• 제목/요약/키워드: uncertainty of estimation

검색결과 750건 처리시간 0.021초

파라미터 불확실성 시스템의 구간모델 식별 (Identification of Interval Model for Parametric Uncertain Systems)

  • 김동형;우영태;김영철
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제52권8호
    • /
    • pp.462-470
    • /
    • 2003
  • This paper presents an algorithm of identifying parametric uncertainty by way of an interval model. For a given set of frequency response data from an uncertain linear SISO system of which the upper and the lower bounds of both magnitude and phase responses are represented, the proposed algorithm consists of two main parts: first, the nominal model is identified by using Least Square Estimation (LSE), and then an interval model is constructed by expanding the extremal properties of interval systems, so that tightly enclose the given envelopes within those of interval model. Two numerical examples are given to demonstrate and verify the developed algorithm. The identified interval model can be used for evaluating the worst case performance and stability margins against parametric uncertainty by using some extremal properties on interval systems.

섭동관측기를 연합한 강인 상태추정기 설계 및 해석 (Design and Analysis of a Robust State Estimator Combining Perturbation Observer)

  • 권상주
    • 제어로봇시스템학회논문지
    • /
    • 제11권6호
    • /
    • pp.477-483
    • /
    • 2005
  • This article describes a robust state estimation method which enables to produce reliable estimates in spite of heavy perturbation including plant uncertainty and external disturbances. The main idea is to combine the standard state estimator with the perturbation observer in the estimator frame. The perturbation observer reflects equivalent quantity of plant uncertainty and external disturbances during the estimation process so that the state estimator dynamics gets as close as possible to the real plant dynamics. The robust state estimator proposed in this paper is given in a recursive discrete-time form which is very useful fur implementation purpose. In terms of the error dynamics derived for the robust state estimator, we discuss the stability issue and noise sensitivity. The effectiveness and practicality of the robust state estimator are verified through numerical examples and experimental results.

광물자원 프로젝트의 기술성 및 경제성 평가 기법 (Technical and Financial evaluation for mineral project)

  • 조성준
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2009년도 특별 심포지엄
    • /
    • pp.101-118
    • /
    • 2009
  • In order to invest in overseas mineral projects, it is necessary to have a ability of technical and financial evaluation. Reserve estimation is the most important for mineral appraisal. Geostatistical evaluation of tonnage and grade promises more accurate reserve estimation than traditional methods such as polygon, inverse distance method and so on even if it has some uncertainty. Selection of a mining method and a mineral processing is also important because capex and opcosts of a mineral project is due to the selection. Mineral project is usually evaluated financially using NPV and IRR which are calculated through DCF(Discount Cash Flow). Uncertainty of a mineral project is analyzed statistically using sensitivity analysis and montecarlo simulation.

  • PDF

시공 단계를 고려한 터널의 역해석에 관한 연구 (Back Analysis of Tunnel for multi-step Construction)

  • 김선명;윤지선
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 가을 학술발표회 논문집
    • /
    • pp.479-484
    • /
    • 2000
  • The reliable estimation of the system parameters and the accurate prediction of the system behavior are important to design tunnel safely and economically. Therefore, the back analysis using the field measurements data is useful to evaluate the geotechnical parameter for tunnel. In the back analysis method, the selection of initial value and uncertainty of field measurements influence significantly on the analysis result. In this paper, to overcome uncertainty of field measurements, we performed the back analysis using the displacement data gained at each step of excavation and support.

  • PDF

An Interval Algebra-based Modeling and Routing Method in Bus Delay Tolerant Network

  • Wang, Haiquan;Ma, Weijian;Shi, Hengkun;Xia, Chunhe
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제9권4호
    • /
    • pp.1376-1391
    • /
    • 2015
  • In bus delay-tolerant networks, the route of bus is determinate but its arrival time is indeterminate. However, most conventional approaches predict future contact without considering its uncertainty, which makes a limitation on routing performance. A novel approach is proposed by employing interval algebra to characterize the contact's uncertainty and time-varying nature. The contact is predicted by using the Bayesian estimation to achieve a better routing performance. Simulation results show that this approach achieves a good balance between delivery latency and delivery ratio.

