• Title/Summary/Keyword: tunnel bottom

Search Result 172, Processing Time 0.023 seconds

Monitoring Result of Rock Mass Behavior during Excavation of Deep Cavern (대심도 지하 공간 굴착시의 암반거동 - 일본 SUPER KAMIOKANDE의 사례 -)

  • Lee Hong-Gyu
    • Tunnel and Underground Space
    • /
    • v.16 no.1 s.60
    • /
    • pp.11-25
    • /
    • 2006
  • The world's largest nucleon decay experiment facility is constructed at a depth of approximately 1,000 meters, in the Kamio Mine, Japan. The excavated cavern is consisted of a cylinder of 42.4 m high and a semi elliptical dome of 15.2 m high, with a bottom diameter of 40 m. The total excavation volume is approximately $69,000\;m^3$. Because of the character as a large cavern excavation in deep underground, there is many unknown factors in rock mechanics. Based on the results of rock test and numerical analysis, the monitoring of rock mass behavior accompanying progress of construction was performed by various instruments installed in the rock mass surrounding the cavern. The monitoring data was used in the study of measures for cavern stability.

A Study on the Mining Method for Limestone Mines with Less Environmental Hazards (환경오염 저감을 위한 석회석 광산개발방안에 대한 연구)

  • 임한욱;김재동;백환조
    • Tunnel and Underground Space
    • /
    • v.10 no.1
    • /
    • pp.80-91
    • /
    • 2000
  • Open cut mining of limestone is generally considered to be more advantageous than underground mining in recovery, grade control, economics, and safety, but it causes substantial environmental pollutants such as ground vibration, noise, dust. It also changes ground surface and may destroy vegetation. The Halla limestone mine which lies adjacent to Baikdu mountains range is selected for a model study. To reduce environmental hazards, and to conserve original surface and woods, both open cut and underground mining methods must be adopted. In case of sub-level sloping. a unit block of 87m high, 70m wide, and 100∼l20m long is suggested with an estimated overall recovery of 42%. Some suggestions to reduce the environmental hazards are also included. The followings must be considered in determining the degree of fragmentation; the discontinuity conditions in the rock mass and the charge concentration both at the bottom and column of the hole. In addition to adopting a barrier wall for reducing environmental hazards, the probable production from underground mining is also discussed.

  • PDF

Influence of Delay Time and Priming Location on the Blast-Induced Ground Vibration (발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향)

  • Kang, Choo Won;Ryu, Bok Hyun;Choi, Tae Hong
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.97-109
    • /
    • 2014
  • In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

A Study on the Model Test for Mine Filling Using Coal Ash (석탄회를 이용한 갱내충전모형시험 연구)

  • Lee, Sang-Eun;Park, Se-Jun;Kim, Hak-Sung;Jang, Hang-Suk;Kim, Tae-Heok
    • Tunnel and Underground Space
    • /
    • v.22 no.6
    • /
    • pp.449-461
    • /
    • 2012
  • Coal ash generated from thermal power plants is planned to use for mine filling in order to prevent subsidence of the ground. In according, the basic physical properties and flow characteristics were grasped using coal ash from generated Yeongdong thermal power plant, and hydraulic filling experiments were performed a total of eight times by manufacturing the model of 1 inclined shaft in Hanbo coal mine. The specific gravity of coal ash is 2.34, and the result of particle size analysis belongs to silty sand (SM). Coal ash of weight ratio of 60% was used in the filling experiments of the model, since liquefaction have shown in coal ash less than weight ratio of 70% from the result of slump and flow test. The outlet should be located at the bottom of the inclined and vertical shaft, this was favorable way in improving the filling efficiency from the experiment results regardless of groundwater exists.

Damage Contribution Rate Analysis by Accidental Tunnel Explosion at a Multi-layered Room and Pillar Mine (우발적 갱도폭발에 따른 다층 주방식 채광광산 구조요인별 피해 기여도 분석)

  • Ko, Young-Hun;Yang, Hyung-Sik;Kim, Seung-Jun
    • Explosives and Blasting
    • /
    • v.35 no.3
    • /
    • pp.1-8
    • /
    • 2017
  • In this paper, parametric studies are conducted to evaluate the contribute effect of multi layered room and pillar mine structures by underground accidental explosions. Influence of PPV(Peak Particle Velocity) obtained from large explosion at a multi layered room and pillar mine was numerically simulated by using AUTODYN. Parameters for contribution rate Analysis was analyzed by the robust design method. Orthogonal array is $L_9(3^4)$, which was adopted in this study, the parameters were pillar height, pillar width, mine span and sill pillar of 3 levels. Results of analysis showed that bottom mine of vertical direction from explosion point are most affected by pillar height, followed by sill pillar thickness, mine span and pillar width. Parameters affecting adjacent mine of horizontal direction from explosion are in the order of pillar width, mine span, pillar height and sill pillar thickness.

A Case Study of Combining NDC Blasting Method and Wide Space Blasting Method to Increase Blast Efficiency (NDC 및 Wide Space 혼합공법을 통한 발파효율 개선 사례연구)

  • No, Sang-Lim;Noh, Seung-Hwan;Lee, Sang-Pil;Lee, Hoon-Yeon;Lee, Tai-Ro
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.387-393
    • /
    • 2006
  • This paper introduces the combination of two blasting methods applied to reduce blast-vibration and increase blast efficiency. NDC (New Deck Charge) blasting method using air deck effect with separation tube made of paper was effective to reduce blast-vibration, while blast efficiency was decreased a little in the bottom of a blasthole. Wide Space blasting method has an advantage to control the fragmentation and to increase blast efficiency over conventional blasting methods. In this study new blasting method combining NDC blasting method and Wide Space blasting method was applied to the field, it was confirmed to reduce blast-vibration and increase blast efficiency. It is expected to make useful blasting method to cover the public complaints and to shorten construction time by accumulating blasting data using new method with various conditions.

