A pick cutter is a rock-cutting tool used in partial-face excavation machines such as roadheaders, and its quality is a key element influencing the excavation performance and efficiency of such machines. In this study, pick cutters with hardfacing deposits applied to a tungsten carbide insert were made with aim of increasing their durability and wear resistance. They were field-tested by being installed in a roadheader and compared with conventional pick cutters under the same excavation conditions for 24 hours. The hardfaced pick cutters showed much smaller weight loss after excavation, and therefore better excavation performance, than the conventional pick cutters. In particular, the damage to and detachment (loss) of tungsten carbide inserts was minimal in the hardfaced pick cutters. A detailed inspection using scanning electron microscope-energy dispersive X-ray spectrometry and three-dimensional X-ray computed tomography scanning revealed no macro- or micro-cracks in the pick cutters. The reason for the absence of cracks may be that the heads of pick cutters are mechanically worn after the tungsten carbide inserts have been worn and damaged. However, scanning revealed the presence of voids between tungsten carbide inserts and pick cutter heads. This discovery of voids indicates the need to improve production processes in order to guarantee a higher quality of pick cutters.
본 연구에서는 지반굴착 시 굴착구간 주변의 지하시설물이 지하수 흐름특성에 미치는 영향을 파악하기 위해 지하시설물의 규모와 이격거리, 지하수 동수구배 등을 고려하여 시나리오 기반으로 굴착 단계별 지하시설물의 영향을 지하수 수위 변화와 지하수 유출량 측면에서 비교 분석하였다. 그 결과 지하시설물의 규모가 증가할수록 수두차와 수두구배가 크게 발생하며 이격거리가 짧을수록 큰 수두차와 수두구배를 보인다. 모델영역의 지하수 수두구배에 따른 영향은 비교적 작은 것으로 나타났다. 또한 시나리오에 대한 지하수 유출량 분석 결과 지하시설물의 규모가 증가하거나 이격거리가 짧을수록 지하수 유출량이 감소하는 경향을 보인다. 이는 지반굴착에 따른 지하수 유동특성 분석에 있어 주변에 존재하는 지하시설물에 대한 영향 검토가 필요한 것으로 판단된다.
Jinhuo Zheng;Minglong Shen;Shifang Tu;Zhibo Chen;Xiaodong Ni
Geomechanics and Engineering
/
제36권6호
/
pp.563-573
/
2024
In this study, various countermeasures used to mitigate tunnel deformations due to nearby multi-propped basement excavation in soft clay are explored by three-dimensional numerical analyses. Field measurements are used to calibrate the numerical model and model parameters. Since concrete slabs can constrain soil and retaining wall movements, tunnel movements reach the maximum value when soils are excavated to the formation level of basement. Deformation shapes of an existing tunnel due to adjacent basement excavation are greatly affected by relative position between tunnel and basement. When the tunnel is located above or far below the formation level of basement, it elongates downward-toward or upward-toward the basement, respectively. It is found that tunnel movements concentrate in a triangular zone with a width of 2 He (i.e., final excavation depth) and a depth of 1 D (i.e., tunnel diameter) above or 1 D below the formation level of basement. By increasing retaining wall thickness from 0.4 m to 0.9 m, tunnel movements decrease by up to 56.7%. Moreover, tunnel movements are reduced by up to 80.7% and 61.3%, respectively, when the entire depth and width of soil within basement are reinforced. Installation of isolation wall can greatly reduce tunnel movements due to adjacent basement excavation, especially for tunnel with a shallow burial depth. The effectiveness of isolation wall to reduce tunnel movement is negligible unless the wall reaches the level of tunnel invert.