Comparison of EM with Jackknife Standard Errors and Multiple Imputation Standard Errors

  • Kang, Shin-Soo
    • Journal of the Korean Data and Information Science Society
    • /
    • 제16권4호
    • /
    • pp.1079-1086
    • /
    • 2005
  • Most discussions of single imputation methods and the EM algorithm concern point estimation of population quantities with missing values. A second concern is how to get standard errors of the point estimates obtained from the filled-in data by single imputation methods and EM algorithm. Now we focus on how to estimate standard errors with incorporating the additional uncertainty due to nonresponse. There are some approaches to account for the additional uncertainty. The general two possible approaches are considered. One is the jackknife method of resampling methods. The other is multiple imputation(MI). These two approaches are reviewed and compared through simulation studies.

  • PDF

밭토양에서 폐쇄형 자동 챔버법으로 측정한 아산화질소 농도에 대한 측정 불확도 (Measurement Uncertainty of Nitrous Oxide Concentrations from a Upland Soil Measured by an Automated Open Closed Chamber Method)

  • 주옥정;강남구;임갑준
    • 한국환경농학회지
    • /
    • 제39권3호
    • /
    • pp.237-245
    • /
    • 2020
  • BACKGROUND: The closed chamber method is the most commonly used for measuring greenhouse gas emissions from upland fields. This method has the advantages of being simple, easily available and economical. However, uncertainty estimation is essential for accurate assessment of greenhouse gas emissions and verification of emission reductions. The nitrous oxide emissions from upland field is very important for the nitrogen budget in the agriculture sectors. Although assessment of uncertainty components affecting nitrous oxide emission from upland field is necessary to take account of dispersion characteristics, research on these uncertainty components is very rare to date. This study aims at elucidation of influencing factors on measurement uncertainty of nitrous oxide concentrations measured by an automated open closed chamber method from upland field. METHODS AND RESULTS: The nitrous oxide sampling system is located in the upland field in Gyeonggi-do Agricultural Research and Extension Services (37°13'22"N, 127°02'22"E). The primary measurement uncertainty components influencing nitrous oxide concentrations (influencing factors) investigated in this research are repeatability, reproducibility and calibration in the aspects of nitrous oxide sampling and analytical instrumentation. The magnitudes of the relative standard uncertainty of each influencing factor are quantified and compared. CONCLUSION: Results of this study show what influencing factors are more important in determination of nitrous oxide concentrations measured using the automated open closed chambers located in the monitoring site. Quantifying the measurement uncertainty of the nitrous oxide concentrations in this study would contribute to improving measurement quality of nitrous oxide fluxes.

암반에 전달된 밀장전 발파압력의 확률론적 예측 I - 최대 발파압력 예측을 중심으로 - (Probabilistic estimation of fully coupled blasting pressure transmitted to rock mass I - Estimation of peak blasting pressure -)

  • 박봉기;이인모;김동현
    • 한국터널지하공간학회 논문집
    • /
    • 제5권4호
    • /
    • pp.337-348
    • /
    • 2003
  • 밀장전한 암반 발파공에서 화약 폭발시 발생하는 고압의 폭굉압력 전파메카니즘을 충격파 이론을 적용하여 규명하고 전달된 발파압력 산정식을 유도하였다. 유도된 발파압력 산정식은 폭굉파속도, 단열지수, 화약밀도, Hugoniot 상수, 암반밀도의 함수였다. 에멀젼 화약과 서울 화강암의 특성시험을 시행하여 각 특성치의 확률분포를 정의하고 발파압력 산정식에 적용하여 발파압력의 확률분포를 산출하였다. 화약 특성치와 암반 특성치의 확률분포는 정규분포를 나타냈으며 따라서 발파압력의 확률분포도 정규분포로 추정되었다. 발파압력에 대한 매개변수분석을 시행한 결과 폭굉파속도가 발파압력에 가장 크게 영향을 미쳤다. 또한 이런 특성치의 불확실성이 발파압력의 불확실성에 미치는 영향을 분석하였다. 분석결과 암반특성치의 불확실성이 화약특성치보다 더 크게 영향을 미쳤다. 비록 매개변수분석에서 폭굉파속도가 발파압력에 가장 크게 영향을 미치는 요소이지만 암반특성치의 불확실성이 폭굉파속도의 불확실성보다 더 크기 때문에 발파압력은 후자보다 전자에 의해서 더 크게 영향을 받는다.