A Study on the Distribution of the Peak Wind Pressure for Rooftop Signboards (건물 옥상에 설치되는 옥상 간판의 피크풍압 분포에 대한 연구)

  • Nam, Byung-Hee;You, Jang-Youl;Lee, Nam-Hun;You, Ki-Pyo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.2
    • /
    • pp.79-86
    • /
    • 2018
  • Unlike other types of outdoor advertisements, rooftop signboards are installed on the roofs of buildings, rather than on their outer walls. This means that the area of a rooftop signboard is commonly larger than that of a general outdoor signboard. Moreover, as such signboards are greatly influenced by the wind, they can suffer a lot of damage from typhoons and strong winds every year. However, there is no wind load specification for rooftop signboards. In this study, wind pressure experiments were conducted to investigate the peak wind pressure on each side of rooftop signboards installed on the roofs of 5-15 story buildings in a city center. The minimum peak wind pressure coefficient was -3.0 at the bottom edges of the front and back of the rooftop signboards and -2.0 along the entire length of the sides. As the height of the rooftop signboard increased with the increasing height of the buildings, the peak value was found to be larger than the absolute peak value for the minimum peak wind pressure coefficient. The maximum and minimum peak wind pressure distributions of the rooftop outdoor signboards were influenced by the position of the signboard and the wind angle.

Development of Extra High Voltage(400kN) Porcelain Insulator for Transmission Lines (765 kV용 400 kN 현수애자 개발)

  • 최인혁;최장현;이동일;최연규
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.52 no.8
    • /
    • pp.348-353
    • /
    • 2003
  • This paper was the research of high voltage suspension insulator (400 [kN]) including pottery stone, feldspar, clay and alumina of 17 [wt%]. The slurry was fabricated after ball milling mixed raw materials. Green compacts were made by the extrusion of jiggering method and were sintered at 1300[$^{\circ}C$] for 50 [min.] in the tunnel kiln. The sintered density was reached to 97% of theoretical density, and the bending strength was 1658 [k $g_{f}$/$\textrm{cm}^2$] and hardness and fracture toughness which was measured by ICL( indentation crack length ) method were 1658 (kgf/$\textrm{cm}^2$) and 27.5 [Gpa], respectively. In measurement of tana and insulation break voltage of 400 (kN) porcelain, tan$\delta$ took some numerical value between 17${\times}$10$_{-3}$ and 61${\times}$10$_{-3}$ and insulation break voltage value was 19.9$\pm$1.4 [㎸/mm]. The test was performed to research whether the shape of pin affect a overvoltage break load or not As a consequence, when a pin was designed a pin diameter 51 [mm] with the bottom form of two-step constructed with straight in the suspension insulator, Insulator showed overvoltage break load 52 [ton] of the highest value and reflected a fine characteristic in aged deterioration test which is one of the accelerated aging test. Also it could be confirmed a fine characteristic through performing the test that electrical property of insulator was established correctly in accordance with IEC 60383-1 standards.s.

A Case Study on Reinforcement Method by Excavation Adjacent to the Subway Tunnel using Numerical Analysis (수치해석을 통한 지하철 구조물 인접 굴착에 따른 보강공법 적용사례연구)

  • Byun, Yo-Seph;Jung, Kyoung-Sik;Chun, Byung-Sik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.9
    • /
    • pp.5-11
    • /
    • 2011
  • Recently, large and deep excavations are increasing. The damage of adjacent structures due to excavation has steadily increased with increasing construction demand. Especially in urban development and poor conditions, the excavation adjacent to the subway structures has caused a lot of problems. This paper was reviewed that the underground excavation and reinforcement of the status process through a case study on the field. And stability analysis through the case study evaluates applicability for reasonable reinforcement method by numerical analysis. As a result, the strata distribution condition of all 16 sites consisted of landfill from the top and distributed in the order of deposits, weathered soils, weak rock from the bottom. Also, when proceeding the excavation adjacent to structures, the location of site and layer conditions have highly effect on the results of the construction. Therefore, this study was applied reinforcement method to protect damage by excavation. Displacement and settlement were within allowable criterion and hence, stability of structure was analyzed as safe.

Estimating and Analyzing the Appropriate Pressing Force of the Rock Cutting Splitting Method (암반 커팅 스플리팅 공법의 적정 압입력 추산을 위한 분석해)

  • Lee, Sang-Min;Kim, Mun-Gyu;Cho, Jung-Woo;Yu, Sang-Hwa
    • Tunnel and Underground Space
    • /
    • v.31 no.6
    • /
    • pp.415-427
    • /
    • 2021
  • This technical report briefly introduced the rock cutting splitting method under development. This method is a method of excavating the rock by splitting the block after the rock cutting process. After designing the cutting geometry of the rock face, the chisel is press-fitted to remove the rock block. At this time, when the cutting block is properly designed, the tensile crack propagates smoothly at the bottom of the rock block. An analytical solution was devised to estimate the indentation force required for splitting rock blocks using fracture toughness mode 1 required for tensile crack growth. The impact force of the hydraulic breaker of the excavator was analyzed, and the grade of the excavator that can be constructed according to the rock block design geometry was analyzed.