Damage Detection of Decrepit Tunnel Structures using the NDT (비파괴 검사법에 의한 노후터널의 건전도 평가)

  • Kim, Dong-Gyou;Jung, Ho-Seop
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1388-1391
    • /
    • 2010
  • Recently, the construction of road, subway, railroad, and microtunnel for electricity supplement have been increased because of increasement of traffic in urban area, increasement of industrial transportation, and the network between cities in Korea. The deterioration of tunnel structure may occur by various internal and external factors and particularly, tunnel structures tend to contact with either underground water or harmful ions. Therefore, leakage sometimes occurred through the cracks and joints of concrete lining. The leakage in tunnel may affect the durability of concrete lining. In this study, to evaluate the durability and deterioration of concrete lining in tunnel structures, we were performed the various experiments for compressive strength. Compressive strength obtained from nondestructive inspection and compressive strength test varies according to the concrete lining conditions.

  • PDF

A Case Study on the Design of Railway Tunnel through section for under OO temple (OO 사찰 하부 터널통과 설계 사례)

  • Kim, Shin;Lee, Sung-Ki;Seo, Hyoung-Chul;Kwag, Jung-Yeol;Cho, Bong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.208-218
    • /
    • 2006
  • It is very important to evaluate predictable problems diversely such as stability of a tunnel and structures when tunnel is inevitably constructed in the area where is adjacent to a structure and low overburden. Double electrified railway design on the third section of Donghae-Nambu line studied in this paper has some problems mentioned above. So more careful works are required before construction. In this study, ground surrounding is composed of faults, fault zone and set back about 13m from a Buddhist temple located on the upper part of the tunnel. From these conditions, this case study presents proper methods considering ground condition, effects of blasting and civil petitions. It is tried to make the tunnel and Buddhist temple stable by analytical technique and analysis of existing cases. And design considering stability of tunnel and adjacent structure during operation is carried out as well. Especially, environmentally friendly railway tunnel which is appropriate to the local condition and surroundings is designed by minimizing noise and vibration that is able to occur during construction and train service. From now on, this study is helpful to better design in the case of tunnel design which has to consider civil petition.

  • PDF

A modified shell-joint model for segmental tunnel dislocations under differential settlement

  • Jianguo Liu;Xiaohui Zhang;Yuyin Jin;Wenyuan Wang
    • Geomechanics and Engineering
    • /
    • v.35 no.4
    • /
    • pp.411-424
    • /
    • 2023
  • Reasonable estimates of tunnel lining dislocations in the operation stage, especially under longitudinal differential settlement, are important for the design of waterproof gaskets. In this paper, a modified shell-joint model is proposed to calculate shield tunnel dislocations under longitudinal differential settlement, with the ability to consider the nonlinear shear stiffness of the joint. In the case of shell elements in the model, an elastoplastic damage constitutive model was adopted to describe the nonlinear stress-strain relationship of concrete. After verifying its applicability and correctness against a full-scale tunnel test and a joint shear test, the proposed model was used to analyze the dislocation behaviors of a shield tunnel in Shanghai Metro Line 2 under longitudinal differential settlement. Based on the results, when the tunnel structure is solely subjected to water-earth load, circumferential and longitudinal joint dislocations are all less than 0.1 mm. When the tunnel suffers longitudinal differential settlement and the curvature radius of the differential settlement is less than 300 m, although maximum longitudinal joint dislocation is still less than 0.1 mm, the maximum circumferential joint dislocation is approximately 10.3 mm, which leads to leakage and damage of the tunnel structure. However, with concavo-convex tenons applied to circumferential joints, the maximum dislocation value reduces to 4.5 mm.

A mathematical model for the along-wind coefficient of tower crane based on the member load

  • Wei Chen;Xianrong Qin;Zhigang Yang
    • Wind and Structures
    • /
    • v.37 no.5
    • /
    • pp.347-359
    • /
    • 2023
  • The along-wind coefficient is the key parameter for wind load calculations in tower crane structure design. It is often calculated using overall parameter characteristics, which may lead to inaccurate results. In this study, six types of tower masts and four types of tower jibs with different overall structural characteristics and member characteristics are established. Through wind tunnel force tests and CFD numerical simulation, the along-wind coefficient of the overall structure and each member are obtained. Based on the characteristics of the slenderness ratio and spacing ratio of the members, a mathematical model for calculating the along-wind coefficient of the tower crane structure is proposed. The calculated results are in accordance with the wind tunnel test results. The maximum relative error is -6.25%, and the minimum relative error is 0.68%. To ensure accuracy, it is necessary to calculate the along-wind coefficient of the tower crane structure based on the load of each structure member rather than using overall parameter characteristics.

Assessment of 3D earthquake response of the Arhavi Highway Tunnel considering soil-structure interaction

  • Sevim, Baris
    • Computers and Concrete
    • /
    • v.11 no.1
    • /
    • pp.51-61
    • /
    • 2013
  • This paper describes earthquake response of the Arhavi Highway Tunnel its geometrical properties, 3D finite element model and the linear time history analyses under a huge ground motion considering soil-structure interaction. The Arhavi Highway Tunnel is one of the tallest tunnels constructed in the Black Sea region of Turkey as part of the Coast Road Project. The tunnel has two tubes and each of them is about 1000 m tall. In the study, lineartime history analyses of the tunnel are performed applying north-south, east-west and up accelerations components of 1992 Erzincan, Turkey ground motion. In the time history analyses, Rayleigh damping coefficients are calculated using main natural frequency obtained from modal analysis. Element matrices are computed using the Gauss numerical integration technique. The Newmark method is used in the solution of the equation of motion. Because of needed too much memory for the analyses, the first 10 second of the ground motions, which is the most effective duration, is taken into account in calculations. The results obtained 3D finite element model are presented. In addition, the displacement and stress results are observed to be allowable level of the concrete material during the earthquakes.

