• Title/Summary/Keyword: tower cranes

Search Result 55, Processing Time 0.023 seconds

A Study on the Stability of Rope Guying of Tower Cranes. (타워크레인 로프가잉 안정성 검토에 관한 연구)

  • Lee, Won-Suk;Ho, Jong-Kwan;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.247-252
    • /
    • 2009
  • With the increasing use of tower cranes higher than free standing height, the importance of lateral support is also growing. Since the fall of 43 tower cranes hit by the last typhoon 'Mami' in 2003, regulations and concerns about safety of construction equipment have increased and construction laws regarding lateral support have been strengthened. In Korea, where there are many large-scale apartment housing construction works with the development of new towns, Rope Guying is a more economical construction method than Wall Brace which fixes building structure like building wall and slab. The safety of this Rope Guying is not verified and many construction works are still carried out based on the experience of site managers. There has been no case of construction work where frame and measurements are applied. The objective of this study is to examine the safety of Rope Guying method and ensure the effective implementation of equipment and prevention of disasters.

  • PDF

An Analysis of Factors Affecting the Safety of Tower Crane in Construction Site (건설현장 타워크레인의 안전성에 영향을 미치는 요인 분석)

  • Ahn, Sungjin;Kim, Tae-Hui;Kim, Ji-Myong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.44-45
    • /
    • 2019
  • Tower cranes are essential equipments that play a key role in the overall process of large-scale construction projects, as well as high-rise apartments construction projects. Tower cranes hoist various loads near and over people, working in crowded environments, sometimes in overlapping work areas, and often under the constraints of time, budget, and labor. This work system further increases the safety risks of sites with inherently hazardous workplaces. The methodology of this research was based on a comprehensive inquiry of a team of experts, including safety managers and equipment managers of major construction companies and previous literature search. Due to the limited resources available to improve safety and prevent accidents, more attention should be paid to all parties involved in factors that have been evaluated to have a significant impact on site safety due to tower crane operations.

  • PDF

Multi-objective Optimization Model for Tower Crane Layout Planning in Modular Construction (모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발)

  • Yoon, Sungboo;Park, Moonseo;Jung, Minhyuk;Hyun, Hosang;Ahn, Suho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.36-46
    • /
    • 2021
  • With an increasing trend toward high-rise modular construction, the simultaneous use of tower cranes at a modular construction site has recently been observed. Tower crane layout planning (TCLP) has a significant effect on cost, duration, safety and productivity of a project. In a modular construction project, particularly, poor decision about the layout of tower cranes is likely to have negative effects like additional employment of cranes and redesign, which will lead to additional costs and possible delays. It is, therefore, crucial to conduct thorough inspection of field conditions, lifting materials, tower crane capacity to make decisions on the layout of tower cranes. However, several challenges exist in planning for a multi-crane construction site in terms of safety and collaboration, which makes planning with experience and intuition complicated. This paper suggests a multi-objective optimization model for selection of the number of tower cranes, their models and locations, which minimizes cost and conflict. The proposed model contributes to the body of knowledge by showing the feasibility of using multi-objective optimization for TCLP decision-making process with consideration of trade-offs between cost and conflict.

A Quantitative Analysis of Fatal Accidents Related to Cranes Using the FMEA Method (FMEA 기법을 활용한 크레인 관련 중대 재해의 정량적 분석에 관한 연구)

  • Kim, Hong-Hyun;Lee, Ghang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.115-122
    • /
    • 2007
  • As buildings become higher, larger, and more complex, safety issues for construction workers working at such environments become more important. We analyzed 83 critical accident cases reported to the KOSHA(Korea Occupational Safety & Health Agency) for construction cranes by types of cranes and by patterns of accidents and causes. There are more number of accidents related to mobile cranes than that related to tower cranes, but the numbers of dead were similar in both cases. The most dominant cause of crane accidents was "fall of materials". We also analyzed the cases of crane accidents using the FMEA(Failure Mode and Effect Analysis) in order to set up a priority for safety management and also to prioritize research and development items relating tower cranes. In the process, we tried to eliminate subjective indexes such as an expert group survey and use objective and quantitative indexes. As a result, it was found that critical crane accidents occurs most during the "lifting and translating" activity.

Method to Select Tower Cranes Using Augmented Reality in Smart Devices (스마트 기기의 증강현실을 이용한 타워크레인 선정방안)

  • Ryu, Han-Guk;Choi, Heebok;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.407-413
    • /
    • 2014
  • Appropriate selection of lifting equipments for a high-rise building construction project is one of the important factors to the project's success. Proper position of a tower crane on a construction site is so important to be determined by an expert or an experienced construction manager who draws working range of a tower crane and moves it over 2D(dimensional) site layout plan. 3D CAD, BIM, and virtual reality are is used for building design and construction, but it is not usual to use them for temporary facility planning or selection of a tower crane. This study proposes a suitable method to use augmented reality to select proper position of tower cranes. An augmented reality prototype is implemented by Vuforia and Unity 3D on a smart device to verify the practicability of the proposed method. The prototype application installed on a smart device shows several tower cranes on different markers in a real architectural drawing to locate the proper tower crane.

