Measurement of Verticality and Joint Gaps of a Near-surface Disposal Facility Vault Through a Mock-up Test for Fill-up Stages (표층처분시설 처분고의 목업테스트를 통한 채움단계별 수직도 및 이음부 벌어짐 측정)

  • Choi, Dong-Ho;Ann, Ki-Yong;Choi, In-Yong;Lee, Hyuk-Jin
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.4
    • /
    • pp.537-544
    • /
    • 2021
  • In order to describe the fill-up stages of a near-surface disposal facility vault, a mock-up test is performed, and its behavior during the fil l -up stages is investigated. On an in-site concrete foundation with a l ength of 6600mm, a width of 6600mm and a thickness of 400mm, a reinforced concrete disposal vaul t is manufactured with 4 precast (PC) corner wal l s and 8 PC side wal l s. 36 wasted drums are pl aced on the 1st fl oor in 6 by 6, and then the empty space is fil l ed with grout fil l er. These processes are repeated up to the 5th floor, and the verticality and the joint gaps are measured for each fill-up stage. The verticality is measured using a level at 6 positions on each side wall (3 positions on the left and right sides, respectivel y), i.e. a total of 24 positions on the 4 side wal l s. The joint gaps are measured at 9 positions on each side wal l (3 positions on the left, center and right sides, respectively), I.e. a total 36 positions on the 4 side walls. To measure the joint gaps, crack tips are installed on the left and right sides of every joint gap, and vernier calipers are used. The measured verticality obtained through the mock-up test was found to be ±0.1° based on the initial stage (ST0), and the result of the joint gap was up to 0.38mm. This appears to have a negligible effect on the structure.

An Experimental Study on Workability for Practical Use of High-Performance Concrete (고성능 콘크리트의 실용화를 위한 시공특성에 관한 실험적 연구)

  • Yang, Keun-Hyeok;Lee, Young-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.139-146
    • /
    • 2003
  • The special requirements of high-performance concrete(HPC) could be enhanced property over others such as compressive strength, durability, and construction practices. In order to satisfy these requirements a series of laboratory trial mixes and following mock-up test of reinforced concrete wall at field were performed in this study. The objective of this study was to quantitatively evaluate the workability, compressive strength, and the increased heat of hydration caused by the increase of the specific weight of cement according to various variables. Six example series designed about a minimum compressive strength of 500kgf/$\textrm{cm}^2$ at 28 days, and an approximately slump and slump flow of 25cm and 60cm respectively were tested. The selection process of the specific weight of water and the percentage of fly-ash transposition determined to be most suitable for the production of HPC is presented in the following paper.

Drive Performance Analysis of Climbing Hydraulic Robots System for Construction Automation (시공자동화를 위한 크라이밍 유압시스템의 구동성능 분석)

  • Kang, Go-Une;Lee, Myung-Do;Lee, Kyu-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.33-36
    • /
    • 2010
  • The attention in construction Automation is getting higher since it could be the answer to the lack of skilled labor by decrease in construction population and aging which adversely affects productivity and quality in the construction site. We are on the way to develop a construction automation system adequate for domestic circumstances in Korea; it is called RCA(Robotic-crane based Construction Automation)system. Climbing hydraulic robots system is a part of RCA system and makes Construction factory(CF) climb through the guide rail on the core wall. The safety of climbing hydraulic robots system is at issue due to the overloaded weight of CF. Preventing this issue, present study did the design verification through the structural analysis and the simulation. Mock-up test also was done to analyze the drive performance of climbing hydraulic robots system.

  • PDF

Thermal Performance of Developed Cladding Systems on Multi-Family Residential Buildings (공동주택에 적용 가능한 건식 외벽시스템 시공에 따른 단열성능 검토)

  • Hong, Goopyo;Kang, Ji-Yeon;Kim, Hyung-Geun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.267-268
    • /
    • 2018
  • The purpose of this study was to analyze the thermal performance of a cladding system which developed for easy maintenance and flexibility and installed on a long-life housing. The developed cladding systems were finished mock-up test at an authorized certification laboratory and were satisfied with the standard of the external wall system. The surface temperature and linear thermal transmittance of the cladding system were investigated by using the THERM as a simulation program. The joining part between the cladding systems had a weakness of condensation resistance. The surface temperature of the joining part was improved by filling and adding insulation.

  • PDF

Evaluation of Vibration and Structural Performance of an Innovative Sliding Step Steel Stair Using Full-Scale Mock-up Test (실물대 목업실험에 의한 슬라이딩스텝 철골계단의 진동 및 구조성능 평가)

  • Kim, Sung Yong;Lee, Cheol Ho;Kim, Na Eun;Cho, Sung Sang;Chung, Woon Ok
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.6
    • /
    • pp.511-522
    • /
    • 2014
  • In this study, an innovative steel stair system is presented which enables rapid erection and high quality control in both residential and office building construction. This system features two lightweight steel stringers of box shape, bolted connections easy to absorb construction tolerance, and stair steps movable transversely (or sliding steps) such that the work space needed for concrete stairway wall could be easily provided. In this type of stairway system, other than providing robust connecting details, ensuring vibration performance is especially important since this system may be vibration-sensitive due to lightweight nature and/or probable low damping. To tackle these issues, a series of full-scale mock-up tests were conducted by using box-shape stringer members with or without concrete-fill. The connection system was shown to be sufficiently stiff and strong, or it remained elastic even under the 160% of service load level. Among the seven stringer alternatives, five exhibited satisfactory vibration performance according to the related North American and European acceptance criteria.

