• 제목/요약/키워드: unit time

검색결과 5,636건 처리시간 0.032초

A Research on a Revised Application of Unit Hydrograph Variant According to Rainfall Intensity in a Rainstorm (호우사상의 강우강도에 변동하는 단위유량도의 보완적 적용에 관한 고찰)

  • Yoo, Ju-Hwan
    • Journal of Korea Water Resources Association
    • /
    • 제44권1호
    • /
    • pp.41-49
    • /
    • 2011
  • This study is a research based on an existing analysis that peak values of unit hydrograph are variant according to rainfall intensity in a watershed. Differently from the fundamental assumption that an unit hydrograph is time-invariant in a watershed a variant unit hydrograph to rainfall intensity by storms is defined and applied into rainfall events, which produces out runoff hydrograph for an examination. Peak flow and time to peak of unit hydrograph used for an application are obtained from the relation equation with rainfall intensity developed by a previous study reviewed, and its shape is made by Nash unit hydrograph which is determined by the peak values. For the purpose of a comparison an invariant unit hydrograph is defined as Nash model obtained from averaged peak values of unit hydrograph which is derived by 26 rainfall storms. Peak flow and time to peak of flood hydrograph developed respectively by variant unit hydrograph with rainfall intensity and an averaged unit hydrograph are compared to those of the observed hydrograph. With comparing both hydrographs calculated by averaged unit hydrograph and revised unit hydrograph to observed hydrograph it is shown the peak flow and time to peak of hydrograph calculated by time-invariant unit hydrograph revised in this study are closer to those of observed hydrograph than those calculated by averaged unit hydrograph.

Efficient Scheduling Algorithm for Sequential Multipurpose Batch Processes (순차적 다목적 회분식 공정을 위한 효과적인 일정계획)

  • 강진수;복진광;문성득;박선원;이태용
    • Journal of Institute of Control, Robotics and Systems
    • /
    • 제6권5호
    • /
    • pp.426-432
    • /
    • 2000
  • A novel mixed-integer linear programming model for the short-term scheduling of a sequential multipurpose batch plant is addressed. First, a time slot domain to each unit is introduced. By assigning each time slot to a product, we obtain the production sequence that minimizes makespan. For multiple-unit assignment problem where a few parallel units with the same function exist, production paths are defined for the distinction of the same stage with a different unit. As a second issue, the model adapted for sequence dependent changeover is presented. For a time slot of a unit, if a product is assigned to the time slot and a different product is assigned to the adjacent time slot, the changeover time considering this situation is included. The performance of the proposed models are illustrated through two examples.

  • PDF

A Repair-Time Limit Replacement Model with Imperfect Repair (불완전 수리에서의 수리시간한계를 가진 교체모형)

  • Chung, Il Han;Yun, Won Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • 제39권4호
    • /
    • pp.233-238
    • /
    • 2013
  • This article concerns a profit model in a repair limit replacement problem with imperfect repair. If a system fails, we should decide whether we repair the failed system (repair option) or replace it by new one (replacement option with a lead time). We assume that repair times are random variables and can be estimated before repair with estimation error. If the estimated repair time is less than the specified limit (repair time limit), the failed unit is repaired but the unit after repair is different from the new one (imperfect repair). Otherwise, we order a new unit to replace the failed unit. The long run average profit (expected profit rate) is used as an optimization criterion and the optimal repair time limit maximizes the expected profit rate. Some special cases are derived.

Study on multi-unit level 3 PSA to understand a characteristics of risk in a multi-unit context

  • Oh, Kyemin;Kim, Sung-yeop;Jeon, Hojun;Park, Jeong Seon
    • Nuclear Engineering and Technology
    • /
    • 제52권5호
    • /
    • pp.975-983
    • /
    • 2020
  • Since the Fukushima Daiichi accident in 2011, concerns for the safety of multi-unit Nuclear Power Plant (NPP) sites have risen. This is because more than 70% of NPP sites are multi-unit sites that have two or more NPP units and a multi-unit accident occurred for the first time. After this accident, Probability Safety Assessment (PSA) has been considered in many countries as one of the tools to quantitatively assess the safety for multi-unit NPP sites. One of the biggest concerns for a multi-unit accident such as Fukushima is that the consequences (health and economic) will be significantly higher than in the case of a single-unit accident. However, many studies on multi-unit PSA have focused on Level 1 & 2 PSA, and there are many challenges in terms of public acceptance due to various speculations without an engineering background. In this study, two kinds of multi-unit Level 3 PSA for multi-unit site have been carried out. The first case was the estimation of multi-unit risk with conservative assumptions to investigate the margin between multi-unit risk and QHO, and the other was to identify the effect of time delays in releases between NPP units on the same site. Through these two kinds of assessments, we aimed at investigating the level of multi-unit risk and understanding the characteristics of risk in a multiunit context.

