• Title/Summary/Keyword: using period

Search Result 18,273, Processing Time 0.041 seconds

Estimation of Site Response Characteristics at Town Fortress Areas Damaged by Historical Earthquakes (역사 지진 피해 발생 읍성 지역의 부지 응답 특성 평가)

  • Sun, Chang-Guk;Bang, Eun-Seok;Chung, Choong-Ki;Kim, Dong-Soo
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2006.03a
    • /
    • pp.125-132
    • /
    • 2006
  • To estimate the local site effects at two town fortress areas where stone parapets were collapsed during historical earthquakes, site characteristics were evaluated using borehole drillings and seismic tests and equivalent-linear site response analyses were conducted based on the shear wave velocity (Vs) profiles determined from site investigations. The study sites are categorized as site classes C and B according to the mean Vs to 30 m ranging from 500 to 850 m/s, and their site periods are distributed in short period range of 0.06 to 0.16 sec. For site class C in the study areas, the short-period (0.1-0.5 sec) and mid-period (0.4-2.0 sec) site coefficients, $F_{\alpha}$ and $F_\nu$ specified in the Korean seismic design guide, underestimate the ground motion in short-period band and overestimate the ground motion in mid-period band, respectively, due to the characteristics showing high amplification in short period range, which can result in the collapse of stone parapets having the short natural period.

  • PDF

Optimum MPPT Control Period for Actual Insolation Condition (실제 일사량 조건에서의 최적 MPPT 제어주기)

  • Ryu, Danbi;Kim, Yong-Jung;Kim, Hyosung
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.24 no.2
    • /
    • pp.99-104
    • /
    • 2019
  • Solar power generation systems require maximum power point tracking (MPPT) control to acquire maximum power using inefficient and high-cost PV modules. Most conventional MPPT algorithms are based on the slope-tracking concept. The perturb and observe (P&O) algorithm is a typical slope-tracking method. The two factors that determine the MPPT performance of P&O algorithm are the MPPT control period and the magnitude of the perturbation voltage. The MPPT controller quickly moves to the new maximum power point at insolation change when the perturbation voltage is set to large, and the error of output power will be huge in the steady state even when insolation is not changing. The dynamics of the MPPT controller can be accelerated even though the perturbation voltage is set to small when the MPPT control period is set to short. However, too short MPPT control period does not improve MPPT performance but consumes the MPPT controller resources. Therefore, analyzing the performance of the MPPT controller is necessary for actual insolation conditions in real weather environment to determine the optimum MPPT control period and the magnitude of the perturbation voltage. This study proposes an optimum MPPT control period that maximizes MPPT efficiency by measuring and analyzing actual insolation profiles in typical clear and cloudy weather in central Korea.

Analysis of Effects on SWAT Estimation of Warm-Up Period

  • Lee, Ji-Won;Moon, Jong-Pil;Woo, Won-Hee;Kum, Dong-Hyuk;Kim, Ki-Sung;Lim, Kyoung-Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.260-260
    • /
    • 2011
  • SWAT is semi-distributed and continuous-time distributed simulation watershed model, which can simulate point and nonpoint source pollutants as well as hydrology and water quality. It was developed to predict the effects of alternative management decisions on water, sediment, and chemical yields with reasonable accuracy. It is able to predict and manage hydrology, sediments, nutrients, and pesticides with Best Management Practices (BMPs) in a watershed. SWAT model also has potential for use in ungauged basins to predict streamflow and baseflow from saturated source area in watersheds. According to various cultivation practices and climate change, SWAT model is available to analyze relative change in hydrology and water quality. In order to establish optimum management of water quality, both monitering and modeling have been conducted actively using SWAT model. As SWAT model is computer program to simulate a lot of natural phenomena, it has limitation to predict and reflect them with on hundred percent accuracy. Thus, it is possible to analyze the effect of BMPs in the watershed where users want to simulate hydrology and water quality only if model accuracy and applicability are assessed first of all and the result of it is well for the study watershed. For assessment of SWAT applicability, most researchers have used $R^2$ and Nash and Sutcliffe Efficiency (NSE). $R^2$ and NSE are likely to show different results according to a warm up period and sometimes its results are very different. There have been hardly any studies of whether warm up period can affect simulation results in SWAT model. In this study, how warm up period has a effect on SWAT results was analyzed and a appropriate warm up period was suggested. Lots of SWAT results were compared after using measured data of Soyanggang-dam watershed and applying various warm up period (0 ~ 10 year(s)). As a result of this study, when there was no warm up period, $R^2$ and NSE were 0.645, 0.602 respectively, when warm up period was 2 years, $R^2$ and NSE were 0.648, 0.632, and when warm up period was 4 years, $R^2$ and NSE were 0.663, 0.652 separately. Through this study, sensitive analysis of warm up period in SWAT model was conducted, and this study could give a guideline able to simulate hydrology and water quality for more accuracy than before as users change a lot of warm up periods as well as any simulation parameters.