Lee, Chang Il;Kim, Eun Kyum;Park, Jong Sik;Lee, Yong-Joo
Geomechanics and Engineering
/
제15권5호
/
pp.1061-1070
/
2018
The main purpose of retaining wall methods for deep excavation is to keep the construction site safe from the earth pressure acting on the backfill during the construction period. Currently used retaining wall methods include the common strut method, anchor method, slurry wall method, and raker method. However, these methods have drawbacks such as reduced workspace and intrusion into private property, and thus, efforts are being made to improve them. The most advanced retaining wall method is the prestressed wale system, so far, in which a load corresponding to the earth pressure is applied to the wale by using the tension of a prestressed (PS) strand wire. This system affords advantages such as providing sufficient workspace by lengthening the strut interval and minimizing intrusion into private properties adjacent to the site. However, this system cannot control the tension of the PS strand wire, and thus, it cannot actively cope with changes in the earth pressure due to excavation. This study conducts a preliminary numerical analysis of the field applicability of the controllable prestressed wale system (CPWS) which can adjust the tension of the PS strand wire. For the analysis, back analysis was conducted through two-dimensional (2D) and three-dimensional (3D) numerical analyses based on the field measurement data of the typical strut method, and then, the field applicability of CPWS was examined by comparing the lateral deflection of the wall and adjacent ground surface settlements under the same conditions. In addition, the displacement and settlement of the wall were predicted through numerical analysis while the prestress force of CPWS was varied, and the structural stability was analysed through load tests on model specimens.
굴착 중 slurry로 지대되고 있는 상태에서 지하수와 상재하중의 영향을 고려한 diaphragm wall 의 안정도를 해석하기 위하여 Belt Piaskowski/kowalewski, Washbourne의 모델을 확장하고, 확장된 이론으로 프로그램 SL3D를 개발하였다. Washbourne의 모델에서는 Bell, Piaskowski / Kowalewski의 모델에 비해, 굴착깊이가 증가함에 따라 안정도가 매우 큰 폭으로 증가하고, 비교적 초기굴착단계에서 부터 안전측에 속한다. 또한 slurry의 밀도, 지하수위, 흙의 내부마찰각, trench의 길이,상재단위하중등이 안정도에 미치는 영향을 분석하였고, 이것을 근거로 nomogram을 작성하였다.
암반은 지각을 형성하는 암석의 집합체로서 지질학적인 생성 과정에서 단층, 절리 등의 역학적 불연속면을 포함하고 있다. 이러한 불연속면은 구조상 매우 취약하므로 지하 암반구조물의 안정성을 확보하기 위해서는 불연속면의 특성을 고려한 설계가 필수적이며, NATM터널 시공 시에는 이러한 불연속면을 가능한 빨리 확인하여 굴착공법 및 지보체계의 변경이 조속히 이루어져야 한다. 지하 암반 중에 터널을 굴착하게 되면, 터널 막장면을 포함한 무지보 굴착면 주위에 발생하는 3차원적 응력 전이 현상으로 인하여 막장 전방에 연약대가 존재하거나 파쇄대가 존재하는 경우에 터널의 내공 변위가 특정한 경향을 나타내는 것이 기존 연구 결과로 알려져 있다. 막장 전방의 불연속면 상태에 따른 내공변위 경향을 알아보기 위하여 막장 전방에 존재하는 불연속면의 변형계수, 두께, 방향성 등을 변화시켜가며 3차원 수치해석을 수행하였다. 수치해석 결과에서 다양한 변위성분의 영향선과 경향선의 변화가 실제 측정값들과 비슷하다는 것을 알 수 있었으며 불연속면의 물성, 두께, 방향성에 따라 값의 변화 정도가 달라지는 것으로 나타났다.
This study focuses on a prediction approach of compaction compensation grouting efficiency in sandy soil. Based on Darcy's law, assuming that the grouting volume is equal to the volume of the compressed soil, a two-dimensional calculation model of the compaction compensation grouting efficiency was improved to three-dimensional, which established a dynamic relationship between the radius of the grout body and the grouting time. The effectiveness of this approach was verified by finite element analysis. The calculation results show that the grouting efficiency decreases with time and tends to be stable. Meanwhile, it also indicates that the decrease of grouting efficiency mainly occurs in the process of grouting and will continue to decline in a short time after the completion of grouting. The prediction three-dimensional model proposed in this paper effectively complements the dynamic relationship between grouting compaction radius and grouting time, which can more accurately evaluate the grouting efficiency. It is practically significant to ensure construction safety, control grouting process, and reduce the settlement induced by tunnel excavation.
