• Title/Summary/Keyword: the Operation Schedule

Search Result 414, Processing Time 0.02 seconds

Implementation of Highly Integrated Total Energy System (전력수급 종합시스템 현장적용)

  • Park, Si-Woo;Yoon, Yong-Beum;Nam, Jae-Hyun;Choo, Jin-Boo;Choi, Bong-Soo;Lee, Hyo-Sang;Kim, Joon-Hwan;Lyu, Sung-Ho;Han, Seung-Goo;Baek, Woong-Gi
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1525-1525
    • /
    • 1999
  • The main purpose of HITES(Highly Integrated Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The HITES can be utilized to supply a stable electric power and operate KEPCO's power system facilities economically. This system was put into operation in 1999. This paper describes the main feature of the HITES, main functions, numerical methods adopted in this system and network configuration.

  • PDF

Study on Choice Attributes for Low-Cost Carriers Using IPA (저가항공사 선택속성 IPA분석 연구)

  • Park, Young Sik
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.21 no.4
    • /
    • pp.112-118
    • /
    • 2013
  • Air travel demand has recently been growing and establishment and operation of low-cost carriers have been increased. Against this backdrop, low-cost carriers need to figure out diversified customer demand for low-cost carriers and ways to maximize marketing efficiency before applying it to the field so that they can attain superiority to large carriers in increased intensified competition. Low-cost carriers need to be differentiated from other carriers for the purpose of improving profits. Toward this end, this study conducted analysis on importance and satisfaction with carrier choice using IPA with regard to low-cost carrier customers. In conclusion, the paper accurately examined advantages and disadvantages of low-cost carriers compared to general carriers based on results of IPA analysis and suggested managerial strategies to enhance competitiveness based on division into four parts including maintenance and enforcement (1st quadrant, Delay compensation, Booking rapidity, Check rapidity, Crew service, refund service, baggage service, punctuality, transit services, airlines images), concentrated improvement (2nd quadrant, price, Convenience of seat), passive administration (3rd quadrant, Boarding service, cabin cleanliness, flight schedule, whether local crew on board, meal service, in-flight entertainment service), and enhanced satisfaction (4th quadrant, duty-free service, Variety of routes), so that practical suggestions could be presented to employees working in the field.

Appraisal of re-irradiation for the recurrent glioblastoma in the era of MGMT promotor methylation

  • Kim, Il Han
    • Radiation Oncology Journal
    • /
    • v.37 no.1
    • /
    • pp.1-12
    • /
    • 2019
  • Despite recent innovation in treatment techniques and subsequently improved outcomes, the majority of glioblastoma (GBL) have relapses, especially in locoregional areas. Local re-irradiation (re-RT) has been established as a feasible option for recurrent GBL of all ages with safety, tolerability, and effectiveness both in survival and quality of life regardless of fractionation schedule. To keep adverse effects under acceptable range, cumulative dose limit in equivalent dose at 2 Gy fractions by the linear-quadratic model at α/β = 2 for normal brain tissue (EQD2) with narrow margin should be observed and single/hypofractionated re-RT should be undertaken very carefully to recurrent tumor with large volume or adjacent to the brainstem. Promising outcome of re-operation (re-Op) plus re-RT (re-Op/RT) need to be validated and result from re-RT with temozolomide/bevacizumab (TMZ/BV) or new strategy is expected. Development of new-concept prognostic scoring or risk group is required to select patients properly and make use of predictive biomarkers such as O(6)-methylguanine-DNA methyltransferase (MGMT) promotor methylation that influence outcomes of re-RT, re-Op/RT, or re-RT with TMZ/BV.

Existing Building Energy Simulation Method Using Calibrated Model by Energy Audit Data (성능진단 데이터로 보정된 모델을 이용한 기존건축물의 에너지시뮬레이션 기법)

  • Kong, Dong-Seok;Kim, Du-Hwan;Chang, Yong-Sung;Huh, Jung-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.5
    • /
    • pp.231-239
    • /
    • 2014
  • This paper represents a method of existing building energy simulation using energy audit data. Energy audit must be carried out for reasonable analysis, because characteristics of existing buildings such as efficiency of fan, pump, flow rate, pressure, COP and operating schedule could be changed during the building operation. These building characteristics should be measured to estimate actual energy consumption of the existing building. In this study, we conducted energy audit and calculated energy savings for a 7-stories building as a case-study. The energy audit data were used to calibrate the building model of EnergyPlus simulation. Baseline model validated according to M&V guideline index. As a result, building characteristics are significant parameters making a big impact on energy savings in existing buildings.

