• 제목/요약/키워드: underground transmission

검색결과 387건 처리시간 0.022초

장거리 345kV XLPE 케이블 지중송전선로의 준공 (The first installation of long-distance underground transmission line with 345kV XLPE Cable in Korea)

  • 신희덕;박근룡
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.376-378
    • /
    • 2003
  • Since the first underground transmission line of Korea was installed between Danginri and Yongsan substations in 1974, the two types of underground transmission power cables, oil-filled and XLPE, have been applied for underground transmission lines. As the manufacturing technologies of XLPE cable have been improved and the simplicity of installation and maintenance has been focused on, the installations of XLPE cables have been largely increased since the mid 1990's. For the first time, in Korea, the 345kV XLPE cable was installed between Youngseo and Youngdeungpo substations in 2003, June. So, this paper introduces the project profile, the design of cable and its accessory, the cable system design, installation and site test.

  • PDF

345kV XLPE 케이블 선로의 준공 (The first installation of underground transmission line with 345kV XLPE cable in Korea)

  • 신희덕;김화종;김현주;박근룡;송재혁
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 C
    • /
    • pp.1815-1817
    • /
    • 2003
  • Since the first underground transmission line in Korea was installed in 1974, the two types of underground transmission power cables, oil-filled and XLPE, have been applied for underground transmission lines. As the manufacturing technologies of XLPE cable have been improved and the simplicity of installation and maintenance has been focused on, the installations of XLPE cables have been largely increased since the mid 1990's. For the first time, in Korea, the 345kV XLPE cable was installed at Pyungtaek thermal power plant in 2003, February. So, this paper introduces the project profile, the design of cable and its accessory, the cable system design, installation and site test.

  • PDF

전기비저항을 이용한 지하매설물 탐사(II) - 현장실험 중심으로 (Exploration of underground utilities using method predicting an anomaly(II) - field application)

  • 류희환;조선아;김경열;조계춘
    • 한국터널지하공간학회 논문집
    • /
    • 제19권3호
    • /
    • pp.449-461
    • /
    • 2017
  • 관로, 전력구 등 지하매설물의 불투명한 존재여부 및 부정확한 정보로 인해 신규 지하매설물의 계획 노선, 설계, 시공에 많은 문제를 야기시키고 있다. 이에 Ryu(2015) 등은 전기장 해석을 통해 지하매설물의 크기, 위치, 방향 등을 예측할 수 있는 식을 제안하였다. 3개의 현장에 적용하여 싱크홀 존재 여부 및 크기와 지하매설물의 위치, 크기, 방향을 예측하였으며, 예측된 결과를 토대로 설계에 반영되고 후속 조치가 수행되었다.

웨이브렛 변환을 이용한 혼합송전계통에서의 Fault Location (Fault Location in Combined Transmission Systems Using Wavelet Transform)

  • 정채균;홍동석;이종범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.226-229
    • /
    • 2001
  • The combined transmission lines with the underground power cables are continuously expanded in power systems. So the fault of combined transmission line is increased every year as the complication of underground transmission line. In this paper. traveling wave theory and DWT wavelet transform are used for fast and accurate detection of fault location at the combined transmission line. Traveling wave travels to each bus like surge and repeats reflection and transmission till transient signal is completely disappeared. When fault is occurred on overhead and underground tine, the fault location detecting algorithm was performed with using continuous peak value time-delay of traveling wave reflected from A bus.

  • PDF

송전선로 철탑기초의 접지저항 해석 (Analysis of the Earth Resistance for the Tower Footing of T/L)

  • 이현구;하태현;배정효;김대경
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.344-346
    • /
    • 2001
  • The sharing of common corridors by electric power transmission lines and pipelines is becoming more common place. However, such corridor sharing can result in undesired coupling of electromagnetic energy from the power lines to the near facilities. During a fault on any of the transmission lines, energization of the earth by supporting structures near the fault can result in large voltages appearing locally between the earth and the steel wall of any nearby pipeline. This paper presents the outline of the tower footings for the transmission lines having been used in KEPCO and analyzes the earth resistance for operation method of the tower footing, that is contact presence for the anchor and reinforcing rob of the tower and foundation presence of the underground wiring.

