• 제목/요약/키워드: waste treatment facility

검색결과 176건 처리시간 0.024초

폐기물 처리시설 입지선정 평가기준 설정에 관한 사례연구 (A Case Study on the Establishment of Assessment Standards for the Site Selection of Waste Treatment Facility)

  • 정종관;장원
    • 환경영향평가
    • /
    • 제6권2호
    • /
    • pp.137-152
    • /
    • 1997
  • The siting process of municipal solid waste treatment facility consists of a structured set of policies that guide the implementation of waste management goals. The main problems of siting process are the social and political context or the community opposition. During the past, the traditional siting process has been obsolete in most pans of the country, so public officials and researchers have tried to experiment with new policies and procedures. A number of controversial issues offer insight into the factors that are related to the local residents opposition to new waste treatment facilities. The purpose of this case study focused on the establishment of criteria in the site selection of waste treatment facilities which can carry out resources recovery. incineration and landfill simultaneously. That is to say. the main points are to make concrete the quantification standards of assignment and take an objective allotment scale according to the assessment factors. The summarized results are as follows; 1. To promote the site selection based on the guideline such as rational. objective and due process of law, it is desirable to inform the local residents the methods of assessment in advance. 2. Totally 20 factors for the site selection are divided into 3 categories such as living environment characteristics, technological location characteristics and socio-economic factors. And the supposed magnitude of weight in all items are equally applied. 3. In regard to 20 assessment factors, the allotment of point is distributed by the specific location characteristics. Namely to make the assessment easily, each factors are set the scale from 1 to 5 points en masse along the data which are acquired in the region.

  • PDF

방사성폐기물 유리화설비의 배기가스 처리계통 운영 사례 연구 (A Case Study on Operation of Off-Gas Treatment System of Radioactive Waste Vitrification Facility)

  • 이혜현;박규원
    • 대한환경공학회지
    • /
    • 제38권5호
    • /
    • pp.249-254
    • /
    • 2016
  • 본 연구에서는 상용 유리화설비 설계를 위한 기초자료에 도움이 되고자 용융공정에서 발생되는 배기가스의 특성과 배기가스 처리계통 운영사례를 조사하였다. 유리화설비 운영의 목적은 용융공정으로 투입된 방사성폐기물 내에 함유되어 있는 유해물질과 용융공정 내에서 발생된 다양한 화학종을 함유하고 있는 유해 배기가스를 처리하는 것이다. 유리화설비를 건설, 운영하기 위해서는 안전성 분석을 통한 인허가가 필수적이며, 부산물로 발생하는 방사성핵종이나 유해물질을 법적 환경배출규제치 이하로 처리하는 것이 매우 중요하다. 이를 위해서는 배기가스의 특성을 정확히 파악하여 그 특성에 따라 적절한 배기가스 처리공정을 설계해야 한다. 따라서 적절한 배기가스 처리계통을 설계하는 데는 폐기물 발생 특성, 용융로 특성, 배기가스 규제지침, 배기가스 발생 특성, 배기가스 처리장치에 대한 성능 평가 등의 광범위한 요소를 고려해야 한다.

음식물류 폐기물 활성탄의 제조 및 중금속 흡착특성 (Heavy Metal Adsorption Characteristics and Produced of Food Waste Activated Carbon)

