• Title/Summary/Keyword: tunnel bottom

Search Result 172, Processing Time 0.025 seconds

Numerical analysis and fluid-solid coupling model test of filling-type fracture water inrush and mud gush

  • Li, Li-Ping;Chen, Di-Yang;Li, Shu-Cai;Shi, Shao-Shuai;Zhang, Ming-Guang;Liu, Hong-Liang
    • Geomechanics and Engineering
    • /
    • v.13 no.6
    • /
    • pp.1011-1025
    • /
    • 2017
  • The geological conditions surrounding the Jijiapo Tunnel of the Three Gorges Fanba Highway project in Hubei Province are very complex. In this paper, a 3-D physical model was carried out to study the evolution process of filling-type fracture water inrush and mud gush based on the conditions of the section located between 16.040 km and 16.042 km of the Jijiapo Tunnel. The 3-D physical model was conducted to clarify the effect of the self-weight of the groundwater level and tunnel excavation during water inrush and mud gush. The results of the displacement, stress and seepage pressure of fracture and surrounding rock in the physical model were analyzed. In the physical model the results of the model test show that the rock displacement suddenly jumped after sustainable growth, rock stress and rock seepage suddenly decreased after continuous growth before water inrushing. Once water inrush occured, internal displacement of filler increased successively from bottom up, stress and seepage pressure of filler droped successively from bottom up, which presented as water inrush and mud gush of filling-type fracture was a evolving process from bottom up. The numerical study was compared with the model test to demonstrate the effectiveness and accuracy of the results of the model test.

The Continuously Underwater Tunnelling Methods by Incremental launching Methods (연속압출공법(ILM)을 이용한 수저(水底)터널공법에 관한 연구)

  • Jung, Byung-Ryul;Ryu, Dong-Hun;Kim, Joon-Mo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.28-41
    • /
    • 2009
  • We know the several construction methods for underwater tunnel, but properly submerged concrete box type tunnel was mostly good structure stability and mostly shot length of tunnels. Submerged box type tunnel was buildup the unit segments in dry dock or ship yard by 10 to 20meters. The submerged box was composed with segments was join each together. It was installing the gate and waterproofing the coupling the front hull of a box. The complete submerged box rise up to the surface water, tow in the submerged box by tugboat, going to the destination of tunnel construction site. Beforehand dredge up soil at the bottom of a underwater, sinking the submerged box, connection together complete submerged box in underwater. The research and development ILM tunneling method is receiving careful study. Biggest weakness in submerged concrete box type tunnel was pressure waterproofing, box to box connecting, complete submerged boxes navigation and installation, after operation the submerged tunnel and management concrete box structure. It was positive evidence in submerged concrete box type tunnel. We make a practical application of the principle "the ILM tunneling method in underwater construction methods."

  • PDF

Estimation of the continuity of inclined pits by tunnel channel wave investigation (터널 채널파를 이용한 사갱 연장성 규명)

  • 김중열;방기문;정현기
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.229-236
    • /
    • 2002
  • In this paper, a new novel technique of seismic survey is introduced to estimate the continuity of inclined pits filled with water, It was assumed that the pits would be connected to an abandoned railway tunnel that might be constructed in the past. Thus, detection of pit end was needed for the design of a new highway tunnel(Yukshimreong tunnel) that was likely to be met with a pit. In the beginning of exploration, no reliable, cost effective method was available. Hence, focus of interest moved toward the high impedance contrast(reflection coefficient k∼0.8) between water and rock. In this special model of sequence rock-water-rock, total reflection occurs and the seismic energy, when it is generated in the pit water, is nearly confined to the pit so that seismic waves can propagate much further within the pit. As a matter of convenience, this is called“tunnel channel wave”. With these considerations in mind, seismic detonator(2g) was used as a source at the entrance of pit, whereas hydrophone chain(hydrophone interval=1m) was placed on the bottom of pit. With this appropriate source-receiver arrangement, desirable down-going and up-going waves could be observed that will help conform the continuity of pits. After about one year, it was ascertained that the inclined pit of interest was just nearby crossed with the newly excavated tunnel, as it was predicted.

