The Estimation of Construction Duration for High School Buildings Based on the Actual Data (실적자료에 의한 고등학교 시설 공기산정)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.138-145
    • /
    • 2004
  • The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

Evaluation of performance of piled-raft foundations on soft clay: A case study

  • Khanmohammadi, Mohammadreza;Fakharian, Kazem
    • Geomechanics and Engineering
    • /
    • v.14 no.1
    • /
    • pp.43-50
    • /
    • 2018
  • Applicability of constructing piled raft foundations on soft clay has been given attention in recent years. Lack of sufficient stiffness for soil and thus excessive settlements to allow higher contribution of piles is the major concern in this regard. This paper presents a numerical investigation of performance of piled-raft foundations on soft clay with focusing on a case study. A 3D FEM numerical model is developed using ABAQUS. The model was calibrated by comparing physical and numerical modeling results of other researchers. Then the possibility of using piled-raft system in construction of foundation for a water storage tank in Sarbandar, Iran is assessed. Soil strength parameters in the numerical model were calibrated using the instrumentation data of a heavily instrumented preloading project at the construction site. The results indicate that choosing the proper combination of length and spacing for piles can lead to acceptable differential and total settlements while a high percentage of total bearing capacity of piles can be mobilized, which is an efficient solution for the project. Overall, the construction of piled-rafts on soft clays is promising as long as the total settlement of the structure is not imposing restrictions such as the common 25 mm allowable settlement. But instead, if higher allowable settlements are adopted, for example in the case of rigid steel tanks, the method shall be applicable with considerable cost savings.

Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit (모듈러 경제성 확보를 위한 공장생산 프로세스의 다기능공 적용 방안)

  • Kim, Hakcheol;Hwang, Youngkyu;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.11-19
    • /
    • 2014
  • The Construction industry is a labor-intensive industry that its labor cost takes up about 30~40% out of the whole construction cost. However, due to a stereotype that on-site work is a 3D job there is a shortage of the labor forces. Modular construction method is to produce modular units in the plant so that workers could work stably. Also, after delivering the module from plant to the site, there will be only installment to be required that shortens construction duration. Even though the modular market is currently expanding based on military facilities in Korea, its best strengths are not demonstrated well which are shortened construction period and low cost. It also causes labor problem of production due to minimum utilization of the modular construction method. Multi-skilled labor means a technician that is able to perform more than two kinds of work with more than two techniques. Multi-skilled labor can proceed smoothly by figuring out the connectivity between the precedent and following operations. Therefore, this research is to apply the concept of Multi-skilled labors, suggest solutions and allocate manpowers efficiently. As a result, it helps to decrease idle manpowers during the operation and the total labor forces can be saved. Low cost is the original strength of the modular which can stand out so the modular market is expected to expand.

An Economic Analysis by Applying Extended Crime Prevention Standards for Buildings (건축물 범죄예방 기준 확대적용에 따른 경제성 분석)

  • Hyeon, Tae-Hwan;Cho, Young-Jin
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.11
    • /
    • pp.53-60
    • /
    • 2019
  • Multi-unit house, multi-household house, row house and apartments with less than 500 households were included in the list of anti-crime for buildings following the revision of the "notice of crime prevention building standards" on July 31, 2019. Strengthening the performance of crime prevention buildings is inevitable to increase the cost of building construction, including installation of preventive facilities and use of facilities that have secured performance. Thus an economic analysis on the costs and expected benefits of implementing the standards is required for social consensus. Economic analysis is divided into cost analysis and benefit analysis. This study aims to perform an economic analysis on the installation of crime prevention facilities in the buildings subject to expanded crime prevention obligations. Cost analysis is calculated as the sum of the cost of installation and the price of the crime prevention facilities installed for each target residential building. Benefit analysis is calculated as the social cost of targeted crimes that are expected to decrease due to the installation of crime prevention facilities. Economic analysis shows that the total cost of installing crime prevention facilities in residential buildings is estimated at 107.31 billion won per year, while the total benefit from enhanced crime prevention performance is estimated at 9.38 billion won per year. Considering inflation, benefits are expected to outpace costs in the 28th year since the system was implemented.

