• Title/Summary/Keyword: two girder

Search Result 389, Processing Time 0.026 seconds

Development of Deck System for Two-Girder Bridges (합리화 2주형교용 바닥판의 개발을 위한 실험 연구)

  • 주봉철;김병석;김영진;박성용;이정우;신호상
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.113-118
    • /
    • 2001
  • The two-girder composite bridge has the girder space of more than 5m, for special case, over than 15m. Therefor, the design and construction of this bridge system require new approaches. To ensure the structural safety, the deck depth should be increased. Therefore, the economically designed deck system is necessary for th two-girder bridge. This study is the first step to develop the deck system for two-girder bridges. In this study, a literatute survey is performed to develop a new deck system for two-girder type of bridges. By considering the characteristics of two-girder bridge system, a cast-in-place PSC deck is proposed for the two-girder bridges. To examine structural behavior and safety of the proposed PSC deck, three real scale partition deck(3m$\times$5m) are tested under the static loading. In the test, the failure mode and behavior of each specimen, and ultimate load carrying capacity of the two-girder-bridge deck are identified.

  • PDF

After-fracture redundancy in simple span two-girder steel bridge

  • Park, Yong-Myung;Joe, Woom-Do-Ji;Hwang, Min-Oh;Yoon, Tae-Yang
    • Structural Engineering and Mechanics
    • /
    • v.27 no.6
    • /
    • pp.651-670
    • /
    • 2007
  • An experimental study to evaluate a redundancy capacity in simple span two plate-girder bridges, which are generally classified as a non-redundant load path structure, has been performed under the condition that one of the two girders is seriously damaged. The bottom lateral bracing was selected as an experimental parameter and two 1/5-scale bridge specimens with and without bottom lateral bracing have been prepared. The loading tests were first performed on the intact specimens without cracked girder within elastic range. Thereafter, the ultimate loading tests were conducted on the damaged specimens with an induced crack at the center of a girder. The test results showed that the cross beams and concrete deck redistributed partly the applied load to the uncracked girder, but the lateral bracing system played a significant role of the load redistribution when a girder was damaged. The redundancy was evaluated based on the test results and an appropriate redundancy level was evaluated when the lateral bracing was provided in a seriously damaged simple span two-girder steel bridge.

Optimum Evaluation of PS Concrete Deck and High Strength Two Plate Girder System (PS 콘크리트 바닥판 및 고강도 2주형 거더 시스템의 최적설계평가)

  • 박태훈;박문호;조창근;권민호;남유석
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2003.04a
    • /
    • pp.185-192
    • /
    • 2003
  • This study presents the Optimum Evaluation of PS Concrete Deck and High Strength Two Plate Girder System. Recently, for the simplification of structure and the long length of bridge, a small number girder bridge which minimized a number of girder by two is much designed and constructed. For the structural analysis, a finite element formulation considering with even the matter of torsion in the three-dimensional problem is presented. And connectively, for the design of optimum section, an algorithm of optimum design is developed. The section of a small number girder bridge which constituted of two girders and PS Concrete Deck is optimized by using optimum program developed in this study. and two girders bridge refered in this study is proved a efficiency and a economy by being compared and checked to the general plate girder bridge with five girder and Reinforced Concrete Deck.

  • PDF

After-fracture behaviour of steel-concrete composite twin I-girder bridges: An experimental study

  • Lin, Weiwei
    • Steel and Composite Structures
    • /
    • v.42 no.1
    • /
    • pp.139-149
    • /
    • 2022
  • To simplify the design and reduce the construction cost of traditional multi-girder structural systems, twin I-girder structures are widely used in many countries in recent years. Due to the concern on post-fracture redundancy, however, twin girder bridges are currently classified as fracture critical structures in AASHTO specifications for highway bridges. To investigate the after-fracture behavior of such structures, a composite steel and concrete twin girder specimen was built and an artificial fracture through the web and the bottom flange was created on one main girder. The static loading test was performed to investigate its mechanical performance after a severe fracture occurred on the main girder. Applied load and vertical displacement curves, and the applied load versus strain relationships at key sections were measured. To investigate the load distribution and transfer capacities between two steel girders, the normal strain development on crossbeams was also measured during the loading test. In addition, both shear and normal strains of studs were also measured in the loading test to explore the behavior of shear connectors in such bridges. The functions and structural performance of structural members and possible load transfer paths after main girder fractures in such bridges were also discussed. The test results indicate in this study that a typical twin I-girder can resist a general fracture on one of its two main girders. The presented results can provide references for post-fracture performance and optimization for the design of twin I-girder bridges and similar structures.

