while it is difficult to remove in sedimentation. One of the main concerns in adoption of DAF (Dissolved Air-Flotation) process is a high raw water turbidity problem. That is, DAF is not adequate for raw water, which is more turbid than 100NTU. In order to avoid this problem, pre-sedimentation basins are prepared in DAF plant to decrease the turbidity of DAF influent. For simulation of the actual operation, bench and full-scale tests were performed for highly turbid water conditions. Consequently, DAF process coupled with sedimentation is suggested that pre-sedimentation with optimum coagulation prior to DAF would be appropriate.

Evaluation for conjunctive operation of multi-regional water supply system through risk analysis (위기대응 취약성 분석을 통한 광역상수도 연계운영 평가)

  • Hwang, Jinsoo;Choi, Taeho;Hong, Gonghyun;Lee, Doojin;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.33 no.4
    • /
    • pp.269-279
    • /
    • 2019
  • This study would present a risk analysis method to evaluate stable tap water supply in a multi-regional water supply system and propose a measure for the evaluation of the effect of the conjunctive operation of the multi-regional water supply system using this. Judging from the vulnerability for the crisis response of the entire N. multi-regional water supply system, as compared to the result of Scenario 1 in which no conjunctive pipes were operated, it was found that in Scenario 2, in which conjunctive pipes were partially operated, the vulnerability of crisis response decreased by about 30.6%, and as compared to Scenario 3, the vulnerability of crisis response decreased by 86.2%. In setting a plan for stable tap water supply in N multi-regional water supply system, using the estimated value and the method for the evaluation of the vulnerability of crisis response by pipe, by interval and by line, it is judged that this can be utilized as a basis for the judgment of the evaluation of the operation or the additional installation of conjunctive pipes.

Improvement of Drought Operation Criteria in Agricultural Reservoirs (농업용 저수지 이수관리를 위한 저수율 가뭄단계기준 개선)

  • Mun, Young-Sik;Nam, Won-Ho;Woo, Seung-Beom;Lee, Hee-Jin;Yang, Mi-Hye;Lee, Jong-Seo;Ha, Tae-Hyun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.4
    • /
    • pp.11-20
    • /
    • 2022
  • Currently, the operation rule of agricultural reservoirs in case of drought events follows the drought forecast warning standard of agricultural water supply. However, it is difficult to preemptively manage drought in individual reservoirs because drought forecasting standards are set according to average reservoir storage ratio such as 70%, 60%, 50%, and 40%. The equal standards based on average water level across the country could not reflect the actual drought situation in the region. In this study, we proposed the improvement of drought operation rule for agricultural reservoirs based on the percentile approach using past water level of each reservoir. The percentile approach is applied to monitor drought conditions and determine drought criteria in the U.S. Drought Monitoring (USDM). We applied the drought operation rule to reservoir storage rate in extreme 2017 spring drought year, the one of the most climatologically driest spring seasons over the 1961-2021 period of record. We counted frequency of each drought criteria which are existing and developed operation rules to compare drought operation rule determining the actual drought conditions during 2016-2017. As a result of comparing the current standard and the percentile standard with SPI6, the percentile standard showed severe-level when SPI6 showed severe drought condition, but the current standard fell short of the results. Results can be used to improve the drought operation criteria of drought events that better reflects the actual drought conditions in agricultural reservoirs.

Determination of Optimal Operation Water Level of Rain Water Pump Station using Optimization Technique (최적화 기법을 이용한 빗물펌프장 최적 운영수위 결정)

  • Sim, Kyu-Bum;Yoo, Do-Guen;Kim, Eung-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.337-342
    • /
    • 2018
  • A rain water pumping station is a structural countermeasure to inland flooding of domestic water generated in a urban watershed. In this study, the optimal operation water level of the pump with the minimum overflow was determined based on the opinions of the person in charge of the operation of the rain water pump station. A GA (Genetic Algorithm), which is an optimization technique, was used to estimate the optimal operation water level of the rain water pump station and was linked with SWMM (Ver.5.1) DLL, which is a rainfall-runoff model of an urban watershed. Considering the time required to maximize the efficiency of the pump, the optimal operating water level was estimated. As a result, the overall water level decreased at a lower operating water level than the existing water level. For most pumps, the lowest operating water level was selected for the operating range of each pump unit. The operation of the initial pump could reduce the amount of overflow, and there was no change in the overflow reduction, even after changing the operation condition of the pump. Internal water flooding reduction was calculated to be 1%~2%, and the overflow occurring in the downstream area was reduced. The operating point of the pump was judged to be an effective operation from a mechanical and practical point of view. A consideration of the operating conditions of the pump in future, will be helpful for improving the efficiency of the pump and to reducing inland flooding.