A Study on the Tunnel Stability using Grouting Technique (그라우팅에 의한 터널 보강효과의 해석적 연구)

  • 이종우;이준석;김문겸
    • Tunnel and Underground Space
    • /
    • v.6 no.4
    • /
    • pp.298-305
    • /
    • 1996
  • Grouting technique is frequently used where a tunnel structure is passing through the shallow overburden area or where the thickness of hard rock above the tunnel is rather thin. However, engineering background on design process of the grout reinforcement does not seem to be fully understood until now. Mechanics of composite material is, therefore, introduced in this study to investigate the orthotropic material properties of the composites containing soil(or rock) and grouting material. These orthotropic material properties can be used to represent the reinfocement effects quantitatively. The model developed in this study is next applied to a typical tunnel structure and the grouting effect is analyzed numerically. The idea used in this study can be expanded to a situation where a pipe roofing or a forepoling technique is adopted and a simplified design procedure, similar to the model model introduced in this study, can be developed.

  • PDF

Study on the Effective Method of Fire Protection Technology in Railway Tunnel Fire (철도터널 내화성능 기술개발을 위한 내화성능 확보방안에 관한 연구)

  • Park, Kyung-Hoon;Kim, Heung-Yeol;Kim, Hyung-Jun
    • Fire Science and Engineering
    • /
    • v.24 no.4
    • /
    • pp.86-91
    • /
    • 2010
  • In event of a tunnel fire, all kinds of equipment can be destroyed in high temperature that can exceed $1300^{\circ}C$, fatal structural demage can be caused by spalling of concrete structural elements. To make matters worse, there is a high possibility of the secondary damage which can lead to the collapse of the shear resisting structure. Accordingly, it is time that we developed the technology to counter fires in connection with the fire-resistant design of a tunnel structure. To secure the reliability of the fire-resistance performance of a tunnel structure, it is necessary to assess the fire's behavior on every structural element exposed to the fire as well as to calculate the tunnel fire intensity and the quantity of heat released. In this study, we drew out the fire damage range of each structural element of a tunnel and the minimum thickness of concrete cover for each fire-resistant material through some actual experiments of fire behavior on the structural elements of a tunnel.

Image-Data-Acquisition and Data-Structuring Methods for Tunnel Structure Safety Inspection (터널 구조물 안전점검을 위한 이미지 데이터 취득 및 데이터 구조화 방법)

  • Sung, Hyun-Suk;Koh, Joon-Sub
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.1
    • /
    • pp.15-28
    • /
    • 2024
  • This paper proposes a method to acquire image data inside tunnel structures and a method to structure the acquired image data. By improving the conditions by which image data are acquired inside the tunnel structure, high-quality image data can be obtained from area type tunnel scanning. To improve the data acquisition conditions, a longitudinal rail of the tunnel can be installed on the tunnel ceiling, and image data of the entire tunnel structure can be acquired by moving the installed rail. This study identified 0.5 mm cracked simulation lines under a distance condition of 20 m at resolutions of 3,840 × 2,160 and 720 × 480 pixels. In addition, the proposed image-data-structuring method could acquire image data in image tile units. Here, the image data of the tunnel can be structured by substituting the application factors (resolution of the acquired image and the tunnel size) into a relationship equation. In an experiment, the image data of a tunnel with a length of 1,000 m and a width of 20 m were obtained with a minimum overlap rate of 0.02% to 8.36% depending on resolution and precision, and the size of the local coordinate system was found to be (14 × 15) to (36 × 34) pixels.

