• Title/Summary/Keyword: tunnel convergence

Search Result 211, Processing Time 0.03 seconds

Prediction of a Fault Zone ahead of a Tunnel Face based on the Orientation of Displacement Vectors (변위벡터방향성을 이용한 터널 전방 단층대 예측에 관한 연구)

  • Kim, Kwang-Yeom;Yim, Sung-Bin;Kim, Jang-Kyeom;Seo, Yong-Seok;Kim, Jin-Woung
    • The Journal of Engineering Geology
    • /
    • v.20 no.4
    • /
    • pp.371-380
    • /
    • 2010
  • A three-dimensional finite element analysis was performed to predict the location of a fault zone ahead of a tunnel face based on convergence displacement. Geometrical models for the numerical analysis were developed based on the possible geometric intersection between the fault zone and the tunnel. Fifteen fault models were generated from combinations of faults with five different strikes (at $15^{\circ}$ intervals) and three dips (vertical, $45^{\circ}$ and $-45^{\circ}$) relative to the tunnel route. The displacements on the crown and side walls were calculated and analyzed using a vector orientation approach. As a result, nine representative prediction charts were developed, showing location and orientation of the fault zone based on convergence displacement.

Convergence change in a tunnel face approaching fault zones (파쇄대에 접근하는 터널의 내공변위 변화 해석)

  • Lee, In-Mo;Lee, Seung-Ju;Lee, Joo-Gong;Lee, Dae-Hyuck
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.3
    • /
    • pp.235-245
    • /
    • 2002
  • The purpose of this study is to figure out the tendency of tunnel convergence during excavation and to present a methodology for the prediction of a fault zone ahead of a tunnel face by analyzing three dimensional displacements in various ways. 3-D numerical analysis was performed to investigate changes of tunnel convergence vectors near a fault zone and to propose a flow chart for predicting fault zones. Results of the site investigation and results of trend line analysis of in-situ data were compared to verify the usefulness of a trend line analysis. It is concluded that the orientation of faults can be predicted by using stereonets and the direction of initial stresses can be predicted from the arm length of a displacement vector as a tunnel approaches fault zones. The results of the trend line analysis coincided with those of the site investigation, and a methodology for the prediction of a fault zone was proposed.

  • PDF

Application and Development Trend of OTDRs (분포형 광섬유센서의 응용 및 개발 동향)

  • Chae, Kwagn-Seok;Lee, Sang-Pil;Lee, Chang-Ho;Han, Sung-Jae
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.1-10
    • /
    • 2011
  • In these days, the development of optical fiber sensor technology is so remarkable that it can measure various physical and chemical quantities ranging from a few millimeters to over several kilometers. In addition, it is attempted to assess the structural integrity of the state of the advanced technologies and existing structures such as ships, aircrafts, and bridges. This paper introduced the case histories of the measuring technology of optical fiber applied on structures such as roads and tunnels. The case history using OTDR (Optical Time Domain Reflectometery) was also introduced in this paper. Measurement of the pre-convergence of a tunnel is essential to assess the safety of a tunnel and understand the geological conditions ahead of an advancing tunnel. Therefore, the pre-convergence measuring technology using OTDR is expected to substitute conventional measuring techniques.

Study on the Wake Evolution on the Non-Planar Ground Using a Discrete Vortex Method (이산와류법을 사용한 비평면 지면 와류전개 연구)

  • Han, Cheolheui
    • Journal of Institute of Convergence Technology
    • /
    • v.6 no.2
    • /
    • pp.21-24
    • /
    • 2016
  • Accurate simulation of wakeshapes behind a wing is important for the performance prediction of the aircraft and the wake hazard problem in the airport. In the present study, wakeshapes behind a wing inside tunnels are simulated in regard to the development of wing-in-ground effect vehicles. A discrete vortex method with a nonplanar ground modelling is used for the simulation. It was found that the wingtip vortices move toward outboard directions when the wing is in ground effect. When the wing is placed inside tunnels, the wingtip vortices move along the tunnel wall with counter clockwise direction. As the gap between the wingtip and the tunnel decreases, the wingtip vortices move further along the tunnel wall. Both vortices from bothsides of the wing will murge, which will be studied in future using a viscous computation.

Selection of Optimum Support based on Rock Mass Classification and Monitoring Results at NATM Tunnel in Hard Rock (경암지반 NATM 터널에서 암반분류 및 계측에 의한 최적지보공 선정에 관한 연구)

  • 김영근;장정범;정한중
    • Tunnel and Underground Space
    • /
    • v.6 no.3
    • /
    • pp.197-208
    • /
    • 1996
  • Due to the constraints in pre site-investigation for tunnel, it is essential to redesign the support structures suitable for rock mass conditions such as rock strength, ground water and discontinuity conditions for safe tunnel construction. For the selection of optimum support, it is very important to carry out the rock mass classification and in-situ measurement in tunnelling. In this paper, in a mountain tunnel designed by NATM in hard rock, the selectable system for optimum support has been studied. The tunnel is situated at Chun-an in Kyungbu highspeed railway line with 2 lanes over a length of 4, 020 m and a diameter of 15 m. The tunnel was constructed by drill & blasting method and long bench cut method, designed five types of standard support patterns according to rock mass conditions. In this tunnel, face mapping based on image processing of tunnel face and rock mass classification by RMR carried out for the quantitative evaluation of the characteristics of rock mass and compared with rock mass classes in design. Also, in-situ measurement of convergence and crown settlement conducted about 30 m interval, assessed the stability of tunnel from the analysis of monitoring data. Through the results of rock mass classification and in-situ measurement in several sections, the design of supports were modified for the safe and economic tunnelling.