Automation of Tower Cranes based on Optimal Control Method (최적 제어법에 의한 타워크레인의 자동화에 관한 연구)

  • Lee, Jin-Woo;Kim, Sang-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.8 no.4
    • /
    • pp.213-222
    • /
    • 1993
  • This paper is concerned with automation of tower cranes in view of the robust control of tower crane during take-off, load hoisting, load lowering and landing. The model equation of the tower crane is induced by using Lagrange's equation and it is linearized at equillibrium point. The control is realized by adopting the optimal regulator method. The effectiveness is proved through the experimental results for the oscillation control of cargo rope and the position controls of trolley and boom by the implementation of digital control using 16 bits microcomputer for the designed optimal control law.

  • PDF

Development of Expert System for Tower Cranes

  • Kim, Ki-sung;Kang, Dong-gil;Hong, Ki-sup
    • Journal of Ship and Ocean Technology
    • /
    • v.3 no.2
    • /
    • pp.27-48
    • /
    • 1999
  • The paper is concerned with application to develop the expert system, which structural analysis and design process for tower cranes. The system is organized into three groups. One is pre-processor for creating input data files, another is `model former' which combines knowledge-base with inference engine for automatic generating structural analysis models, a third is application group for final analysis checks. In this study, geometric subroutine of `model former' designates node positions, nodes, elements numbers and element types. Load data subroutine computes weight of tower crane and device, slewing force, cargo load, wind force form rules or equations in knowledge-base. Also, Property and boundary subroutine applies element properties and boundary conditions to suitable elements and nodes. Design and analysis expert system for tower crane integrates these subroutine, `model former' and pre-processor. RBR(Rule-Base Reasoning) was adopted for a reasoning strategy of this expert system. And this expert system can produce structural analysis model and data, which can be used in ordinary structural analysis program (SAP, ADINA or NASTRAN, etc.). In this paper, this expert system produces format of the analysis model data, which are used in MSC/NASTRAN. The main discussions included in the paper are introduction of the tower crane and structural analysis, composition of the design expert system for tower crane and structural analysis using the expert system.

  • PDF

Tower Crane Foundation Design and Stability Review Model (타워크레인 기초설계 및 안정성 검토 모델)

  • Ho, Jong-Kwan;Han, Kap-Kyu;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.6
    • /
    • pp.99-106
    • /
    • 2007
  • Tower crane is a large construction equipment which is extremely tall for its section when it is erected, with its high slenderness ratio, and it has a heavy load by itself due to large lifting stuff to handle. In line with the construction projects in these days which increasingly tend to become higher, larger and complex, the stuff and height subject to lifting are also getting larger and higher, which has also increased the risk of disastrous accidents. A stable foundation design thus to deal with the increasing self load becomes more important. When a typhoon Maemi swept the nation in 2003, as many as 43 tower cranes fell down or collapsed, causing a severe damage to the people and the properties. Considering such fatal damages, a technical evaluation of the stability to prevent the safety accident with the tower crane must be very crucial. Tower cranes operation in domestic construction sites, in fact, have been simply dependent on personal experience and intuition of the engineers. Particularly when it comes to the foundation design, it mostly depends on manufacturer's recommendation. The study hence was intended to develop the fundamental measures for granting the objective stability, instead of following the individual's experience only. The simulation model recommended in the study is expected to make a good commitment to achieving an effective lifting work as well as preventing the safety accident.

Wind-induced vibration fragility of outer-attached tower crane to super-tall buildings: A case study

  • Lu, Yi;Zhang, Luo;He, Zheng;Feng, Fan;Pan, Feng
    • Wind and Structures
    • /
    • v.32 no.5
    • /
    • pp.405-421
    • /
    • 2021
  • To gain insight into the wind-induced safety concerns associated with attached tower cranes during the construction of super-tall buildings, a 606 m level frame-core tube super-tall building is selected to investigate the wind-induced vibration response and fragility of an outer-attached tower crane at all stages of construction. The wind velocity time history samples are artificially generated and used to perform dynamic response analyses of the crane to observe the effects of wind velocity and wind direction under its working and non-working resting state. The adverse effects of the relative displacement response at different connection supports are also identified. The wind-resistant fragility curves of the crane are obtained by introducing the concept of incremental dynamic analysis. The results from the investigation indicate that a large relative displacement between the supports can substantially amplify the response of the crane at high levels. Such an effect becomes more serious when the lifting arm is perpendicular to the plane of the connection supports. The flexibility of super-tall buildings should be considered in the design of outer-attached tower cranes, especially for anchorage systems. Fragility analysis can be used to specify the maximum appropriate height of the tower crane for each performance level.

Models for Predicting Hoisting Times of Tower Crane in the High-rise Building Construction (고층건축공사 타워크레인 양중시간 예측모델)

  • Lee Jong-Ryou;Jeon Yong-Seok;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.472-475
    • /
    • 2004
  • The objective of this study is to develope reasonably accurate prediction models to assess hoisting times of tower cranes in the high-rise building construction. The efficient use of the tower crane is critical to achieving the Planned floor cycle time. This research describes the derivation of mathematical models to predict the hoisting times in using a tower crane. 28 factors such as nature of load, characteristics of tower cranes, hoisting movements, operation of cranes, weather conditions and so on is considered to influence hoisting times. In order to develop the predicting hoisting times Correctly, it is divided hoisting upward and downward. Then multiple regression models for predicting supply and return hoisting times have been built up separately.

  • PDF