Journal of the Korean Operations Research and Management Science Society
/
v.32
no.2
/
pp.163-175
/
2007
[ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.
Journal of Korean Society of Industrial and Systems Engineering
/
v.38
no.4
/
pp.64-71
/
2015
In this paper, we present a multi-period 0-1 knapsack problem which has the cardinality constraints. Theoretically, the presented problem can be regarded as an extension of the multi-period 0-1 knapsack problem. In the multi-period 0-1 knapsack problem, there are n jobs to be performed during m periods. Each job has the execution time and its completion gives profit. All the n jobs are partitioned into m periods, and the jobs belong to i-th period may be performed not later than in the i-th period, i = 1, ${\cdots}$, m. The total production time for periods from 1 to i is given by $b_i$ for each i = 1, ${\cdots}$, m, and the objective is to maximize the total profit. In the extended problem, we can select a specified number of jobs from each of periods associated with the corresponding cardinality constraints. As the extended problem is NP-hard, the branch and bound method is preferable to solve it, and therefore it is important to have efficient procedures for solving its linear programming relaxed problem. So we intensively explore the LP relaxed problem and suggest a polynomial time algorithm. We first decompose the LP relaxed problem into m subproblems associated with each cardinality constraints. Then we identify some new properties based on the parametric analysis. Finally by exploiting the special structure of the LP relaxed problem, we develop an efficient algorithm for the LP relaxed problem. The developed algorithm has a worst case computational complexity of order max[$O(n^2logn)$, $O(mn^2)$] where m is the number of periods and n is the total number of jobs. We illustrate a numerical example.
Journal of The Korea Institute of Healthcare Architecture
/
v.28
no.2
/
pp.7-16
/
2022
Purpose: This study aimed to present an analysis model evaluating evacuation performance considering patient types and procedural evacuation in the medical facility. The user group of the medical facility, including users challenged in evacuation behavior, entails the risk of many casualties. Therefore, it is necessary to plan an evacuation procedure that considers the evacuation characteristics of users. Methods: Through the review of precedent studies, the evacuation procedure of the medical facility, the classification of patient types, and the evacuation procedure was set as conditions and variables for the analysis. The result caused by a variety of conditions and variables were explored. Results: 1) The total evacuation completion time and congestion time were shortened at the procedural evacuation. Moreover, it derived many users from evacuating at the initial phase. 2) The proposed model can provide a basis for proposing a space planning direction that considers the possibility of not carrying out the evacuation plan. 3) It supports safe evacuation by identifying variables that reduce overcrowding by comparing the congestion time of overcrowded spaces. 4) The analysis model can identify the overcrowded space through the evacuation route and suggest the basis for architectural improvements that reduce overcrowding. Implications: The study results can be used to analyze the performance of evacuation procedures and support the establishment of evacuation procedures and building plans for safe evacuation for medical facilities.
Journal of the Korean Society of Manufacturing Process Engineers
/
v.18
no.11
/
pp.47-56
/
2019
A deep neural network (DNN) model was proposed to predict the upset in the inertia friction welding process using a database comprising results from a series of FEM analyses. For the database, the upset length, upset beginning time, and upset completion time were extracted from the results of the FEM analyses obtained with various of axial pressure and initial rotational speed. A total of 35 training sets were constructed to train the proposed DNN with 4 hidden layers and 512 neurons in each layer, which can relate the input parameters to the welding results. The mean of the summation of squared error between the predicted results and the true results can be constrained to within 1.0e-4 after the training. Further, the network model was tested with another 10 sets of welding input parameters and results for comparison with FEM. The test showed that the relative error of DNN was within 2.8% for the prediction of upset. The results of DNN application revealed that the model could effectively provide welding results with respect to the exactness and cost for each combination of the welding input parameters.
International conference on construction engineering and project management
/
2007.03a
/
pp.69-78
/
2007
In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.
Journal of Korean Society of Industrial and Systems Engineering
/
v.34
no.4
/
pp.82-88
/
2011
A typical job sequencing problem is studied in this research to improve productivities in manufacturing companies. The problem consists of two-stage parts and assembly processes. Two parts are provided independently each other and then two sequential assembly processes are followed. A new heuristic is developed to solve the new type of sequencing problem. Initial solution is developed in the first stage and then the initial solution is improved in the second stage. In the first stage, a longer part manufacturing time for each job is selected between two, and then a sequence is determined by descending order of the times. This initial sequence is compared with Johnson's sequence obtained from 2-machine assembly times. Any mismatches are tried to switch as one possible alternative and completion time is calculated to determine whether to accept the new sequence or not to replace the current sequence. Searching process stops if no more improvement can be made.
