• Title/Summary/Keyword: three dimensional excavation

Search Result 133, Processing Time 0.029 seconds

The Case Study on Application of 3 Dimensional Modeling Method with Geophysical Data (물리탐사 자료에 대한 3차원 지반 모델링 적용 사례 연구)

  • Heo, Seung;Park, Joon-Young;Do, Jung-Lok;Yoo, In-Kol
    • Geophysics and Geophysical Exploration
    • /
    • v.11 no.3
    • /
    • pp.221-229
    • /
    • 2008
  • The three dimensional model method is widely applied in resource development for feasibility study, mine design, excavation planning and process management by constructing the database of various data in 3 dimensional space. Most of geophysical surveys for the purpose of engineering and resource development are performed in 2 dimensional line survey due to the restriction of the field situation, technical or economical situation and so on. The acquired geophysical data are used as the input for the 2 dimensional inversion under the 2 dimensional assumption. But the geophysical data are affected by 3 dimensional space. Therefore in order to reduce the error caused by 2 dimensional assumption, the 2 dimensional inversion result must be interpreted considering the additional information such as 3 dimensional topography, geological structure, borehole survey etc. The applicability and usability of 3 dimensional modeling method are studied by reviewing the case study to the geophysical data acquired in field of engineering and resource development.

Prediction of Preceding Crown Settlement Using Longitudinal Displacement Measured on Tunnel Face in Fault Zone (단층대가 분포하는 터널에서 굴진면 수평변위를 이용한 선행 천단변위 분석)

  • Yun, Hyun-Seok;Do, Kyung-Ryang;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.27 no.1
    • /
    • pp.81-90
    • /
    • 2017
  • Preceding displacements in tunnel are difficult to predict since the measurements of displacements after excavation can not be performed immediately. In the present study, The longitudinal displacements which can be measured immediately after excavation are used to predict the crown settlements occurring before excavation only if fault is located at the tunnel crown. Three-dimensional finite element analysis was conducted using 28 numerical models with various fault attitudes to analyze the correlation between the longitudinal displacements on tunnel face and preceding crown settlements. The results, $L_{face}/C$ ratio show 2~12% in the drives with dip models and 2~13% in the drives against dip models individually. In addition, each model has a certain $L_{face}/C$ ratio. The result of the regression analysis show that the coefficient of determination is over 0.8 in most models. Therefore, crown settlements occurring before excavation can be predicted by analyzing the longitudinal displacements occurring on tunnel faces.

Track Stability Assessment for Deep Excavations in Adjacent to Urban Railways (도시철도 인접지반 깊은 굴착 시 궤도 안정성 평가)

  • Jeon, Sang-Soo;Lee, Sang-Seung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.614-627
    • /
    • 2018
  • Urban railway lines have been constructed adjacent to residential buildings and urban areas. The expansion of transportation networks and reconstruction of residential buildings in highly populated urban areas require deep excavations in areas adjacent to urban railways. Mobilized soil stresses and changes in the groundwater level induced by deep excavations results in track irregularities in urban railways. In this study, a three-dimensional finite difference model using the commercial program FLAC3D was adopted to estimate the horizontal displacements of earth retaining structures, settlements of backfill, the stability of track irregularity and underground box structure based on the criteria of each railway organization and its relationships. In deep excavations, a change in groundwater level induces relatively very small differences for track gauge irregularities, whereas relatively large differences for longitudinal irregularities of 72.5%, twist irregularities of 83.3%, cross level irregularities of 61.9%, and alignments of 43.3% were found to be the maximum differences when the horizontal displacement of earth retaining wall and settlement of backfill were 65.1% and 21.4%, respectively, because the groundwater level (GWL) on the ground surface-mobilized tensile strength of the underground box structure exceeds the allowable value. Therefore, three-dimensional numerical analysis was performed in this study. Overall, real-time monitoring should be carried out to prevent railway accidents in advance when a deep excavation adjacent to urban railway structures is constructed.

Estimation of Safety Zone of Tunnel due to Adjacent Structure (근접구조물에 의한 터널의 안전영역 평가)

  • Hwang, Taikjean
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.6
    • /
    • pp.3052-3060
    • /
    • 2013
  • When planning to construct adjacent structure by the side tunnel, the criteria of safety zone of tunnel have been proposed. There are no specific theoretical basis regarding load conditions and the distance of structure and the geological strata and the conditions of adjacent structure's location, and the conditions applied load. Two and three dimensional numerical analysis preformed to prove the deformation of the ground and structures caused by the tunnel excavation and evaluated the correlation and the suitability of the tunnel's safety zone regarding the location of adjacent structures and the changes in the modulus of deformation. This paper proposed the safety zone's range is getting bigger as the modulus of deformation is higher. Also, it seems that the possible range of construction under constraints in the diagram of revalued safety zone significantly expands as shear failure line appears on the invert extension line below the spring line.