  • PDF

Numerical Analysis for Shotcrete Lining at SCL Tunnel in NS2 Transmission Cable Tunnel Project in Singapore (싱가포르 케이블터널 프로젝트 NS2현장 SCL 터널에서의 숏크리트 라이닝의 변형거동 특성)

  • Kwang, Han Fook;Kim, Young Geun
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.185-194
    • /
    • 2017
  • This technical paper is a study on the unique displacements of Shotcrete Lining at the mined tunnel during excavation period through deep consideration with real time data from monitoring instrumentations correlation with the numerical analysis to identify the rock stresses and the rock spring points at the working face of the Conventional tunnelling by the Drill and Blast, based on the geological face mapping results of the project NS2, Transmission cable tunnel project in Singapore. The created geometry of numerical model was prepared to the real mined tunnel construction site including, vertical shaft, construction adit, tunnel junction area, and 2 enlargement caverns. The convergence measurements by the monitoring instrumentation were performed during the tunnel excavation and shaft sinking construction stages to guarantee the safety of complicated underground structures.

Estimation of Final Deformation of Hard Rock Tunnel Using Early Measured Deformation (초기계측치를 이용한 경암 지반내 터널의 최총변위량 예측)

  • 송승곤;양형식;임성식;정소걸
    • Tunnel and Underground Space
    • /
    • v.12 no.2
    • /
    • pp.99-106
    • /
    • 2002
  • To use the early measured data of tunnel deformation in but analysis, the relationship between these values find final deformation data were studied. Panet\`s exponential and fraction equations successfully approximate the convergence of the hard rock tunnels. Measured deformation data of ID location, $U_{1D}$ show that they can be lilted to linear equations but should not be used to estimate potential deformation before measurement, $C_{0}$. Early measured data $U_{1D}$ $U_{2D}$ , and final deformation $ U_{L}$ showed linear correlations. It proved that estimated data of final deformation from early measured ones can be used as input parameters for back analysis.

A Study on Convergency of Tunnel Displacement using Control Chart Method (관리도 기법을 이용한 터널 변위수렴 특성에 관한 연구)

  • Yim, Sung-Bin;Kim, Sung-Kwon;Seo, Yong-Seok;Park, Si-Hyun
    • The Journal of Engineering Geology
    • /
    • v.17 no.2 s.52
    • /
    • pp.197-204
    • /
    • 2007
  • Tunnel deformation happens by excavation. After installation of support, tunnel is gradually stabilized over time. Effect of excavation on tunnel behavior decreases as increase of distance from face. If the time that the displacement converges by tunnel stabilization is estimated, processes after stabilization can be advanced and economic loss can be reduced. In this study, the distance of displacement convergent point from face in the tunnel constructed on sedimentary rock is estimated using control chart method. As the results of analysis using a control of chart, displacements in a sedimentary rock tunnel are converged within 100 m from each tunnel face.

Assessment of time-dependent behaviour of rocks on concrete lining in a large cross-section tunnel

  • Mirzaeiabdolyousefi, Majid;Nikkhah, Majid;Zare, Shokrollah
    • Geomechanics and Engineering
    • /
    • v.29 no.1
    • /
    • pp.41-51
    • /
    • 2022
  • Tunneling in rocks having the time-dependent behavior, causes some difficulties like tunnel convergence and, as a result, pressure on concrete lining; and so instability on this structure. In this paper the time-dependent behaviour of squeezing phenomenon in a large cross section tunnel was investigated as a case study: Alborz tunnel. Then, time-dependent behaviour of Alborz tunnel was evaluated using FLAC2D based on the finite difference numerical method. A Burger-creep viscoelastic model was used in numerical analysis. Using numerical analysis, the long-time effect of squeezing on lining stability was simulated.This study is done for primary lining (for 2 years) and permanent lining (for 100 years), under squeezing situations. The response of lining is discussed base on Thrust Force-Bending Moment and Thrust Force-Shear Force diagrams analysing. The results determined the importance of consideration of time-dependent behaviour of tunnel that structural forces in concrete lining will grow in consider with time pass and after 70 years can cause instability in creepy rock masses section of tunnel. To show the importance of time-dependent behavior consideration of rocks, elastic and Mohr-Coulomb models are evaluated at the end.