Fatigue characteristics of the IT girder for railroad (철도교용 IT거더의 피로특성)

  • Choi, Sang-hyun;Lee, Chang-soo
    • Journal of the Society of Disaster Information
    • /
    • v.6 no.2
    • /
    • pp.119-130
    • /
    • 2010
  • In designing a railroad bridge, the fatigue is one of the main factors to be considered for ensuring safe operation. Especially, for a new type of a structural member, which has not been adopted to railroad bridges, the fatigue performance should be checked. In this paper, the fatigue characteristics of an IT girder are examined. The IT girder is a new type of a prestressed concrete girder which has two prestressed H-beams in the top of the girder to give the girder additional sectional capacity. To obtain the fatigue performance, a 10m IT girder specimen is designed, and a repeated load test is performed by applying the load cyclically two million times. The magnitude of the repeated load is determined considering the stress level under the service condition. During the test, static load tests are performed to identify the stiffness degradation. The fatigue performance of the girder is checked according to the Japanese and the CEB-FIB design codes. The fatigue test result shows that the IT girder satisfies both design codes.

Fatigue characteristics of the IT girder for railroad (철도교용 IT거더의 피로특성)

  • Choi, Sang-hyun;Lee, Chang-soo
    • Journal of the Society of Disaster Information
    • /
    • v.6 no.1
    • /
    • pp.140-152
    • /
    • 2010
  • In designing a railroad bridge, the fatigue is one of the main factors to be considered for ensuring safe operation. Especially, for a new type of a structural member, which has not been adopted to railroad bridges, the fatigue performance should be checked. In this paper, the fatigue characteristics of an IT girder are examined. The IT girder is a new type of a prestressed concrete girder which has two prestressed H-beams in the top of the girder to give the girder additional sectional capacity. To obtain the fatigue performance, a 10m IT girder specimen is designed, and a repeated load test is performed by applying the load cyclically two million times. The magnitude of the repeated load is determined considering the stress level under the service condition. During the test, static load tests are performed to identify the stiffness degradation. The fatigue performance of the girder is checked according to the Japanese and the CEB-FIB design codes. The fatigue test result shows that the IT girder satisfies both design codes.

Field distribution factors and dynamic load allowance for simply supported double-tee girder bridges

  • Kidd, Brian;Rimal, Sandip;Seo, Junwon;Tazarv, Mostafa;Wehbe, Nadim
    • Structural Engineering and Mechanics
    • /
    • v.82 no.1
    • /
    • pp.69-79
    • /
    • 2022
  • This paper discusses the field testing of two single-span double-tee girder (DTG) bridges in South Dakota to determine live load distribution factors (LLDFs) and the dynamic load allowance (IM). One bridge had seven girders and another had eight girders. The longitudinal girder-to-girder joints of both bridges were deteriorated in a way that water could penetrate and the joint steel members were corroded. A truck traveled across each of the two bridges at five transverse paths. The paths were tested twice with a crawl speed load test and twice with a dynamic load. The LLDFs and IM were determined using strain data measured during the field tests. These results were compared with those determined according to the AASHTO Standard and the AASHTO LRFD specifications. Nearly all the measured LLDFs were below the AASHTO LRFD design LLDFs, with the exception of two instances: 1) An exterior DTG on the seven-girder bridge and 2) An interior DTG on the eight-girder bridge. The LLDFs specified in the AASHTO Standard were conservative compared with the measured LLDFs. It was also found that both AASHTO LRFD and AASHTO Standard specifications were conservative when estimating IM, compared to the field test results for both bridges.