Effects of new construction technology on performance of ultralong steel sheet pile cofferdams under tidal action

  • Li, Ping;Sun, Xinfei;Chen, Junjun;Shi, Jiangwei
    • Geomechanics and Engineering
    • /
    • v.27 no.6
    • /
    • pp.561-571
    • /
    • 2021
  • Cofferdams made of teel sheet piles are commonly utilized as support structures for excavation of sea-crossing bridge foundations. As cofferdams are often subject to tide variation, it is imperative to consider potential effects of tide on stability and serviceability of sheet piles, particularly, ultralong steel sheet piles (USSPs). In this study, a real USSP cofferdam constructed using new construction technology in Nanxi River was reported. The design of key parts of USSP cofferdam in the presence of tidal action was first introduced followed by the description of entire construction technology and associated monitoring results. Subsequently, a three-dimensional finite-element model corresponding to all construction steps was established to back-analyze measured deflection of USSPs. Finally, a series of parametric studies was carried out to investigate effects of tide level, soil parameters, support stiffness and construction sequence on lateral deflection of USSPs. Monitoring results indicate that the maximum deflection during construction occurred near the riverbed. In addition, measured stress of USSPs showed that stability of USSP cofferdam strengthened as construction stages proceeded. Moreover, the numerical back-analysis demonstrated that the USSP cofferdam fulfilled the safety requirements for construction under tidal action. The maximum deflection of USSPs subject to high tide was only 13.57 mm at a depth of -4 m. Sensitivity analyses results showed that the design of USSP cofferdam system must be further improved for construction in cohesionless soils. Furthermore, the 5th strut level before concreting played an indispensable role in controlling lateral deflection of USSPs. It was also observed that pumping out water before concreting base slab could greatly simplify and benefit construction program. On the other hand, the simplification in construction procedures could induce seepage inside the cofferdam, which additionally increased the deflection of USSPs by 10 mm on average.

A study on the interpretations of tunnel convergence function parameters (터널 내공 변위 거동 분석에 관한 연구)

  • Kim, Chang-Yang;Hong, Sung-Wan;Kim, Kwang-Yeom;Baek, Seung-Han
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.3
    • /
    • pp.183-197
    • /
    • 2004
  • The introduction of geodetic methods of absolute displacement monitoring in tunnels has significantly improved the value of the measurements. Structurally controlled behavior and influences of an anisotropic rock mass can be determined, and the excavation and support adjusted accordingly. Three-dimensional finite element simulations of different weakness zone properties, thicknesses, and orientations relative to the tunnel axis were carried out and the function parameters were evaluated from the results. The results were compared to monitoring results from Alpine tunnels in heterogeneous rock. The good qualitative correlation between trends observed on site and numerical results gives hope that by a routine determination of the function parameters during excavation the prediction of rock mass conditions ahead of the tunnel face can be improved. Implementing the rules developed from experience and simulations into the monitoring data evaluation program allows to automatically issuing information on the expected rock mass quality ahead of the tunnel.

  • PDF

Smart monitoring analysis system for tunnels in heterogeneous rock mass

  • Kim, Chang-Yong;Hong, Sung-Wan;Bae, Gyu-Jin;Kim, Kwang-Yeom;Schubert, Wulf
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.255-261
    • /
    • 2003
  • Tunnelling in poor and heterogeneous ground is a difficult task. Even with a good geological investigation, uncertainties with respect to the local rock mass structure will remain. Especially for such conditions, a reliable short-term prediction of the conditions ahead and outside the tunnel profile are of paramount importance for the choice of appropriate excavation and support methods. The information contained in the absolute displacement monitoring data allows a comprehensive evaluation of the displacements and the determination of the behaviour and influence of an anisotropic rock mass. Case histories and with numerical simulations show, that changes in the displacement vector orientation can indicate changing rock mass conditions ahead of the tunnel face (Schubert & Budil 1995, Steindorfer & Schubert 1997). Further research has been conducted to quantify the influence of weak zones on stresses and displacements (Grossauer 2001). Sellner (2000) developed software, which allows predicting displacements (GeoFit$\circledR$). The function parameters describe the time and advance dependent deformation of a tunnel. Routinely applying this method at each measuring section allows determining trends of those parameters. It shows, that the trends of parameter sets indicate changes in the stiffness of the rock mass outside the tunnel in a similar way, as the displacement vector orientation does. Three-dimensional Finite Element simulations of different weakness zone properties, thicknesses, and orientations relative to the tunnel axis were carried out and the function parameters evaluated from the results. The results are compared to monitoring results from alpine tunnels in heterogeneous rock. The good qualitative correlation between trends observed on site and numerical results gives hope that by a routine determination of the function parameters during excavation the prediction of rock mass conditions ahead of the tunnel face can be improved. Implementing the rules developed from experience and simulations into the monitoring data evaluation program allows to automatically issuing information on the expected rock mass quality ahead of the tunnel.