  • PDF

설계변수의 변동 불확실성을 고려한 신뢰성 기반 최적설계 (Reliability-Based Design Optimization Considering Variable Uncertainty)

  • 임우철;장준용;김정호;나종호;이창근;김용석;이태희
    • 대한기계학회논문집A
    • /
    • 제38권6호
    • /
    • pp.649-653
    • /
    • 2014
  • 대부분의 신뢰성 기반 최적설계는 최적설계 과정에서 설계점이 이동함에도 불구하고 설계변수의 불확실성은 변하지 않는다. 하지만 실제 문제에서 설계변수의 값에 따라 불확실성이 변하는 경우가 있다. 예를 들어 철판의 두께가 설계변수이고, 철판의 제작공차가 불확실성인 경우, 철판의 두께에 따라 철판의 제작공차가 달라지기 때문에 설계변수의 값에 따라 그 값의 불확실성이 변한다. 본 연구에서는 설계변수의 값에 따라 불확실성이 변하는 것을 변동 불확실성으로 정의하고, 이를 신뢰성 기반 최적설계에 적용하는 변동 불확실성을 고려한 신뢰성 기반 최적설계 기법을 제안한다. 수학예제에서 변동 불확실성을 고려하지 않은 신뢰성 기반 최적설계와 변동 불확실성을 고려한 신뢰성 기반 최적설계의 비교를 통해 제안한 방법의 필요성을 확인한다. 또한 엔진 크래들의 변동 불확실성을 고려한 신뢰성 기반 최적설계를 통해 제안한 방법의 유용성을 확인한다.

조도계수와 유량의 불확실성을 고려한 청미천 유역의 홍수위 해석 (Flood stage analysis considering the uncertainty of roughness coefficients and discharge for Cheongmicheon watershed)

  • 신샛별;박지훈;송정헌;강문성
    • 한국수자원학회논문집
    • /
    • 제50권10호
    • /
    • pp.661-671
    • /
    • 2017
  • 본 연구의 목적은 하천의 조도계수와 유량의 불확실성을 고려하여, 부정류 흐름에서 홍수위 해석에 미치는 영향을 정량적으로 분석하는 데 있다. 본 연구에서는 GLUE (Generalized Likelihood Uncertainty Estimation) 기법을 적용하여 조도계수와 유량의 불확실성이 홍수위 해석에 미치는 영향을 분석하고, 강우사상의 크기와 불확실성과의 관계를 분석하였다. 조도계수의 불확실성은 하천기본계획을 참고하여 0.025~0.040의 범위에서 분석하였다. 유량의 불확실성은 수위 h일 때의 유량을 Q라고 할 때, $Q=A(h-B)^C$로 표현되는 수위-유량관계식의 회귀계수 A, B, C를 통해 분석하였다. 수위-유량관계식의 회귀계수를 비선형 회귀분석을 통해 추정하였으며, 회귀계수는 t 분포를 가정하여 95% 신뢰도로 상한과 하한의 범위를 산정하였다. 산정된 회귀계수의 범위는 A는 5.138~18.442, B는 -0.524~0.104, C는 2.427~2.924로 산정되었다. 범위 내에서 10,000개의 매개변수 세트를 추출하여 HEC-RAS (Hydrologic Engineering Center's River Analysis System)에 적용하여 Monte Carlo 모의를 수행하였다. 강우사상 1~3에서 모의된 홍수위의 95% 신뢰구간의 평균적인 범위는 각각 0.39 m, 0.83 m, 0.96 m이며, 첨두 홍수위가 발생했을 때의 범위는 각각 0.52 m, 1.36 m, 1.75 m로 산정되었다. 또한 이천관측소의 1986~2015년의 일 강우에 대한 빈도해석을 수행하였으며, 수행 결과 GEV (Generalized Extreme Vlaue) 분포일 때 강우사상 1~3의 재현기간은 각각 1년, 10년, 25년 빈도에 해당되었다. 본 연구를 통해 강우사상의 크기와 불확실성의 관계를 분석하였으며, 향후 다양한 강우사상에 적용하여 검증한다면 홍수위의 불확실성을 예측하여, 하천관리 등을 위한 구조물의 계획 및 설계 시 의사 결정에 실질적인 도움이 될 수 있을 것으로 사료된다.