  • PDF

국내 송전 케이블 시스 순환전류 실측 및 분석 (Measurement and Analysis of Sheath Circulating Current in Domestic Underground Transmission Cables)

  • 하체웅;김정년;이수길;김동욱;이종범;강지원
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권4호
    • /
    • pp.193-200
    • /
    • 2003
  • The use of underground transmission tables has continuously increased in densely inhabited urban and suburban area. Due to a increasing demand of underground cables, two or more circuits are installed in parallel for several kilometers. It, however, has not been realized that the sheath circulating current is generated in the system where a large number of cables are laid in the same route. In this paper, Author studied diversely the sheath circulating current on underground cables depending on the various length rate, the phase arrangement, and the grounding resistance of the sheath in the cross-bonded section. It was clear that very large circulating current is generated in cable systems due to unbalanced length rate and phase arrangement in the cross-bonded section.

EMTP/ATPDraw를 이용한 가스절연송전선로(GIL)의 과전압 분석 (An Analysis on the Overvoltage in Gas Insulated Transmission Lines with EMTP/ATPDraw)

  • 박흥석;한상옥
    • 전기학회논문지
    • /
    • 제60권5호
    • /
    • pp.999-1004
    • /
    • 2011
  • Nowadays, it is becoming difficult to secure a transmission line route when a new transmission line is constructed due to social environment and resident complaints. As existing urban areas are expanded and new cities are constructed, the necessity of high-capacity underground power transmission has been increasing because of load concentration in downtown areas. In North America, Europe and Japan, the research has been carried out for 2nd generation gas insulated transmission lines(GIL) which is more environmentally friendly and economical compared to previous GILs. The new GILs have been applied to real power systems from early 2000s. In South Korea, GIL is being considered as a possible solution for replacing 345kV high-capacity overhead transmission lines with underground transmission ones, so KEPCO is planning to develop and apply a new 362kV rated GIL underground transmission lines instead of overhead transmission lines. In this paper, the overvoltage generated at the combined transmission line adapting GIL was reviewed using EMTP.

지중관로에서의 실제 허용전류 산출을 위한 도체온도 계산 알고리즘 개선에 관한 연구 (Improvement of the Conductor Temperature Calculation Algorithm for Calculating the Allowable Current in the Underground Channel)

  • 이향범;이병철;김정훈;남용현;강지원
    • 전기학회논문지
    • /
    • 제67권3호
    • /
    • pp.352-357
    • /
    • 2018
  • In this paper, the improvement of the conductor temperature calculation algorithm is studied. The allowable current of the underground transmission line is determined by the conductor temperature limit. Usually to calculate the allowable current limit, the conductor temperature is assumed in the most worst environment condition. It is possible to increase the transmission capacity if the actual burial environment is considered. Therefore, in this paper an algorithm is proposed to calculate the conductor temperature by distinguishing two area of a underground transmission line condition - the manhole where the temperature sensor can be installed and the underground transmission line in which the temperature sensor can not be installed easily. When calculating the conductor temperature by the underground line in the pipeline, the existing standard describes each environment as a single soil heat resistance and one ambient temperature. In order to compensate this situation, thermal resistance model that can take into consideration the ground surface temperature and under ground temperature is proposed. It is shown that the accuracy of the proposed model is increased compared with the existing standard calculation result.

고온초전도 전력케이블의 기념설계 (Conceptual Design of HTS Power Gable)

  • 조전욱;성기철;김해종;이언용;류강식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 E
    • /
    • pp.1626-1628
    • /
    • 1998
  • In reccent years the large capacity underground power transmission systems have been required gradually with the increasing demand of electric power, the increasing electric power system and the environmental limitations of an overhead transmission line in the city. But it is difficult to get the space for the underground power transmission lines because of complicated distributions of underground public facilities. But as the superconducting power cables have the large power transmission capacity, the high power transmission density, and low loss characteristics in comparison with a conventional cable, the necessity for their development are increasing. In this paper, the results of the conceptual design of HTS power cable is described.

  • PDF

345kV 미금${\sim}$성동변전소간 장거리 지중송전선로 준공 (The first installation of 345kV long-length transmission line between Mikyum and Sungdong substation in Korea)

  • 김영;성정규;고창성;한기종
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 E
    • /
    • pp.1731-1733
    • /
    • 1997
  • The first 150lkV underground transmission line of Korea was installed between Danginri and Yongsan substation in 1974. Since then, the underground transmission lines of about 720 circuit-km had been installed up to 1995. As the national economy has been enlarged and the population of city has been rapidly increased, the demand of an electric power has been very increased. Therefore the first 345kV long-length transmission line of Korea was installed between Mikyum and Sungdong substation on Jan., 1997. This paper describes the design of the 345kV oil-filled cable and its accessories, the design of the system, the methods of installation, field tests, and the future trends of the underground transmission line in Korea.

  • PDF