The Guideline structure for improving sustainability in building construction projects (건축 프로젝트의 친환경성 제고를 위한 사업관리 가이드라인 구성 체계 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.26-27
    • /
    • 2014
  • Sustainable development has become a growing concern throughout the world. Construction industry also has participated in the efforts to minimize the environmental impacts. In Korea, the government has already established the green construction certification(G-seed) and guidelines for sustainable construction. However, domestic guidelines are focused on the design and construction phase, not on the construction project. In addition, it is difficult to find instructions due to the complex structure based on the work unit. Therefore this study aims to deduct the component structure for sustainable construction guidelines in the planning, design and construction phases by utilizing the Factor Analysis. Following the literature review, a total of 26 criteria were identified. Further, a survey was conducted to capture the perceptions on the importance of the criteria. According to the factor analysis, the criteria can be grouped into 8 factors : Environmental factors management, Management planning, Cost and Design management, Energy management, Material management, Certification and regulation management, General Management and Others.

  • PDF

Critical Factors Affecting Construction Price Index: An Integrated Fuzzy Logic and Analytical Hierarchy Process

  • NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.197-204
    • /
    • 2020
  • Nowadays, many construction engineering and technology enterprises are evolving to find that prosperity is driven and inspired by an open economy with dynamic markets and fierce multifaceted competition. Besides brand and product uniqueness, the ability to quickly provide customers with quotes are matters of concern. Such a requirement for prompt cost estimation of construction investment projects with the use of a construction price index poses a significant challenge to contractors. This is because the nature of the construction industry is shaped by changes in domestic and foreign economic factors, socio-financial issues, and is under the influence of various micro and macro factors. This paper presents a fuzzy decision-making approach for calculating critical factors that affect the construction price index. A qualitative approach was implemented based on in-depth interviews of experts in the construction industry in Vietnam. A synthetic comparison matrix was calculated using Buckley approach. The CoA approach was applied to defuzzified the fuzzy weights of factors that affect the construction price index. The research results show that the top five critical factors affecting the construction price index in Vietnam are (1) consumer price index, (2) gross domestic product, (3) basic interest rate, (4) foreign exchange rate, and (5) total export and import.

Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry (건설업 산업안전보건관리비 사용 실태조사 및 분석)

  • Sung-Yun Kang;Oh-Se Wook;Kim-Chang Won;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

Appropriate Rate for Estimating Safety Management Cost in Civil Work (토목공사 안전관리비 적정요율 산정)

  • Son, Ki-Sang;Lee, Gi-Tae;Park, Jong-Keun;Park, Jung-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.73-84
    • /
    • 2006
  • Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

An Economic Assessment for APR+ Standard Detailed Design Developing Phase (APR+ 표준상세설계 개발단계에서의 경제성 평가)

  • Ha, Gak-Hyeon;Suh, Yong-Pyo;Kim, Man-Won;Kim, Sung-Choon;Park, Sun-Eung
    • Journal of Energy Engineering
    • /
    • v.21 no.3
    • /
    • pp.292-300
    • /
    • 2012
  • KHNP CRI has been developing APR+ nuclear power plant since 2007, which is GEN III+ model with 4,361 MWth capacity. To develop safer and more economical nuclear power plant than APR1400, we studied domestic and foreign nuclear power plants under construction. We also reviewed nuclear power plants which are appropriate for domestic construction in Korea and also for export. Economic assessments were made twice during the second phase of standard detailed design of the plant. The result of the second phase of economic analysis for APR+ standard detailed design showed that APR+ N-th plant was 24.6% more economical than coal-fired 1,000MW power plant, and was evaluated to be competitive enough in global market for construction of the nuclear power plant.