Fatigue performance of a new type PSC girder (신형식 PSC거더의 피로 성능)

  • Choi, Sang-Hyun;Lee, Chang-Soo;Kim, Tae-Kyun;Eui, Chul-Soo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.965-972
    • /
    • 2011
  • Unlike metallic materials, the importance of fatigue performance of concrete has been ignored. However, it is reported that environmental effects, if it cause deterioration, may increase the risk of fatigue failure under repeated loadings. In case of railroad bridges, the risk may increase due to highly periodic, repetitive, heavier nature of train load, which runs through the fixed passage called the track. Especially, when new material or structure is implemented for a main bridge member, experimental validation should be performed to avoid damage or failure due to unexpected behavior. In this paper, the fatigue performance of an IT girder is examined via a repeated loading test. The IT girder is a new type of a prestressed concrete (PSC) girder with two prestressed H-beams in the top of the girder, which provide additional sectional capacity, and it can be applied to the span longer than 30m which is a typical limit for a usual PSC girder. To obtain the fatigue performance, a 10m IT girder specimen is designed, and a repeated load test is performed by applying the cyclic load two million times. The fatigue performance of the girder is examined according to the Japanese and the CEB-FIB design codes. The fatigue test result shows that the IT girder satisfies both design codes.

  • PDF

Theoretical analysis of simply supported channel girder bridges

  • Hu, Hong-Song;Nie, Jian-Guo;Wang, Yu-Hang
    • Structural Engineering and Mechanics
    • /
    • v.56 no.2
    • /
    • pp.241-256
    • /
    • 2015
  • Channel girder bridges that consist of a deck slab and two side beams are good choices for railway bridges and urban rail transit bridges when the vertical clearance beneath the bridge is restricted. In this study, the behavior of simply supported channel girder bridges was theoretical studied based on the theory of elasticity. The accuracy of the theoretical solutions was verified by the finite element analysis. The global bending of the channel girder and the local bending of the deck slab are two contributors to the deformations and stresses of the channel girder. Because of the shear lag effect, the maximum deflection due to the global bending could be amplified by 1.0 to 1.2 times, and the effective width of the deck slab for determining the global bending stresses can be as small as 0.7 of the actual width depending on the width-to-span ratio of the channel girder. The maximum deflection and transversal stress due to the local bending are obtained at the girder ends. For the channel girders with open section side beams, the side beam twist has a negligible effect on the deflections and stresses of the channel girder. Simplified equations were also developed for calculating the maximum deformations and stresses.

Development and Experimental Performance Evaluation of Steel Composite Girder by Turn Over Process (단면회전방법을 적용한 강합성 소수주거더 개발 및 실험적 성능 평가)

  • Kim, Sung Jae;Yi, Na Hyun;Kim, Sung Bae;Kim, Jang-Ho Jay
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5A
    • /
    • pp.407-415
    • /
    • 2010
  • In Korea, more than 90% of the total number of steel bridges built for 40~70 m span length is a steel box-girder bridge type. A steel box-girder bridge is suitable for long span or curved bridges with outstanding flexural and torsional rigidity as well as good constructability and safety. However, a steel box-girder bridge is uneconomical, requiring many secondary members and workmanship such as stiffeners and ribs requiring welding attachments to flanges or webs. Therefore, in US and Japan, a plate girder bridge, which is relatively cheap and easy to construct is generally used. One type of the plate girder bridge is the two- or three-main girder plate bridge, which is a composite plate girder bridge that minimizes the number of required main girders by increasing the distance between the adjacent girders. Also, for the simplification of girder section, the stiffener which requires attachment to the web is not required. The two-main steel girder plate bridge is a representative type of plate girder bridges, which is suitable for bridges with 10 m effective width and has been developed in the early 1960s in France. To ensure greater safety of two- or three-main girder plate bridges, a larger steel section is used in the bridge domestically than in Europe or Japan. Also, the total number of two- or three-main girder plate bridge constructed in Korea is significantly less than the steel box girder bridge due to a lack of designers' familiarity with more complex design detailing of the bridge compare to that of a steel box girder bridge design. In this study, a new construction method called Turn Over method is proposed to minimize the steel section size used in a two- or three-main girder plate bridge by applying prestressing force to the member using confining concrete section's weight to reduce construction cost. Also, a full scale 20 m Turn Over girder specimen and a Turn Over girder bridge specimen were tested to evaluate constructability and structural safety of the members constructed using Turn Over process.