A Review on TOPCon Solar Cell Technology

  • Yousuf, Hasnain;Khokhar, Muhammad Quddamah;Chowdhury, Sanchari;Pham, Duy Phong;Kim, Youngkuk;Ju, Minkyu;Cho, Younghyun;Cho, Eun-Chel;Yi, Junsin
    • Current Photovoltaic Research
    • /
    • v.9 no.3
    • /
    • pp.75-83
    • /
    • 2021
  • The tunnel oxide passivated contact (TOPCon) structure got more consideration for development of high performance solar cells by the introduction of a tunnel oxide layer between the substrate and poly-Si is best for attaining interface passivation. The quality of passivation of the tunnel oxide layer clearly depends on the bond of SiO in the tunnel oxide layer, which is affected by the subsequent annealing and the tunnel oxide layer was formed in the suboxide region (SiO, Si2O, Si2O3) at the interface with the substrate. In the suboxide region, an oxygen-rich bond is formed as a result of subsequent annealing that also improves the quality of passivation. To control the surface morphology, annealing profile, and acceleration rate, an oxide tunnel junction structure with a passivation characteristic of 700 mV or more (Voc) on a p-type wafer could achieved. The quality of passivation of samples subjected to RTP annealing at temperatures above 900℃ declined rapidly. To improve the quality of passivation of the tunnel oxide layer, the physical properties and thermal stability of the thin layer must be considered. TOPCon silicon solar cell has a boron diffused front emitter, a tunnel-SiOx/n+-poly-Si/SiNx:H structure at the rear side, and screen-printed electrodes on both sides. The saturation currents Jo of this structure on polished surface is 1.3 fA/cm2 and for textured silicon surfaces is 3.7 fA/cm2 before printing the silver contacts. After printing the Ag contacts, the Jo of this structure increases to 50.7 fA/cm2 on textured silicon surfaces, which is still manageably less for metal contacts. This structure was applied to TOPCon solar cells, resulting in a median efficiency of 23.91%, and a highest efficiency of 24.58%, independently. The conversion efficiency of interdigitated back-contact solar cells has reached up to 26% by enhancing the optoelectrical properties for both-sides-contacted of the cells.

A hybrid MC-HS model for 3D analysis of tunnelling under piled structures

  • Zidan, Ahmed F.;Ramadan, Osman M.
    • Geomechanics and Engineering
    • /
    • v.14 no.5
    • /
    • pp.479-489
    • /
    • 2018
  • In this paper, a comparative study of the effects of soil modelling on the interaction between tunnelling in soft soil and adjacent piled structure is presented. Several three-dimensional finite element analyses are performed to study the deformation of pile caps and piles as well as tunnel internal forces during the construction of an underground tunnel. The soil is modelled by two material models: the simple, yet approximate Mohr Coulomb (MC) yield criterion; and the complex, but reasonable hardening soil (HS) model with hyperbolic relation between stress and strain. For the former model, two different values of the soil stiffness modulus ($E_{50}$ or $E_{ur}$) as well as two profiles of stiffness variation with depth (constant and linearly increasing) were used in attempts to improve its prediction. As these four attempts did not succeed, a hybrid representation in which the hardening soil is used for soil located at the highly-strained zones while the Mohr Coulomb model is utilized elsewhere was investigated. This hybrid representation, which is a compromise between rigorous and simple solutions yielded results that compare well with those of the hardening soil model. The compared results include pile cap movements, pile deformation, and tunnel internal forces. Problem symmetry is utilized and, therefore, one symmetric half of the soil medium, the tunnel boring machine, the face pressure, the final tunnel lining, the pile caps, and the piles are modelled in several construction phases.

Numerical approach on relationship between deformation of artificial crack and stress acting on tunnel shotcrete lining (인공균열 주위의 변형과 터널 숏크리트 라이닝 응력간의 상관관계에 대한 수치해석적 검토)

  • Shin, Hyu-Soung;Kwon, Young-Cheul;Bae, Gyu-Jin;Kim, Kyung-Shin;Kim, Hong-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.64-71
    • /
    • 2009
  • The stresses acting on shotcrete lining of tunnel have been measured virtually by monitoring instruments installed during construction. However, the malfunction of instrument and the lack of consistency of signal have always been controversial, but re-installation of instrument after construction of tunnel lining is practically impossible. Therefore, authors have carried out the study to develop a new technique for estimating the stress acting on shotcrete lining during and after construction. In the technique, stresses of shotcrete lining can be estimate by the measurement of deformation of free face. Therefore, the relationships between the stresses of shotcrete lining and deformation of free surface are indispensable factor. In this paper, the parametric study using 2D FEM analysis was carried out to estimate the relationships between the stress level acting on the tunnel shotcrete lining and the deformation near the free face (e.g. artificial crack in this study). The distribution of stresses of shotcrete lining is also investigated in this study as the preliminary investigation for the large-scale tunnel lining test and detailed 3D FEM analysis.