An Analysis of Call Demands of Two Squads In Kyonggi Provincial fire and Disaster Headquarters (경기도 소방재난본부에 소속된 두 구급대의 출동수요 분석)

  • Uhm, Tai-Hwan
    • The Korean Journal of Emergency Medical Services
    • /
    • 제6권1호
    • /
    • pp.77-86
    • /
    • 2002
  • The purposes of this research which was conducted by surveying lost/added unit hours reports, unit hour demand analysis worksheets from prehospital care reports of two squads in Kyonggi Provincial Fire and Disaster Headquarters for 20 weeks (January 1, 2002 - May 20, 2002) are to get Unit Hour Utilizations. Call Demands such as Unit Hour Demand, Simple Average Demand, High Average Demand, Peak Average Demand, the High Actual Demand. The conclusions from this analysis were summarized as follows: (1) By revealing Unit Hour Produced 3223.9, Call Volume 964, Unit Hour Utilization 0.299 at the Squad A and Unit Hour Produced 3328.4, Call Volume 901, Unit Hour Utilization 0.271 at the Squad B induced Korean Squads to chance identification, definition, direction of Unit Hour Utilization. (2) By revealing Simple Average Demand 7.4 on Monday Tuesday, High Average Demand 9.6 on Tuesday Friday. Peak Average Demand 11.5 on Tuesday, the High Actual Demand 12 on Tuesday Wednesday at the Squad A and Simple Average Demand 6.8 on Sunday, High Average Demand 10.4 on Monday, Peak Average Demand 11.5 on Monday, the High Actual Demand 13 on Monday at the Squad B enabled Korean Squads to utilize System Status Management. (3) The Maximum Calls per Unit Hour were 115 for 23:00~23:59, the Minimum Calls per Unit Hour were 46 for 05:00~05:49 in two squads. The Maximum Calls per Unit Hour were 7.4 on Tuesday Saturday, the Minimum Calls per Unit Hour were 6.1 on Thursday at the Squad A. The Maximum Calls per Unit Hour were 7.3 on Monday Saturday, the Minimum Calls per Unit Hour were 5.6 on Thursday at the Squad B. (4) Analyzing demand for EMTs in the optimum emergency medical service of Korea, we have been able to utilize this Unit Hour Utilization in company with the established estimation methods such as international comparisons or the number of ambulances for scientific reasonable estimation. (5) These Call Demands which were limited to the demand time in this study will make us expect some following studies including demand time, demand time, demand map for Strategic Deployment.

  • PDF

An optimal continuous type investment policy for the surplus in a risk model

  • Choi, Seung Kyoung;Lee, Eui Yong
    • Communications for Statistical Applications and Methods
    • /
    • 제25권1호
    • /
    • pp.91-97
    • /
    • 2018
  • In this paper, we show that there exists an optimal investment policy for the surplus in a risk model, in which the surplus is continuously invested to other business at a constant rate a > 0, whenever the level of the surplus exceeds a given threshold V > 0. We assign, to the risk model, two costs, the penalty per unit time while the level of the surplus being under V > 0 and the opportunity cost per unit time by keeping a unit amount of the surplus. After calculating the long-run average cost per unit time, we show that there exists an optimal investment rate $a^*$>0 which minimizes the long-run average cost per unit time, when the claim amount follows an exponential distribution.