  • PDF

Deformation behavior of tunnels crossing weak zone during excavation - numerical investigation (연약대를 통과하는 터널의 시공중 변위거동 - 수치해석 연구)

  • Yoo, Chungsik;Park, Jung-Gyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.4
    • /
    • pp.373-386
    • /
    • 2014
  • This paper concerns the deformation behavior of tunnels crossing weak zone during excavation. A three dimensional finite element model was adopted in order to conduct a parametric study on the orientation of weaj zone in terms of strike and dip angle relative to the tunnel longitudinal axis. The results of the analyses were then analyzed so that the tunnel displacements in terms of the ratios between the crown settlement and springline displacement can be related to the orientation of the weak zone. The results indicate that the displacement ratios between the tunnel crown and springline tend to quantitatively change when a weak zone exists near or ahead of the tunnel suggesting that the displacement ratios can be effectively used to predict the weak zone during tunnelling. Practical implications of the findings are discussed.

Modeling of a rockburst related to anomalously low friction effects in great depth

  • Zhan, J.W.;Jin, G.X.;Xu, C.S.;Yang, H.Q.;Liu, J.F.;Zhang, X.D.
    • Geomechanics and Engineering
    • /
    • v.29 no.2
    • /
    • pp.113-131
    • /
    • 2022
  • A rockburst is a common disaster in deep-tunnel excavation engineering, especially for high-geostress areas. An anomalously low friction effect is one of the most important inducements of rockbursts. To elucidate the correlation between an anomalously low friction effect and a rockburst, we establish a two-dimensional prediction model that considers the discontinuous structure of a rock mass. The degree of freedom of the rotation angle is introduced, thus the motion equations of the blocks under the influence of a transient disturbing force are acquired according to the interactions of the blocks. Based on the two-dimensional discontinuous block model of deep rock mass, a rockburst prediction model is established, and the initiation process of ultra-low friction rockburst is analyzed. In addition, the intensity of a rockburst, including the location, depth, area, and velocity of ejection fragments, can be determined quantitatively using the proposed prediction model. Then, through a specific example, the effects of geomechanical parameters such as the different principal stress ratios, the material properties, a dip of principal stress on the occurrence form and range of rockburst are analyzed. The results indicate that under dynamic disturbance, stress variation on the structural surface in a deep rock mass may directly give rise to a rockburst. The formation of rockburst is characterized by three stages: the appearance of cracks that result from the tension or compression failure of the deformation block, the transformation of strain energy of rock blocks to kinetic energy, and the ejection of some of the free blocks from the surrounding rock mass. Finally, the two-dimensional rockburst prediction model is applied to the construction drainage tunnel project of Jinping II hydropower station. Through the comparison with the field measured rockburst data and UDEC simulation results, it shows that the model in this paper is in good agreement with the actual working conditions, which verifies the accuracy of the model in this paper.

Environmental Approach to Blasting Effect on the Surrounding Area when the Mine Blasting (광산 발파 시 인근지역에 미치는 발파영향에 대한 환경적 접근)

  • Jeong, Beonghun;Lee, Seungho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.12
    • /
    • pp.5-12
    • /
    • 2015
  • Since blasting noise is impact noise, it will give a sudden shock to the human. In the case, such as the blast vibration, it has given aging buildings and livestock great damage to move the vibration along ground in nearby regions. In this study, the influence of the blasting generated during excavation was analyzed for effects on regional. A couple of field and laboratory surveys about geological were carried out to figure out the geological ratio in the study-performed area. Blast vibration noise was compared to the domestic and abroad case studies and each of the institutions permissible standards established the most appropriate criteria in site condition. The vibration velocity of blasting vibration exploits the values which were measured from test blasting on the ground in order to examine blasting effect. Considering the blasting point as the shortest distance from safety facilities (farms, private houses, etc.), the examination of the influence range, which was derived from the vibration velocity of blasting vibration, was performed to figure out how the point affected the safety facilities. Three-dimensional numerical analysis was performed a time history analysis in order to analyze the behavior of the structure for a dynamic blast load, which was determined in three directions of the blast vibration value. The results of three-dimensional numerical analysis and the blasting effect of blasting vibration estimation equation blasting vibration of impact circle with accompanying test blasting were compared. And the analysis confirmed similar results figures.