  • PDF

Analysis of underground post-tensioned precast concrete box utility tunnel under normal fault displacement

  • Wu, Xiangguo;Nie, Chenhang;Qiu, Faqiang;Zhang, Xuesen;Hong, Li;Lee, Jong-Sub;Kang, Thomas H.K.
    • Computers and Concrete
    • /
    • v.29 no.2
    • /
    • pp.69-79
    • /
    • 2022
  • For long underground box utility tunnels, post-tensioned precast concrete is often used. Between precast tunnel segments, sealed waterproof flexible joints are often specified. Fault displacement can lead to excessive deformation of the joints, which can lead to reduction in waterproofing due to diminished contact pressure between the sealant strip and the tunnel segment. This paper authenticates utilization of a finite element model for a prefabricated tunnel fault-crossing founded on ABAQUS software. In addition, material parameter selection, contact setting and boundary condition are reviewed. Analyzed under normal fault action are: the influence of fault displacement; buried depth; soil friction coefficient, and angle of crossing at the fault plane. In addition, distribution characteristics of the utility tunnel structure for vertical and longitudinal/horizontal relative displacement at segmented interface for the top and bottom slab are analyzed. It is found that the effect of increase in fault displacement on the splice joint deformation is significant, whereas the effects of changes in burial depth, pipe-soil friction coefficient and fault-crossing angle on the overall tunnel and joint deformations were not so significant.

Analysis of pile group behaviour to adjacent tunnelling considering ground reinforcement conditions with assessment of stability of superstructures

  • Young-Jin Jeon;Cheol-Ju Lee
    • Geomechanics and Engineering
    • /
    • v.33 no.5
    • /
    • pp.463-475
    • /
    • 2023
  • Tunnel construction activity, conducted mainly in mountains and within urban centres, causes soil settlement, thus requiring the relevant management of slopes and structures as well as evaluations of risk and stability. Accordingly, in this study we performed a three-dimensional finite element analysis to examine the behaviour of piles and pile cap stability when a tunnel passes near the bottom of the foundation of a pile group connected by a pile cap. We examined the results via numerical analysis considering different conditions for reinforcement of the ground between the tunnel and the pile foundation. The numerical analysis assessed the angular distortion of the pile cap, pile settlement, axial force, shear stress, relative displacement, and volume loss due to tunnel excavation, and pile cap stability was evaluated based on Son and Cording's evaluation criterion for damage to adjacent structures. The pile located closest to the tunnel under the condition of no ground reinforcement exhibited pile head settlement approximately 70% greater than that of the pile located farthest from the tunnel under the condition of greatest ground reinforcement. Additionally, pile head settlement was greatest when the largest volume loss occurred, being approximately 18% greater than pile head settlement under the condition having the smallest volume loss. This paper closely examines the main factors influencing the behaviour of a pile group connected by a pile cap for three ground reinforcement conditions and presents an evaluation of pile cap stability.

Improvement of Magnetic Transport Properties in Bottom-Type Pinning MgO Magnetic Tunnel Junctions with NiFeSiB/CoFeB Hybrid Free Layer (NiFeSiB / CoFeB 하이브리드 자유층을 사용한 자기터널접합구조에서 Bottom-Type Pinnning MgO 터널 배리어 두께변화에 따른 자기 저항비 증진 연구)

  • Kim, Do-Hyeong;Jo, Ji-Ung;Kim, Do-Gyun;Tan, Reasmey;Isogami, Shinji;Tsunoda, Masakiyo;Takahashi, Migaku;Kim, Yeong-Geun
    • Proceedings of the Korean Magnestics Society Conference
    • /
    • 2009.05a
    • /
    • pp.121-122
    • /
    • 2009
  • PDF