Objectives: This study is to research delay time comparison for later defibrillation after hands off according to the changes in defibrillation electrodes. Study purpose: In defibrillation treatment that is the only way for cardiac arrest by arrhythmia, it is to find defibrillator device which can minimize late defibrillation delay time after important affect of hands off. Study object and method: After hands off according to the defibrillator device, we collected total 40 people for emergency medicine doctor, internal medicine doctor, general surgeon, nurse, emergency medical technician who are working at 2 CN, CS University hospitals in Gwangju Jeollanamdo district to find out hand off shock interval(HOSI). We then researched their general properties like occupation sector, experiences in clinic, gender, completion of AHA ACLS-P training and more. Then 40 participants continued ventricular fibrillation cardiac arrest simulation training (using human-model mannequin) designed by researcher and performed their roles as defibrillation operator. Each of participant used manual paddle and performed 4 times of defibrillation (150J) during 8 minutes of CPR and in 8day, the defibrillator devices were replaced from manual paddle to self-adhesive electrodes pads and 4 times of defibrillation (150J) under same simulation condition as manual paddle were performed. Study result: In comparison for delay time of later defibrillation after hands off of manual paddle and self adhesive electrodes pad, the self adhesive electrodes pad ($7.0{\pm}0.5sec$) seemed to reduce delay time of later defibrillation significantly (p<0.05) compared to manual paddle ($10.0{\pm}0.9sec$). The self adhesive electrodes pad, according to the general properties of participants, had no particular change in delay time after later defibrillation for the statistics (p>0.05) but the manual paddle had statistically significant differences for the occupation sector, experiences in clinic and gender (p<0.05). Conclusion: In defibrillation, the self adhesive electrodes pad($7.0{\pm}0.5sec$) showed short HOSI compared to manual paddle ($10.0{\pm}0.9sec$) significantly (p<0.05) and it applied identically for both existence and non-existence of ACLS-P training completion, experiences in clinic, gender and occupation sector. The manual paddle had also significant difference in experiences in clinic and occupation sector (p<0.05). which means the effect on HOSI according to the job mastery. Therefore, if the clinic experience is short or in case for the occupations without frequent defibrillation treatment has a danger of lowering success rate for the defibrillation using manual paddle. Therefore, it is true that using self adhesive electrodes pad for defibrillation electrodes when performing manual defibrillation in pre-hospital as well as in-hospital steps can generally minimize delay time of later defibrillation after hands off.
The effects of task characteristics on the relative efficiency of visual display dimension were studied using a simulated tele-robotic task. Through a conventional method of task analysis. the tele-robotic task was divided into two categories: the task element requiring focused attention (FA task) and the task element requiring global attention (CA task). Time-ta-completion data were collected for a total of 120 trials involving 10 participants. For the CA task. there was no significant difference between the multiple two-dimensional (20) display and the three-dimensional (3D) monocular display. For the FA task. however. the multiple 20 display was superior to the 3D monocular display. The results suggest that the characteristics of a given task have a considerable effect on the choice of display dimensionality and the multiple 3D display is better for human operators to effectively judge depth if the task requires frequent use of focused attention.
Spin-coated waterborne polyurethane to protect glass surface from environmental attacks was cured by using microwave heating. The effect of microwave heating on the reaction kinetics, chemical durability, and transmittance of polyurethane was investigated. In comparison to the conventional heating the results show that the microwave heating substantially accelerates the curing process of waterborne polyurethane and the total time for the completion of the reaction is only 1/7 of that in the conventional process. The microwave cured sample showed an excellent caustic resistance compared to conventional cured one. It means that microwave heating produces dense structure during curing process. The dense structure does not affect to the transmittance in the visible region.
International conference on construction engineering and project management
/
2009.05a
/
pp.1582-1590
/
2009
In 2006, Korean Government decided to relocate the several Government bodies and public institutes. They include total of 49 central Government agencies, semi-government agencies, and 17 national research institutes. The completion of the relocation program has been set to be final in 2030. The target population for the city plan is set to be 500,000. The goal of MAC is first to complete the first phase of the program by 2014 within the budget. In order to achieve the goal, considerable time has been spent to properly establish the program management system. The success of MAC's Multi-function Program Administration System is too early to determine as it is still in progressive. The success depends on the operations not the development.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.