  • 이준희;이승철;주민;김지혜;이돈길
    • 한국환경과학회지
    • /
    • 제24권12호
    • /
    • pp.1601-1608
    • /
    • 2015
  • This study evaluates heavy metal(Cu and Cr) adsorption characteristics produced from food waste charcoal extracted in an optimal operation condition after analyzing activated charcoal of iodine adsorption and heavy metals that derived from an activation process of carbide by the developed by-products of food waste treatment facility using the methods from previous studies. As experiment apparatus, this study used a tube-shaped high temp furnace. The mixing ratio of by-products of food waste treatment facility, carbide, and activation component($ZnCl_2$) was 1:1. The experiment was proceeded as adjusting the activation temperature from 400 to $800^{\circ}C$ and activation time from 30 to 120 minutes. The optimal activation condition for iodine absorption was 90 minutes at $700^{\circ}C$ and by using the produced food waste charcoal, this study conducted an experiment on absorption of heavy metals (Cu and Cr) as changing pH of artificial wastewater and stirring time. As a result, pH 7 showed the highest heavy metal decontamination ratio and in terms of stirring time, it revealed balance adsorption after 10 minutes. This result can be particularly applied as basic data for recyclability of high concentration organic waste, by-products of food waste treatment facility, as an food waste charcoal.

음폐수 공공하수처리시설 연계처리 타당성 평가 - P시 사례 - (Feasibility Study on the Treatment of Food Waste Leachate in Municipal Wastewater Treatment Facility - Case of P city -)

  • 박종훈;강신영;김상현
    • 유기물자원화
    • /
    • 제24권2호
    • /
    • pp.41-49
    • /
    • 2016
  • P시에서는 음폐수 처리를 위해 병합처리시설을 설치하였으나, 음폐수 발생량 대비 처리용량이 부족한 실정이다. 또한 병합처리시설 방류수는 인근 바다로 직방류 되고 있어 환경적 문제가 발생할 수 있다. 따라서 본 연구에서는 P하수처리장을 대상으로 P시 발생 음폐수 처리 초과 분량 및 병합처리시설 방류수 연계처리 가능성을 검토하였다. 예상 가능한 4개의 시나리오를 세운 후, 각각의 최대 음폐수 및 병합처리시설 방류수 허용 투입량을 산정 하고, 투입 후 P하수처리장 유입수 성상 변화및 시나리오별 예상 처리비용을 비교 하였다. 검토된 모든 시나리오에서 환경부의 음폐수 병합처리 업무지침을 준수하면서 음폐수 및 병합처리시설 방류수 대부분을 P하수처리장에 연계 처리 가능하며 하수처리장 부하에도 큰 영향을 주지 않을 것으로 산정 되었다.

폐기물처리시설 입지선정에 따른 사례연구 (A Case Study for Site Selection of the Waste Treatment Facilities)

  • 이해승
    • 환경위생공학
    • /
    • 제19권1호
    • /
    • pp.24-36
    • /
    • 2004
  • This study is to investigate the present condition of waste disposal establishment and to analysis problems which could be produced at location selection formalities of waste disposal establishment. It proposed building methods of waste disposal establishment to lead spontaneous participation of local resident according to case analysis of waste disposal establishment. There are research results; i) Opposition of inhabitants was the majority of reason at the business abandonment or delay of waste disposal establishment. Therefore agreement formation course with local inhabitants is most important position. ii) Many estimate have been needed for waste disposal establishment, but support estimate of government was 30-50% that is really low compare with other environmental establishment. So that it need to increase of government estimate. iii) Location collection is carried out based on law and final collected location must be executed without delay of relation business as soon as possible. iv) Standard of location collection has to divide into small, middle and large size and to apply with same rule according to divided location. v) It must be change public subscription before and location selection after and maintain continuance of information offer to local inhabitants and offered information. vi) after building of waste disposal establishment for solving distrust of waste disposal establishment. It must be planed and carried on useful support countermeasure to local inhabitants in actuality.

