• Title/Summary/Keyword: ungaged station

Search Result 18, Processing Time 0.036 seconds

River Flow Forecasting Model for the Youngsan Estuary Reservoir Operation( II) - Simulating Runoff Hydrograptis at Ungaged Stations - (영산호 운영을 위한 홍수예보모형의 개발(II) -나주하류유성에서의 총수유출 추정-)

  • 박창언;박승우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.1
    • /
    • pp.65-72
    • /
    • 1995
  • This paper describes the applications of the SCS TR-20 hydrologic model for simula- tion of hourly inflow rates from sixty-six ungaged tributaries and subareas between the Naju station and the estuarin dam at the Yongsan River Basin. The model was tested for the ungaged conditions with fifteen storm events at Naju station. Hourly simulated run- off data were compared with the observed, and the results showed less correlationships between the two data than those from TANK model. The coefficients of correlation ranged from 0.74 to 0.87. The curve numbers and time of concentration were defined from topographic dta for each of sixty-six tributaries for the estuarine dam and used for TR-20 applications. The results were within an acceptable range of errors in simulating the inflow fluctuations for the flood forecasting at the estuarine dam.

  • PDF

Runoff Simulation and Forecasting at Ungaged Station (미계측 지점에서의 유출 모의 및 예측)

  • Ahn, Sang-Jin;Choi, Byong-Man;Yeon, In-Sung;Kwark, Hyun-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.6 s.155
    • /
    • pp.485-494
    • /
    • 2005
  • It is very important to analyze the correlation between discharge and water quality. The observation of discharge and water quality are effective at same point as well as same time for real time management. But no less significant is the fact that there are some of real time water quality monitoring stations far from the T/M water stage. Pyeongchanggang station is one of them. In this case, it need to observe accurate discharge data, and to develop forecasting program or system using real time data. In this paper, discharge on Pyeongchanggang station was calculated by developed runoff neural network model, and compared with discharge using WMS(Watershed Modeling System) model. WMS shows better results when peak discharge is small and hydrograph is smooth. Forecasted discharge of neural network model have achieved the highest overall accuracy of specific discharge and WMS. Neural network model forecast change of discharge well on unrecored station.

A Study on the Alternative to Estimate the Design Low-Flow based on the Runoff Hydrology and the Dry Spell Stochastics (수문-추계 결합법에 의한 설계갈수량 추정법 연구)

  • Lee, Jae-Hyoung;Yoon, Jae-Min
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.4 s.129
    • /
    • pp.375-384
    • /
    • 2002
  • This study is to suggest a method to estimate the design low-flow based on the runoff hydrology. The recession time model to transform a return period into the recession time is derived under the similarity between dry spell and low-flow runoffs event. The proposed recession model can be applied to the gaging station and the ungaged outlet. This recession time model contains the parameters: for climate conditions, watershed characteristics, and runoff characteristics etc. And the recession model is composed of the parameters which are initial discharge and recession constant. This model is applied to the Yongdam gaging station and the other temporary gaging station. Consequently, it is proved that this model can be used for an alternative practice to estimate the design low-flow at the gaging station with short-term runoff data or the ungaged outlet.

A Research on Application of Flood Simulation at Ungaged Basin for Water Management in the Ara River (아라천 물관리를 위한 미계측 유역 홍수 모의 적용성 고찰)

  • Lee, Sang Jin;Noh, Joon Woo;Kim, Joo Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3B
    • /
    • pp.169-174
    • /
    • 2012
  • For efficient water management in the Ara River during the flood season, applicability of flood simulation model in the ungaged Gulpo watershed has been tested. In the Gulpo River watershed, fundamental hydrologic data such as water level and flowrates are very limited and selection of the reliable hydrologic parameters are very important for model application. This study tested reliability of parameters estimated using the empirical equation based on the HEC-HMS runoff simulation. Also coupled with HEC-RAS hydraulic routing model, simulated flowrates from HEC-HMS has been compared with the observed water levels collected at the upstream and downstream of the Gyulhyun Weir station during the flood event in 2010. Based on this information, stage-discharge curve has been developed and its reliability has been tested for flood event in 2011.

SIMULATION OF REGIONAL DAILY FLOW AT UNGAGED SITES USING INTEGRATED GIS-SPATIAL INTERPOLATION (GIS-SI) TECHNIQUE

  • Lee, Ju-Young;Krishinamursh, Ganeshi
    • Water Engineering Research
    • /
    • v.6 no.2
    • /
    • pp.39-48
    • /
    • 2005
  • The Brazos River is one of the longest rivers contained entirely in the state of Texas, flowing over 700 miles from northwest Texas to the Gulf of Mexico. Today, the Brazos River Authority and Texas Commission on Environmental Quality interest in drought protection plan, waterpower project, and allowing the appropriation of water system-wide and water right within the Brazos River Basin to meet water needs of customers like farmers and local civilians in the future. Especially, this purpose of this paper primarily intended to provide the data for the engineering guidelines and make easily geological mapping tool. In the Brazos River basin, many stream-flow gage station sites are not working, and they can not provide stream-flow data sets enough for development of the Probable Maximum Flood (PMF) for use in the evaluation of proposed and existing dams and other impounding structures. Integrated GIS-Spatial Interpolation (GIS-SI) tool are composed of two parts; (1) extended GIS technique (new making interface for hydrological regionalization parameters plus classical GIS mapping skills), (2) Spatial Interpolation technique using weighting factors from kriging method. They are obtained from the relationship among location and elevation of geological watershed and existing stream-flow datasets. GIS-SI technique is easily used to compute parameters which get drainage areas, mean daily/monthly/annual precipitation, and weighted values. Also, they are independent variables of multiple linear regressions for simulation at un gaged stream-flow sites. In this study, GIS-SI technique is applied to the Brazos river basin in Texas. By assuming the ungaged flow at the sites of Palo Pinto, Bryan and Needville, the simulated daily/monthly/annual time series are compared with observed time series. The simulated daily/monthly/annual time series are highly correlated with and well fitted to the observed times series.