  • PDF

The Continuously Underwater Tunnelling Methods by Incremental launching Methods (연속압출공법(ILM)을 이용한 수저(水底)터널공법에 관한 연구)

  • Jung, Byung-Ryul;Ryu, Dong-Hun;Kim, Joon-Mo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.28-41
    • /
    • 2009
  • We know the several construction methods for underwater tunnel, but properly submerged concrete box type tunnel was mostly good structure stability and mostly shot length of tunnels. Submerged box type tunnel was buildup the unit segments in dry dock or ship yard by 10 to 20meters. The submerged box was composed with segments was join each together. It was installing the gate and waterproofing the coupling the front hull of a box. The complete submerged box rise up to the surface water, tow in the submerged box by tugboat, going to the destination of tunnel construction site. Beforehand dredge up soil at the bottom of a underwater, sinking the submerged box, connection together complete submerged box in underwater. The research and development ILM tunneling method is receiving careful study. Biggest weakness in submerged concrete box type tunnel was pressure waterproofing, box to box connecting, complete submerged boxes navigation and installation, after operation the submerged tunnel and management concrete box structure. It was positive evidence in submerged concrete box type tunnel. We make a practical application of the principle "the ILM tunneling method in underwater construction methods."

  • PDF

Experimental study of improvement of ventilation efficiency at intersection in network-form underground road tunnel (네트워크형 지하 도로터널 분기부에서의 환기효율 향상방안에 대한 실험적 연구)

  • Lee, Ho-Seok;Hong, Ki-Hyuk;Choi, Chang-Rim;Kang, Myung-Koo;Lim, Jae-Bom;Mun, Hong-Pyo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.107-116
    • /
    • 2012
  • The experiment was performed to analyze the intersectional ventilation efficiency by intersection structure and Jet Fan in network-form road tunnel. For this, the size of real road tunnel was reduced by 1/45. To apply traffic inertia force when driving, blower fan was used to form an airflow in model tunnel and the intersectional efficiency was also investigated by measuring the speed at local point of the tunnel. To improve the reduction of ventilation caused by the structure character, Jet Fan was installed to optimize ventilation efficiency in tunnel.

An experimental study on the operation mode of rapid flooding protection system in tunnel (축소모형실험을 통한 터널 내 급속침수 차폐자동화 시스템 작동형태에 대한 연구)

  • Kim, Yeon-Deok;Kong, Min-Teak;Hwang, Beoung-Hyeon;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1147-1159
    • /
    • 2018
  • This study focuses on the verification of a rapid protection automation system using an inflatable structure. The inflatable structure is an automatic rapid protection system against human and material damage when the subsea tunnel is flooded. Especially, it is essential for construction and operation of subsea tunnels. In this study, we have experimentally verified the rapid protection automation system using the inflatable structure designed for this problem. In order to verify this, a model tunnel with a 40: 1 reduction ratio was constructed, and air pressure of 0.1 bar and 0.15 bar was injected to divide the tunnel according to the expansion rate at 10 sec and 20 sec. According to the results of the study, the protection efficiency was better at 0.15 bar than 0.1 bar when the expansion structure was expanded, and the protection efficiency and influent control efficiency were different according to the pneumatic injection time of the inflating structure. As a result of this study, it was found that the higher the internal air pressure of the inflated structure and the faster the inflation of rate, the more effectively the inflated structure was inflated. As a result of this study, it is necessary to further study the wedge type structure which is useful for the storage method of expansion structure, shape and expansion derivative, inhibition of expansion structure during protection and control of inflow water.