공정 및 공사비는 건설사업관리에 있어서 가장 중요한 정보들로써, 건설사업관리는 이들 정보를 얼마나 효율적으로 관리하는지에 달려 있다. 국내에서는 아직 체계적인 공정관리가 정착되지 못하였으며, 공사비와의 연계관리 또한 정보의 연계성 부족과 많은 노력의 필요로 인하여 실용성이 부족한 형편이다. 본 연구에서는 공정, 공사비 정보의 연계관리를 위하여, 도로공사를 대상으로 사업초기단계부터 공통작업분류체계를 기준으로 디지털수량산출정보(QDB)를 작성하는 방안과 이를 기반으로 하는 디지털 수량산출정보시스템(QDBS)을 제안하고자 한다.
In developing total hospital information system, large amount of time and expense are to be spent while its results are likely to lead itself to end-users' dissatisfaction. Some of the main complaints on the part of end-users come from insufficient consideration of end-users environment as well as inappropriate representation of their requirement in the system alalysis and design. This papre addresses some advantages of Essential Logical Modeling Process for better analysis and design, explaining by example the developmental process of the Patent Management and Accounting System for a tertiary care hospital. In the case, the Essential Model, suggested by McMenamin and Palmer, proved to be an effective tool for clear separation of analysis and design phase and for better communication among system developers and with end-users. The modeling process itself contributed to better program modularity as well, shown in a Structured Chart. Difficulties in learning how to identify' essential activities' for the modeling practice were experienced in the beginnins stage, which were, however, overcome by elaborating some heuristic guideling and by rdferring to necessary tools including State Transition Diagram, Control Flow Diagram, and so many. While full evaluation of the Essential Model usag remains to wait till the completion of the case project, its strengt in making clear distinction between analysis and design phase was enough to be attractive to system analysts. The model concepts are open to many further application fields, particularly such areas as business re engineering, process remodeling, office automation, and organizational restructuring.
The objective of this paper is to seek an alternative to figure out appropriate ways since difficulties lie in the introduction of LRT system to be operated by governments and self-governing local governments in the country. This situation can act as a main cause of breakdown in domestic railway industry by deepening of outflow of national wealth and technological dependency. Policy makers are required to get awareness of justification and necessity of Project management such as project strategy, goals, operating budgets, risks, investment revenue prior to preparing the outline of the introduction of LRT system shall consider securing budget in light of performance, reliability, and safety withe the help of system engineering activities during the entire project cycle such as design, construction, quality management, and commissioning before mapping out the basic plans for LRT project. In view of the current domestic conditions, the first time within the country, Seoulmetro is training professional as trust education of specialist training about LRT system, SE and PM education. This study leads to participating in PM/SE business by human power who finished from education of domestic specialist for LRT introduction corporation and businesses, it is published for introduction of specialist education and business revitalization.
The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1396-1403
/
2009
The Ministry of Construction and Transportation (MOCT) has been constructing a nationwide soil information DB since 2000, as basic data for the construction of 'underground geographical information,' a project under the 2nd National Geo-spatial Information System (NGIS) master plan. The inputted soil information includes not only underground conditions such as the layer depth, type, color, and groundwater level, but also engineering information that can be applied to construction work design, such as on the standard penetration test and the compression test. It is difficult to use this information in soil analysis and design, however, because only the test results are currently available. A web-based geo-spatial information system was developed in this study to facilitate the effective application of the soil information database (DB). First, the space information, layer information, and engineering test information were loaded from the soil information DB in real time, and the earth volume, bearing capacity, and settlement were calculated to develop a web client that will evaluate the ground softness and liquefaction. It seems that the soil information DB can be actively applied to the planning and design of construction works using this system.
The 5th International Conference on Construction Engineering and Project Management
/
pp.252-259
/
2013
Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.
Railway fields are complicatedly connected with engineering such as physics, civil engineering, architecture engineering, electrical engineering (Telecommunication, signal, catenary, system), machine engineering and performance phase of project in domestic railway can be divided with four steps : planning, design, supervision, construction. Value Engineering is needed to reduce the cost of long period construction duration and periodically maintenance. Currently, railway design is difficult to act optimum design due to limited time, short of manpower, downsized of design company. therefore, VE concept in Design must require In order to solve this problem. it is called Design Management. This paper presents both item of design management and total design management tool of practical aspects, and describes LCC (Life Cycle Cost) analyze process and accomplishment process for applying VE concept
Today, offshore design field is concerned with system integration such as CIM(Computer Integrated Manufacturing), PDMS(Product Data Management System) and EDMS(Engineering Data Management System) in order to cope with the change of engineering specification as owner's requirements during construction stage of the project. This paper deals with the case study that describes about the efficient interface between material control system and 3D CAD system to support the design process in offshore industry using design rules involved the designer's knowledge. In this paper, we constructed an information system, called knowledge-based CAD interface systems, which is composed material code management system and 3D specification generator which automatically creates 3D catalogue anti specification by linking the material code, called short code, and the specification components of the 3D CAD system. As a result of the construction, it is possible to maintain consistency of the design process, and through reduction of the design processing time and improvement of the design process, competitiveness is improved.
Hong, Jong Hyun;Yeom, Dong Jun;Seo, Jung Hoon;Kim, Young Suk
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.708-709
/
2015
In Korea, a series of noise-reduced aluminum forms are being recently used in apartment housing construction. However, their complicated and time-consuming work processes, and the noise which is still generated due to the inherent property of aluminum when especially installing and dismantling them are have been pointed out as a problem to be certainly solved for increasing their practical use in construction sites. The primary objectives of this study are to propose a conceptual design of a newly designed noise-reduced aluminum form in which the noise can be enormously decreased during form works. The conceptual design in this study improved problems of conventional system aluminum forms, and, later, a system aluminum form developed based on this conceptual design will be able to ensure noise-reduction and safety as well as excellent applicability.
서해안의 해안선 일부에서는 1991년부터 현재까지 세계최대의 간척사업이 새만금(아리울)이란 이름으로 지속적으로 개발되어지고 있다. 이러한 새만금 간척사업에는 땅을 높이기 위한 매립 작업에 대규모 사업비가 사용된다. 개발 중인 새만금의 대규모 사업비를 줄이기 위해 매립 간척에 대한 여러 방법들이 연구되어지고 있다. 광범위한 범위의 매립 작업에 현장에서 실시간으로 모니터링 하고 적용하기 위해 모바일 시스템과 연계한 연구들도 진행되고 있다. 본 논문에서는 매립 작업에 효율적인 사업비 절감을 위한 공법을 이용하여 새만금에 적용하는 모바일 관리 시스템을 모바일 인터페이스 모듈과 데이터를 전송 및 저장하는 모듈인 데이터 서버 모듈 그리고 입력된 데이터를 분석하여 결과를 도출하는 분석 서버 모듈로 나누어 개발한다. 또한 UML을 활용하여 사용자 및 시스템의 요구사항과 기능들의 상호작용 및 데이터의 흐름을 분석하여 시스템을 설계한다. 새만금 지역의 GIS를 이용하여 모바일 단말기에서 각 현장에 있는 매립 상태 및 관련 속성 정보를 실시간으로 모니터링 할 수 있는 사용자 인터페이스를 구현한다. 모바일을 통한 새만금 기반 지리정보 서비스와 DIPSDRM(Dry Internal Project Site Digging Reclamation Method) 공법 관리 서비스를 제공하며, DIPSDRM 공법 기반 3차원 지리정보 서비스를 제공하는 모바일 관리시스템을 개발한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.