  • PDF

Estimation of Design Flood Runoff in Ungaged Forest Watershed to Reduce Flood Damage within the National Park (국립공원내 홍수피해 저감을 위한 미계측 산림지역의 설계홍수량 추정)

  • Kim, Sang-Min;Im, Sang-Jun;Lee, Sang-Ho;Kim, Hyung-Ho;Ma, Ho-Seop;Jeong, Won-Ok
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.5
    • /
    • pp.107-113
    • /
    • 2009
  • The purpose of this study is to estimate the design flood runoff for ungaged forest watershed to reduce the flood damage in national park. Daewonsa watershed in Jirisan National Park was selected as study watershed, of which characteristic factors were obtained from GIS data. Flood runoff was simulated using SCS unit hydrograph module in HEC-HMS model. SCS Curve Number (CN) was calculated from forest type area weighted average method. Huff's time distribution of second-quartile storm of the Sancheong weather station, which is nearest from study watershed, was used for design flood runoff estimation. Critical storm duration for the study watershed was 3 hrs. Based on the critical duration, the peak runoff for each sub-watershed were simulated. It is recommended to monitor the long-term flow data for major stream stations in National Park for a better reliable peak runoff simulation results.

Runoff Estimation for Small Watershed by Interactive Program (Interactive program에 의한 소유역의 유출량 산정)

  • 안상진;김종섭
    • Water for future
    • /
    • v.25 no.4
    • /
    • pp.97-107
    • /
    • 1992
  • The purpose of this study is to estimate the flood hydrograph and runoff at ungaged small watershed by using interactive program with geomorphologic and climatic data obtained from the topographic maps following the law of stream classification and ordering by Horton and Strahler. The present model is modified from Allam's interactive program which derives the geomorphologic instantaneous unit hydrograph(GIUH). This program uses the results of Laplace transformation and convolution integral of probability density function in travel time at each station, This program is used to estimate the time to peak, the flood discharge and the direct runoff at San seong station in Bocheong Stream.

  • PDF

A Study on Rainfall-Runoff Analysis by Geomorphological Instantaneous Unit Hydrograph (GIUH) (지형학적 순간단위도(GIUH)에 의한 강우-유출해석)

  • Choi, Hung-Sik;Park, Chung-Soo;Moon, Hyung-Geun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.1 s.20
    • /
    • pp.49-58
    • /
    • 2006
  • Rainfall-runoff characteristics are analysed based on the geomorphological instantaneous unit hydrograph(GIUH) derived by geomorphological parameters using geographical information system in watershed ungaged or deficient of field data. Observed data of Seom river experiment watershed at upstream of Hoengseong dam and variable slope method for hydrograph separating of direct non are used. The 4th stream order of Seom river experimental watershed is developed with a regular correlation referred to the Horton-Strahler's law of stream order. The characteristic velocity to determine shape parameter of GIUH is 1.0m/s and its equation is modified for accurate results. Hydrograph at the outlet of 4th stream order of Maeil gage station and at the outlets of 3rd stream order of Sogun and Nonggeori gage stations show a little differences in falling limb of hydrograph but agree well to the observed data in general. The results by hydrological routing with HEC-HMS to the outlet of 4th stream order of Maeil gage station which the hydrograph by GIUH obtained at Sogun and Nonggeori gage stations of 3rd stream oder are applied as upstream inputs give better agreement with observed data than those by hydrograph by GIUH obtained at Maeil gage station of 4th stream order. In general, the rainfall-runoff by GIUH has applicability to the watershed routing of ungaged project regions.

Development of the Hydraulic Performance Graph Model and its Application (수리거동곡선 모형의 개발 및 적용)

  • Seo, Yongwon;Seo, Il Won;Shin, Jaehyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.5
    • /
    • pp.1373-1382
    • /
    • 2014
  • This paper presents a hydraulic performance graph model in which the flow carrying capacity of a channel system was determined by accounting the interacting backwater effect among channel reaches and incoming lateral flow. The method utilizes hydraulic performance graphs (HPGs), and the method is applied to a natural channel Nakdong River to examine its applicability. This research shows that estimation results using HPG are close to records from the stage station and the results from a widely-accepted model, HEC-RAS. Assuming that a water level gage site is ungaged, water level estimations by HPGs compared with observation show that with a flood event, the HPGs underestimate in the water level ascension phase, but in the recession phase they overestimate results. The accuracy of estimation with HPGs was greatly improved by considering the time difference of flooding between the observation and estimation locations.

A Determination of Magnitude and Frequency of River Floods (하천 홍수량의 크기 및 빈도 결정)

  • Noh, Jae Sik;Lee, Kil Choon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.2
    • /
    • pp.141-150
    • /
    • 1992
  • In this study, six gaging stations(T/M bureau) in the Han River basin were selected for flood frequency analysis and was carried out frequency analysis by POT(peaks Over a Threshold) model where existing flood data of short record length are available. Frequency and magnitudes of each station floods in the river basins were estimated by POT model based on statistical method, and also were compared with standard errors to verify applicability of the estimates by POT model. Furthermore, in order to evaluate for the adequate design flood which is needed for the design of the hydrologic structures in the ungaged watersheds, it is considered to be possible to develop the statistical regionalized model by regional frequency analysis.

  • PDF