농촌 주거지역 쓰레기소각으로 인한 산불화재 개선방안에 관한 연구 (A Study on the Improvement Method of Forest Fire Caused by Waste Incineration at the Farming Residential Area)

  • 이영삼
    • 대한안전경영과학회지
    • /
    • 제18권3호
    • /
    • pp.9-15
    • /
    • 2016
  • Currently the forest area is 6,370,000 hectare (ha) which occupies 63.7% in Korea. The forest has good functions such as production of forest products, conservation of national land, prevention of disasters, etc. However constructing houses near the forest area make bad situation like illegal waste incineration by resident. So research subject is forest fire caused by waste incineration place including facility. And this study was conducted about statistical analysis and research analysis of the 100 waste incineration places including facilities at the country town. Statistical analysis shows that March is 27% which percentage is the highest number of forest fire in 10 years' average. The number of forest fire caused by waste incineration is 45 which is the third highest number in the fire statistic. The distance between waste incineration place including facility and forest area is 30m, 40m and 50m. That 40m (36%) is the most common distance from forest area. The types of waste incineration are ground (62%), the temporary facility made with oil drum can (35%) and other made with steel sheet, concrete, etc. The result of this study is that government and local government must conduct the improvement measure to reduce illegal incineration such as waste pickup area made with rain and wind proof type installed near residence, expenses for waste treatment, enlightenment and training, etc. Also considering their age and income are needed for realistic improvement.

연소 또는 소각 과정에서 발생하는 배기가스의 폐열 회수 설계 방법에 관한 연구 (Study on the Heat Recovery Design Methods for the Flue Gas from Combustion and Incineration Processes)

  • 이찬;정봉진
    • 청정기술
    • /
    • 제5권2호
    • /
    • pp.53-61
    • /
    • 1999
  • 대형 산업용 환경폐기물 처리 및 열병합 플랜트의 연소 및 소각 공정 후 발생하는 배기가스의 폐열회수장치 설계 방법을 제시하였다. 본 연구는 폐열회수장치의 기본 설계 개념을 폐열회수를 위한 보일러와 폐열을 이용한 증기 동력 사이클로 구성되는 것으로 가정하였고, 폐열회수장치에 필요한 각 구성요소들에 대한 모델링 기법과 그에 따른 설계 기준 및 설계 개념을 기술하였다. 또한 본 설계방법을 이용하여, 동일한 배기가스 조건에 대해, 폐열회수 보일러의 작동 압력 및 폐열회수 열교환기 설계에 따라 폐열회수장치의 열성능이 어떻게 변화되는지를 검토하였다.

  • PDF

폐기물처리 시설 입지선정 효율화 방안을 위한 사례연구 (A Case Study on Simplified Assessment Method for Site Selection of the Waste Treatment Facilities)

  • 장성호;손영일
    • 환경위생공학
    • /
    • 제15권2호
    • /
    • pp.85-94
    • /
    • 2000
  • The comparative evaluation is the most effective method for site selection because the selection of waste treatment facility is to determine the optimum site out of limited candidate sites. This study adopted the ordinal scale evaluation, one of methods of comparative evaluation. The ordinal scale evaluation aims to determine the investigating items referring to the character of sites, to determine the importance factors for investigating items, and to determine the optimum site according to the quantitative evaluation. This study has focussed on reflecting the opinion of residents to the maximum extent with a weight on social and economic aspects, considering the state of confrontation against each other between the autonomous government organization and local residents, which is being emerged as a social issue relating to the evaluation rating on each item of site selection of an optimum site. Therefore, rational, and clear validity investigations and proper reduction of both time and expenses in site selection as well through this a study.

  • PDF

A Remote Monitoring and Control System for Waste Treatment Facility via Public Communication Network.

  • Jung, Jae-Hak;Choi, Jin-Yong
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.124.2-124
    • /
    • 2001
  • The research for development of remote monitoring and control systems composed three stages of research categories. At the first stage, we decided the suitable instrumentation devices for interface between H/W systems and waste water treatment facility. And at the second stage, we developed the software package for remote monitoring and data transmission system including data receipt system via wired telephone line. At the final stage we developed local control system for auto-process control of waste water treatment facilities. For the first stage of research we developed the a drawing of design the instrumentation and selected optimal sensors or monitoring basic important data. After the first stage research we developed the software package with Graphic User Interface(GUI) ...

  • PDF