Fabrication and Constructability of a General-Purpose Manufactured Precast Concrete Double Wall (범용 생산설비를 활용한 PC 더블월 제작 및 시공성에 관한 연구)

  • Park, Soon-Jeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.465-476
    • /
    • 2023
  • This study introduces the development of a precast concrete double-wall, applicable to basement construction in apartment buildings. Unlike traditional precast concrete double walls, the developed double-wall doesn't require specialized manufacturing equipment such as a lathe. The constructability of these advanced technologies was validated through a full-scale mock-up test using the precast concrete double wall. The test specimens were constructed to represent a structural wall with a thickness of 250mm. It was observed that the quality of the in-situ concrete, filled between two single panels of 110mm thickness each, was excellent. The construction efficiency of the developed double-wall system for basement construction in an apartment building was also examined. Expert interviews about installation times of precast concrete elements were conducted to evaluate the speed of the basement floor's installation. The results showed that installation of precast concrete elements, including the proposed double walls, could be completed within 20 to 29 days for a basement in an apartment building. This indicates a three-fold increase in construction efficiency compared to traditional methods relying on in-situ casting.

Research for the Configuration of the Outside Sprinkler System (외벽방호 스프링클러시스템 구성에 관한 연구)

  • Min, Se-Hong;Yun, Jung-Eun;Sun, Ju-Seok;Jeong, Sang-Ho;Chea, Chang-Hun;Kim, Suck-Jun
    • Fire Science and Engineering
    • /
    • v.26 no.1
    • /
    • pp.102-112
    • /
    • 2012
  • In this research, configulation of outside sprinkler system the prevention and postponement of vertical diffusion of blaze was studied prior to this study, vertical diffusion protecting sprinkler head has been developed and the sprinkler system was applied with discharge pressure of 0.05 MPa and flow of 60 l/min witch is stated in NFPA13's Exposure Protection Sprinkler Systems. Through the system design, we applied the system to the sample building and we made pertinent system to work manually and automatically linked to a fire alarm system. Also, we conducted a real-size mock up test verify the cooling effect of the outer wall and the postponement effect of the flame.

Daylighting Performance of a New-Developed Energy Efficient Double-Skin Window System (에너지절약형 이중외피 창호의 기본채광 성능)

  • Park, Jong-Myung;Kim, Jae-Hoon;Choi, Jin-Woo;Lim, Hong-Soo;Kim, Gon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.04a
    • /
    • pp.117-122
    • /
    • 2008
  • The apartment will be much more convenient than the other one in the application of green technologies, providing the merits by mass production. For example, pre-manufactured building materials can be effectively adapted to the formation of buildings. Recently, the form of double-enveloped window system has been developed for the purposed of minimizing energy loss occurred around windows. On the other hand, the expansion of balcony area was legalized and thus, a visual buffer area does not exist any more. All-glass window wall on apartment houses without a balcony produces pretty harmful area with direct sunbeam. A various types of glass can be applied to the window system and it plays a critical role in the determination of inner visual environment. For the purpose of verifying the potential of its daylighting, a mock-up model has been constructed and tested. The refurbished version of conventional window shows its illuminated characteristics. Clear and Low-e glass have been adapted for window area and daylighting ratio has been compared in both test cells.

  • PDF

Development of gear type grease lubricator by rapid prototyping (쾌속조형기에 의한 기어식 주유장치의 개발)

  • Wang, Duck Hyun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.13 no.6
    • /
    • pp.46-53
    • /
    • 2014
  • An automatic grease lubricator provides an adequate amount of fresh grease constantly to any type of rotating machine to minimize friction heat and reduce friction loss. This study seeks to develop an automatic grease lubricator by means of rapid prototyping with a gear-driven mechanism and a controlled operation time. The ultimate design is to lubricate an adequate amount of grease by a simple dip-switch clicking mechanism according to an advanced set cycle. The backlash of the gear was minimized to increase the power, and to increase the power of the mechanism, the binding frequency and the thickness of the coil were changed. To control the rotation cycles of the main shaft according to certain set numbers, different resistances and chips were used in the design of the circuit which controls the electrical signals via a pulse. A digital mock-up was analyzed and the rapid prototyping (RP) trial products were tested with a PCB circuit and grease. An evaluation of the outlet capacity of RP trial products was conducted, as the friction caused by the outlet on the wall surface was an important factor in the operation of the equipment. Finally, a finishing process was applied to decrease the roughness of a surface to a comparable level to test the performance of the product.

Development of Self-Driven Pneumatic Robot for Boresonic Examination of Turbine Rotor (터빈로터 중심공 검사용 자기주행 공압형 로봇 개발)

  • Kang, Baejun;An, Myungjae;Lee, Chul-Hee
    • Journal of Drive and Control
    • /
    • v.18 no.1
    • /
    • pp.31-38
    • /
    • 2021
  • This study presents a new principle for driving the robot aimed at reducing the position error for the boresonic examination of turbine rotor. The conventional method of inspection is performed by installing manipulator onto the flange of the turbine rotor and connecting a pipe, which is then being pushed into the bore. The longer the pipe gets, the greater sagging and distortion appear, making it difficult for the ultrasonic sensor to contact with the internal surface of the bore. A pneumatic pressure will ensure the front or rear feet of the robot in close contact with the inner wall to prevent slipping, while the ball screw on the body of the robot will rotate to drive it in the axial direction. The compression force required for tight contact was calculated in the form of a three-point support, and a static structural simulation analysis was performed by designing and modeling the robot mechanism. The driving performance and ultrasonic detection ability have been tested by fabricating the robot, the test piece for ultrasonic calibration and the transparent mock-up for robot demonstration. The tests have confirmed that no slipping occurs at a certain pneumatic pressure or over.