굴착 진행과정을 고려한 터널 단면의 점탄성 및 탄소성 응력해석

  • Lee, Yeon-Gyu;Jang, Hyeon-Gon;Lee, Jeong-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.152-165
    • /
    • 1991
  • Elasto-plastic and Visco-elastic sytress analyses were conducted for standard cross-section of subway tunnel in Seoul . Considering the procedure of excavation and reinforcement, excavated region was divided to multiple elements. And the progress of tunnel is simulated to be the removal of a series of layerd elements by means of diminishing the stiffness of the portion progressively. Another method is to be free of stress due to excavation instead of stiffness. In the analysis multiple element method was conducted with ADINA program, the stiffness removal method was adopted . For the same model, stress release method was carried out with Visco-Elastic Analysis program developed in Rock mechanics laboratory, Seoul National University(SNU-VBA) . When upper tunnel excavated, displacements in roof were same for two results, but when bottom tunnel removed completely , displacement changes of rock in the stress release method exhibited very small amount compared with stiffness removal method.

  • PDF

An Experimental Study on the Performance of a Surface Piercing Propeller in Tunnel (수면관통형 터널 프로펠러의 성능해석을 위한 실험적 연구)

  • Jeong, Seong-Wook;Lee, Seung-Hee
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.3 s.147
    • /
    • pp.294-303
    • /
    • 2006
  • A surface piercing propeller (SPP) in tunnel has been proposed recently as a new propulsion system for a high speed air cavity ship. The purpose of the present study is to investigate the characteristics of the SPP in tunnel through a series of model tests. A model propulsion system is placed on a dummy body made of Acrylics. The tunnel is divided into two regions by a guide vane extending from the inlet to the center of the propeller shaft. Air has been supplied from an air nozzle placed at the bottom of the dummy body and the changes in propeller performances caused by the air flow are investigated. The measurements are done for open water and in-tunnel conditions, both for fully and partially submerged propeller. The influence of the guide vane configurations on the propeller performance is also studied. The experiments are performed at the variable pressure circulation water channel of Inha University

The Change of Backlayer Length with the Ventilation Air Velocity in the Tunnel Fire (터널화재에서 환기속도와 backlayer의 길이변화)

  • 김성준;이민규
    • Fire Science and Engineering
    • /
    • v.17 no.3
    • /
    • pp.50-54
    • /
    • 2003
  • The backlayer phenomena of smoke in the road tunnel is evaluated through numerical experiments. A commercial code, PHOENICS is used to simulate smoke flow in the road tunnel. The independent and dependent variables are ventilation air velocity and the length of backlayer of smoke respectively. Hybrid scheme and $textsc{k}-\varepsilon$ turbulence model is adopted in the simulation process and mass residual is used as a convergence criterion. The experimental results say that the length of backlayer is reduced linearly with the increase of ventilating air velocity and that there is a critical air velocity which prevents from the onset of backlayering phenomena. One finds that there is a fresh air region near the bottom of tunnel which could make the passenger escape from the region polluted by smoke. These phenomena come from the severe vertical stratification of the smoke air mixture in the tunnel.

An Experimental Study on the Performance of a Surface Piercing Propeller in Tunnel (수면관통형 터널 프로펠러의 성능해석을 위한 실험적 연구)

  • Jeong, Seong-Wook;Lee, Seung-Hee
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.107-117
    • /
    • 2007
  • A surface piercing propeller (SPP) in tunnel has been proposed recently as a new propulsion system for a high speed air cavity ship. The purpose of the present study is to investigate the characteristics of the SPP in tunnel through a series of model tests. A model propulsion system is placed on a dummy body made of Acrylics. The tunnel is divided into two regions by a guide vane extending from the inlet to the center of the propeller shaft. Air has been supplied from an air nozzle placed at the bottom of the dummy body and the changes in propeller performances caused by the air flow are investigated. The measurements are done for open water and in-tunnel conditions, both for fully and partially submerged propeller. The influence of the guide vane configurations on the propeller performance is also studied. The experiments are performed at the variable pressure circulation water channel of Inha University.

  • PDF