Case Study on the Impact-Echo Method for Tunnel Safety Diagnosis (터널 안전진단을 위한 충격반향법 사례 연구)

  • Shin, Sung-Ryul;Jo, Cheol-Hyun
    • Tunnel and Underground Space
    • /
    • v.19 no.1
    • /
    • pp.19-30
    • /
    • 2009
  • For the purpose of determining the thickness of concrete lining and detect of the cavity where may be located behind tunnel lining, IE (Impact-Echo) method it effectively useful in the tunnel safety diagnosis and the quality control during the construction. As a part of case study, we applied IE method to various tunnel structure types such as road tunnel and subway tunnel constructed by NATM (New Austrian Tunnelling Method) and ASSM (American Steel Support Method). As tunnel specifications estimated from this method were compared with coring data, design drawing and other survey results, it was very good agreement with each other. In conclusion, we verified that IE method shows an accurate and reliable result. The conventional interpretation of IE method in frequency domain gives only vertical information at a certain point. However, the interpretation using time-frequency analysis and depth section imaging technique from two dimensional profiling surveys can show more reliable information about structure inside.

Response Analysis of Block-Bearing Structure due to Tunnel Excavation in Clay Ground (점토지반에서 터널굴착에 따른 상부 블록구조물의 거동분석)

  • Son, Moorak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.175-183
    • /
    • 2014
  • This study investigates the response of structures to tunnelling-induced ground movements in clay ground, varying tunnel excavation condition (tunnel depth and diameter), tunnel construction condition (ground loss), and tunnel ground condition (soft clay and stiff clay). Four-story block-bearing structures have been used because the structures can easily be characterized of the extent of damages with crack size and distribution. Numerical parametric studies have been used to investigate of the response of structures to varying tunnelling conditions. Numerical analysis has been conducted using Discrete Element Method (DEM) to have real cracks when the shear and tensile stress exceed the maximum shear and tensile strength. The results of structure responses from various parametric studies have been integrated to consider tunnel excavation condition, tunnel construction condition, and tunnel ground condition and provide a relationship chart among them. Using the chart, the response of structures to tunnelling can easily be evaluated in practice in clay ground.

Analysis of Response Change of Structure due to Tunnel Excavation Conditions in Sand Ground (모래지반에서 터널 굴착조건들을 반영한 상부 블록구조물의 거동변화 분석)

  • Son, Moorak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1541-1549
    • /
    • 2013
  • This study investigates the response of structures to tunnelling-induced ground movements in sand ground, varying tunnel excavation condition (tunnel depth and diameter), tunnel construction condition (ground loss), ground condition (loose sand and dense sand). Four-story block-bearing structures have been used because the structueres can easily be characterized of the extent of dmages with crack size and distribution. Numerical parametric studies have been used to investigae of the response of structures to varying tunnelling conditions. Numerical analysis has been conducted using Discrete Element Method (DEM) to have real cracks when the shear and tensile stress exceed the maximum shear and tensile strength. The results of structure responses from various parametric studies have been integrated to consider tunnel excavation condition, tunnel construction condition, and ground condition and provided as a relationship chart. Using the chart, the response of structures to tunnelling can easily be evaluated in practice in sand ground.

Mechanical behaviour of tunnel liner using precast segment reinforced by rib (리브 보강 프리캐스트 터널 Liner의 역학적 거동 특성)

  • Lee, Gyu-Phil;Lee, Sung-Won;Shiin, Hyu-Soung;Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.295-302
    • /
    • 2008
  • Due to the limitation of construction efficiency and structural safety, the application of the high covering and wide width tunnels was limited prior to the introduction of precast cut and cover tunnels. Therefore, a cut and cover tunnel structure with rib reinforcement is proposed to mechanically improve the safety on condition of high covering and wide width tunnel. In this study, large-scale experiments are carried out to examine the mechanical behavior of the cut and cover tunnel structure with rib reinforcement under static load condition. Based on the results obtained from this study, the ultimate load of tunnel structure increases to about 3.3 times by rib reinforcement. Consequently, safety of tunnel structure increases compared to non-installed cases due to confining crown part by rib reinforcement.

  • PDF

A Development for Maintenance System of Tunnel Structure (터널구조물의 유지관리시스템 개발)

  • Kong Sung Suk;Kim Dong Wook;Ku Ja Kap;Lee Song
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.585-590
    • /
    • 2003
  • The execution with respect to tunnel structure has been carried out more important than maintenance until present time. There is a lot of interests on the maintenance of institution that is used by the nation, because of the recent miserable accidents. Consequently there need an organizational and efficient system. This paper has presented the sort, source and part of damage of tunnel structures etc. and then performed to analyze about the special quality of tunnel structure through input detailed safety assessment report data as well as fulfilment statical analysis. In conclusion, the paper's intention is presenting the maintenance system base on those.