  • PDF

Psychopharmacotherapy for Psychiatric Patients during Pregnancy and Lactation Period (임신과 수유중인 정신과 환자의 약물치료)

  • Kim, S. Peter
    • Korean Journal of Biological Psychiatry
    • /
    • v.3 no.2
    • /
    • pp.156-161
    • /
    • 1996
  • Many pregnant women have to receive psychotropic medication during pregnancy and lactation period, despite the proven and assumed risks to the fetus ar neonate. A brief summary of drug metabolism and pharmacodynamics is given. Principles and quidelines of using psychotropic agents during pregancy and lactation period are presented for psychotic disorders, bipolar affective disorders. depression and anxiety disorders, with due consideration for relative benefits and risks of choosing among psychotropic drugs and alternative treatments.

  • PDF

Musaic Disease of Black Locust (Robina pseudo-acacia L.) (Part 3) Insect Vectors (아까시아나무 모자익병에 관한 연구 (제 3 ))

  • 김종진
    • Korean Journal of Microbiology
    • /
    • v.4 no.2
    • /
    • pp.19-21
    • /
    • 1966
  • For the purpose of determining possibility of aphid-transmission of mosaic disease of black locust, cowpea aphid (Aphis medicagnis Koch) and green peach aphid (Myzus persicae Sulzer) were experimented using cowpea as test plant, and both proved to be the vectors. As for transmission threshold period of cowpea aphid to the virus, the acquisition feeding period was five seconds and inoculation feeding period was two minutes. This black locust mosaic virus, therefore, is a nonpersistent virus.

  • PDF

Existence Proffs of a Nash Equilibrium to a General Class of Differential Games (미분게임 일반모형에 대한 Nash 균형해의 존재증명)

  • Kim, Yang-Yul
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.14 no.2
    • /
    • pp.97-104
    • /
    • 1989
  • This paper extends the existence proofs of a Nash equilibrium to a more general class of differentila game models with constraints on the control spaces. With the assumptions of continuity, convexity, and compactness, the existence is proved using Kakutani Theorem and via a path-following approach. Furthermore, the proof for a period-by-period optimization of multi-period problems provides an insight to a numerical solution algorithm to differential game models with constraints.

  • PDF

Development of Integrated Inventory Management Model and Determination Inventory Replenishment Period in SCM (SCM 환경 하에서 재고보충주기 결정 및 통합 재고관리 모델 개발)

  • Kim, Myeong-Hun;An, Dong-Gyu
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.349-357
    • /
    • 2007
  • We consider supply chain which consist of one manufacturer, one distributor and N retailers for a single product. This paper determines inventory replenishment period of supply chain using houristic method and propose order policy through re-coordination of inventory replenishment. Also, We develops inventory management model to calculate total cost of supply chain under assumptions of constant demand. The computational results show that the proposed inventory replenishment period and inventory management model is efficient.

  • PDF

Reliability Prediction using Field Data after Warranty Period (보증기간후의 사용현장 자료를 이용한 신뢰성 예측)

  • 김종걸;최영진;정연승
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.11a
    • /
    • pp.39-52
    • /
    • 2000
  • This paper is concerned with the method of estimating lifetime distribution for field data in warranty period and for a situation where some additional field data can be gathered after the warranty period. Implementing the proposed methods in this paper will result in obtaining the more precise product life time estimation and product improvement.

  • PDF

Study on the maintenance period allocation method for railway signal equipment (철도신호설비 유지보수주기 할당에 관한 연구)

  • Lee, Kang-Mi;Shin, Duck-O;Lee, Jae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.647-652
    • /
    • 2008
  • Railway signal system has been more complex, larger and required high reliability. So, maintenance by experience must be changed to optimize maintenance program or introduced systematic method for estabilish new maintenance program. In this paper, we introduced the maintenance period decision method which are Age based method and Block replacement method based on the failure distribution for the equipment. So, we allocated optimum maintenacne period for the railway signal equipment using block replacement method.

  • PDF

Development of Integrated Inventory Management Model and Determination Inventory Replenishment Period in SCM (SCM 환경 하에서 재고보충주기 결정 및 통합 재고관리 모델 개발)

  • Kim, Myoung-Hun;An, Dong-Kyu
    • Journal of Digital Convergence
    • /
    • v.5 no.1
    • /
    • pp.47-53
    • /
    • 2007
  • We consider supply chain which consist of one manufacturer, one distributor and N retailers for a single product. This paper determines inventory replenishment period of supply chain using heuristic method and propose order policy through re-coordination of inventory replenishment. Also, We develops inventory management model to calculate total cost of supply chain under assumptions of constant demand. The computational results show that the proposed inventory replenishment period and inventory management model is efficient.

  • PDF