Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.138-145
/
2004
The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.
Journal of Construction Engineering and Project Management
/
v.4
no.3
/
pp.33-46
/
2014
Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.
Applicability of constructing piled raft foundations on soft clay has been given attention in recent years. Lack of sufficient stiffness for soil and thus excessive settlements to allow higher contribution of piles is the major concern in this regard. This paper presents a numerical investigation of performance of piled-raft foundations on soft clay with focusing on a case study. A 3D FEM numerical model is developed using ABAQUS. The model was calibrated by comparing physical and numerical modeling results of other researchers. Then the possibility of using piled-raft system in construction of foundation for a water storage tank in Sarbandar, Iran is assessed. Soil strength parameters in the numerical model were calibrated using the instrumentation data of a heavily instrumented preloading project at the construction site. The results indicate that choosing the proper combination of length and spacing for piles can lead to acceptable differential and total settlements while a high percentage of total bearing capacity of piles can be mobilized, which is an efficient solution for the project. Overall, the construction of piled-rafts on soft clays is promising as long as the total settlement of the structure is not imposing restrictions such as the common 25 mm allowable settlement. But instead, if higher allowable settlements are adopted, for example in the case of rigid steel tanks, the method shall be applicable with considerable cost savings.
Korean Journal of Construction Engineering and Management
/
v.15
no.1
/
pp.11-19
/
2014
The Construction industry is a labor-intensive industry that its labor cost takes up about 30~40% out of the whole construction cost. However, due to a stereotype that on-site work is a 3D job there is a shortage of the labor forces. Modular construction method is to produce modular units in the plant so that workers could work stably. Also, after delivering the module from plant to the site, there will be only installment to be required that shortens construction duration. Even though the modular market is currently expanding based on military facilities in Korea, its best strengths are not demonstrated well which are shortened construction period and low cost. It also causes labor problem of production due to minimum utilization of the modular construction method. Multi-skilled labor means a technician that is able to perform more than two kinds of work with more than two techniques. Multi-skilled labor can proceed smoothly by figuring out the connectivity between the precedent and following operations. Therefore, this research is to apply the concept of Multi-skilled labors, suggest solutions and allocate manpowers efficiently. As a result, it helps to decrease idle manpowers during the operation and the total labor forces can be saved. Low cost is the original strength of the modular which can stand out so the modular market is expected to expand.
Journal of the Architectural Institute of Korea Planning & Design
/
v.35
no.11
/
pp.53-60
/
2019
Multi-unit house, multi-household house, row house and apartments with less than 500 households were included in the list of anti-crime for buildings following the revision of the "notice of crime prevention building standards" on July 31, 2019. Strengthening the performance of crime prevention buildings is inevitable to increase the cost of building construction, including installation of preventive facilities and use of facilities that have secured performance. Thus an economic analysis on the costs and expected benefits of implementing the standards is required for social consensus. Economic analysis is divided into cost analysis and benefit analysis. This study aims to perform an economic analysis on the installation of crime prevention facilities in the buildings subject to expanded crime prevention obligations. Cost analysis is calculated as the sum of the cost of installation and the price of the crime prevention facilities installed for each target residential building. Benefit analysis is calculated as the social cost of targeted crimes that are expected to decrease due to the installation of crime prevention facilities. Economic analysis shows that the total cost of installing crime prevention facilities in residential buildings is estimated at 107.31 billion won per year, while the total benefit from enhanced crime prevention performance is estimated at 9.38 billion won per year. Considering inflation, benefits are expected to outpace costs in the 28th year since the system was implemented.
Proceedings of the Korean Institute of Building Construction Conference
/
2014.05a
/
pp.26-27
/
2014
Sustainable development has become a growing concern throughout the world. Construction industry also has participated in the efforts to minimize the environmental impacts. In Korea, the government has already established the green construction certification(G-seed) and guidelines for sustainable construction. However, domestic guidelines are focused on the design and construction phase, not on the construction project. In addition, it is difficult to find instructions due to the complex structure based on the work unit. Therefore this study aims to deduct the component structure for sustainable construction guidelines in the planning, design and construction phases by utilizing the Factor Analysis. Following the literature review, a total of 26 criteria were identified. Further, a survey was conducted to capture the perceptions on the importance of the criteria. According to the factor analysis, the criteria can be grouped into 8 factors : Environmental factors management, Management planning, Cost and Design management, Energy management, Material management, Certification and regulation management, General Management and Others.
NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
The Journal of Asian Finance, Economics and Business
/
v.7
no.8
/
pp.197-204
/
2020
Nowadays, many construction engineering and technology enterprises are evolving to find that prosperity is driven and inspired by an open economy with dynamic markets and fierce multifaceted competition. Besides brand and product uniqueness, the ability to quickly provide customers with quotes are matters of concern. Such a requirement for prompt cost estimation of construction investment projects with the use of a construction price index poses a significant challenge to contractors. This is because the nature of the construction industry is shaped by changes in domestic and foreign economic factors, socio-financial issues, and is under the influence of various micro and macro factors. This paper presents a fuzzy decision-making approach for calculating critical factors that affect the construction price index. A qualitative approach was implemented based on in-depth interviews of experts in the construction industry in Vietnam. A synthetic comparison matrix was calculated using Buckley approach. The CoA approach was applied to defuzzified the fuzzy weights of factors that affect the construction price index. The research results show that the top five critical factors affecting the construction price index in Vietnam are (1) consumer price index, (2) gross domestic product, (3) basic interest rate, (4) foreign exchange rate, and (5) total export and import.
Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.
Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.
Ha, Gak-Hyeon;Suh, Yong-Pyo;Kim, Man-Won;Kim, Sung-Choon;Park, Sun-Eung
Journal of Energy Engineering
/
v.21
no.3
/
pp.292-300
/
2012
KHNP CRI has been developing APR+ nuclear power plant since 2007, which is GEN III+ model with 4,361 MWth capacity. To develop safer and more economical nuclear power plant than APR1400, we studied domestic and foreign nuclear power plants under construction. We also reviewed nuclear power plants which are appropriate for domestic construction in Korea and also for export. Economic assessments were made twice during the second phase of standard detailed design of the plant. The result of the second phase of economic analysis for APR+ standard detailed design showed that APR+ N-th plant was 24.6% more economical than coal-fired 1,000MW power plant, and was evaluated to be competitive enough in global market for construction of the nuclear power plant.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.