본 연구에서는 쉴드 TBM 공법의 다양한 세그먼트 모델링 기법에 따른 비교 해석을 통하여 해석기법에 따른 차이를 분석하고 이에 따른 합리적인 모델링 기법을 제안하였다. 또한 암반 이완하중 산정모델에 따른 하중 분석 및 3차원 유한요소해석을 통하여 실제 현장에서 적용 가능한 합리적인 하중산정 방법을 제시하였다. 암반분류에 의한 이완영역의 산정방법은 암반등급이 높은 지반에서는 결과의 차이가 크지 않으나 지반등급이 낮은 지반에서는 그 차이가 매우 크게 나타났으며, 3차원 해석에 의한 이완영역 산정결과 지반등급이 낮은 지반의 이완영역은 각 방법의 중간 정도 범위에 위치할 것으로 예측되었으며 지반등급이 낮은 지반의 세그먼트 계획 시에는 기계식 터널 굴착 특성을 반영한 3차원 해석을 통한 이완영역의 산정을 적극 검토할 필요가 있다.
Tunnel construction activity, conducted mainly in mountains and within urban centres, causes soil settlement, thus requiring the relevant management of slopes and structures as well as evaluations of risk and stability. Accordingly, in this study we performed a three-dimensional finite element analysis to examine the behaviour of piles and pile cap stability when a tunnel passes near the bottom of the foundation of a pile group connected by a pile cap. We examined the results via numerical analysis considering different conditions for reinforcement of the ground between the tunnel and the pile foundation. The numerical analysis assessed the angular distortion of the pile cap, pile settlement, axial force, shear stress, relative displacement, and volume loss due to tunnel excavation, and pile cap stability was evaluated based on Son and Cording's evaluation criterion for damage to adjacent structures. The pile located closest to the tunnel under the condition of no ground reinforcement exhibited pile head settlement approximately 70% greater than that of the pile located farthest from the tunnel under the condition of greatest ground reinforcement. Additionally, pile head settlement was greatest when the largest volume loss occurred, being approximately 18% greater than pile head settlement under the condition having the smallest volume loss. This paper closely examines the main factors influencing the behaviour of a pile group connected by a pile cap for three ground reinforcement conditions and presents an evaluation of pile cap stability.
터널시공 중, 터널자체의 안정성 확보와 주변지반 및 인접 구조물의 안정성 확보를 위한 체계화된 계측관리는 매우 중요한 사항이라고 할 수 있는데, 지반조건이 불리한 도심지 터널공사나 지반조건이 급격하고 빈번하게 변화하는 경우에 있어서는 그 중요성이 더욱 증대되는 것이 사실이다. 최근 오스트리아에서는, 임의 시점에 대한 절대변위를 계측하고 분석하는 기존의 방법 대신, Geodetic을 이용한 각 시공단계별 상대변위의 계측 및 분석방법이 널리 증가하고 있는데, 이를 통해 지반조건의 급격한 변화 예측 및 이에 상응하는 굴착방법과 지보방식의 변경등이 용이해지고 있다. 한편, 지반의 변위는 막장 굴착이 시공되기 이전부터 발행하기 시작하므로 막장 전방의 응력상태는 향후 변위 진행과정에 있어 매우 중요한 요소라 할 수 있다. 즉, 막장 전방의 강성이나 응력상태는 굴착 후의 장기적인 터널안정성 및 인접 구조물의 안정성 확보와 관련된 주요 변수라 할 수 있다. 본 논문에서는 이와 관련된 다양한 조건에 대한 3차원 변위해석을 실시하였으며, 그 결과를 통해 터널 굴착시의 수직변위 및 벡터회전, 막장면 변위 등의 변화를 살펴보았다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.