Rescheduling algorithms considering unit failure on the batch process management (회분공정의 장치 고장을 고려한 동적생산계획 기법)

  • Ko, Dae-Ho;Moon, Il
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.1028-1031
    • /
    • 1996
  • Dynamic scheduling is very important in constructing CIM and improving productivity of chemical processing systems. Computation at the scheduling level requires mostly a long time to generate an optimal schedule, so it is difficult to immediately respond to actual process events in real-time. To solve these problems, we developed dynamic scheduling algorithms such as DSMM(Dynamic Shift Modification Method), PUOM(Parallel Unit Operation Method) and UVVM(Unit Validity Verification Method). Their main functions are to minimize the effects of unexpected disturbances such as process time variations and unit failure, to predict a makespan of the updated dynamic schedule and to modify schedule desirably in real-time responding to process time variations. As a result, the algorithms generate a new pertinent schedule in real-time which is close to the original schedule but provides an efficient way of responding to the variation of process environment. Examples in a shampoo production batch process illustrate the efficiency of the algorithms.

  • PDF

An Experimental Study on the Evaluation of Concrete Unit-Water Content Using High Frequency Moisture Sensor (FDR) (고주파수분센서(FDR)를 활용한 콘크리트 단위수량 평가에 관한 실험적 연구)

  • Lee, Seung-Yeop;Yang, Hyun-Min;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.59-60
    • /
    • 2021
  • The unit-water content has a major problem in concrete structures which leads to micro cracks on the concrete during drying time. Thus, the compressive strength and durability of the concrete structures are significantly reduced. Several techniques have been developed to measure the unit-water content in concrete structures such as heating drying, unit volume mass, and capacitance measurements. However, these techniques have problems in during measurement such as longer time, expensive and difficult in analysis of data. Frequency Domain Reflectivity (FDR) is one of the sensors which used to measure the water content. This method has several advantages including easy to measure, inexpensive, and capable of measuring moisture in real time. In this study, an attempt has been made to evaluate the unit-water content in concrete using the FDR sensor and interpret the data with deep learning method.

  • PDF

Review on Application Tolerance of Unit Hydrograph for Calculating Flood Runoff Hydrograph (홍수 유출 수문곡선 산출에 단위유량도 적용 오차의 정도 검토)

  • Yoo, Ju-Hwan;Yoon, Yeo-Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 한국수자원학회 2010년도 학술발표회
    • /
    • pp.346-349
    • /
    • 2010
  • In this study several unit hydrographs by rainfall storms are derived and moving averaged unit hydrograph is extracted from them based on the rainfall-runoff data in a small basin 8.5 $km^2$ wide. And peak discharges and peak times of the unit hydrographs are investigated and reviewed. And then a representative unit hydrograph of the moving averaged one is applied to the linear convolution integration for obtaining the flood discharge hydrograph and peak discharge and time of its result are researched and inspected. Variance in application of the representative unit hydrograph in a basin on assumption of linearity is appeared and this is given as a counterevidence about that the runoff response from rainfall on a basin has nonlinear characteristics. And As a result of application of derived representative unit hydrograph the errors in peak discharge and time are investigated.

  • PDF

Analysis of Cost and Efficiency of a Medical Nursing Unit Using Time-Driven Activity-Based Costing (시간-동인활동기준원가계산(Time-Driven Activity-Based Costing)을 이용한 일 내과병동 간호단위 원가계산 및 효율성 분석)

  • Lim, Ji-Young;Kim, Mi-Ja;Park, Chang-Gi
    • Journal of Korean Academy of Nursing
    • /
    • 제41권4호
    • /
    • pp.500-509
    • /
    • 2011
  • Purpose: Time-driven activity-based costing was applied to analyze the nursing activity cost and efficiency of a medical unit. Methods: Data were collected at a medical unit of a general hospital. Nursing activities were measured using a nursing activities inventory and classified as 6 domains using Easley-Storfjell Instrument. Descriptive statistics were used to identify general characteristics of the unit, nursing activities and activity time, and stochastic frontier model was adopted to estimate true activity time. Results: The average efficiency of the medical unit using theoretical resource capacity was 77%, however the efficiency using practical resource capacity was 96%. According to these results, the portion of non-added value time was estimated 23% and 4% each. The sums of total nursing activity costs were estimated 109,860,977 won in traditional activity-based costing and 84,427,126 won in time-driven activity-based costing. The difference in the two cost calculating methods was 25,433,851 won. Conclusion: These results indicate that the time-driven activity-based costing provides useful and more realistic information about the efficiency of unit operation compared to traditional activity-based costing. So time-driven activity-based costing is recommended as a performance evaluation framework for nursing departments based on cost management.