3D Visualization for Situational Awareness of Air Force Operations (공중작전 상황인식을 위한 3차원 가시화)

  • Kim Seong-Nam;Choi Jong-ln;Kim Chang-Hun;Lim Cheol-Su
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.32 no.6
    • /
    • pp.314-323
    • /
    • 2005
  • This paper proposes a real-time 3D visualization system for situational awareness of Air force operations. This 3D system of situational awareness supports a high-level commander of Air force during the war game operations. These situation aware supporting data such as the aircraft track data of radar, aircraft schedule database, map and satellite image data are integrated into one structured data and those are visualized as 3D structure. By using an Out-of-Core method, we can visualize a 3D huge data in real-time in mobile notebook environment. The experiment shows several examples of 3D visualization supporting situation awareness for Air force operation.

Extraction of Primary Factors Influencing Dam Operation Using Factor Analysis (요인분석 통계기법을 이용한 댐 운영에 대한 영향 요인 추출)

  • Kang, Min-Goo;Jung, Chan-Yong;Lee, Gwang-Man
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.10
    • /
    • pp.769-781
    • /
    • 2007
  • Factor analysis has been usually employed in reducing quantity of data and summarizing information on a system or phenomenon. In this analysis methodology, variables are grouped into several factors by consideration of statistic characteristics, and the results are used for dropping variables which have lower weight than others. In this study, factor analysis was applied for extracting primary factors influencing multi-dam system operation in the Han River basin, where there are two multi-purpose dams such as Soyanggang Dam and Chungju Dam, and water has been supplied by integrating two dams in water use season. In order to fulfill factor analysis, first the variables related to two dams operation were gathered and divided into five groups (Soyanggang Dam: inflow, hydropower product, storage management, storage, and operation results of the past; Chungju Dam: inflow, hydropower product, water demand, storage, and operation results of the past). And then, considering statistic properties, in the gathered variables, some variables were chosen and grouped into five factors; hydrological condition, dam operation of the past, dam operation at normal season, water demand, and downstream dam operation. In order to check the appropriateness and applicability of factors, a multiple regression equation was newly constructed using factors as description variables, and those factors were compared with terms of objective function used in operation water resources optimally in a river basin. Reviewing the results through two check processes, it was revealed that the suggested approach provided satisfactory results. And, it was expected for extracted primary factors to be useful for making dam operation schedule considering the future situation and previous results.

ANALYSIS OF THE TRANSPORTATION LOGISTICS FOR SPENT NUCLEAR FUEL IN KOREA

  • Lee, Hyo-Jik;Ko, Won-Il;Seo, Ki-Seok
    • Nuclear Engineering and Technology
    • /
    • v.42 no.5
    • /
    • pp.582-589
    • /
    • 2010
  • As a part of the back-end fuel cycle, transportation of spent nuclear fuel (SNF) from nuclear power plants (NPPs) to a fuel storage facility is very important in establishing a nuclear fuel cycle. In Korea, the accumulated amount of SNF in the NPP pools is troublesome since the temporary storage facilities at these NPP pools are expected to be full of SNF within ten years. Therefore, Korea cannot help but plan for the construction of an interim storage facility to solve this problem in the near future. Especially, a decision on several factors, such as where the interim storage facility should be located, how many casks a transport ship can carry at a time and how many casks are initially required, affect the configuration of the transportation system. In order to analyze the various possible candidate scenarios, we assumed four cases for the interim storage facility location, three cases for the load capacity that a transport ship can carry and two cases for the total amount of casks used for transportation. First, this study considered the currently accumulated amount of SNF in Korea, and the amount of SNF generated from NPPs until all NPPs are shut down. Then, how much SNF per year must be transported from the NPPs to an interim storage facility was calculated during an assumed transportation period. Second, 24 candidate transportation scenarios were constructed by a combination of the decision factors. To construct viable yearly transportation schedules for the selected 24 scenarios, we created a spreadsheet program named TranScenario, which was developed by using MS EXCEL. TranScenario can help schedulers input shipping routes and allocate transportation casks. Also, TranScenario provides information on the cask distribution in the NPPs and in the interim storage facility automatically, by displaying it in real time according to the shipping routes, cask types and cask numbers that the user generates. Once a yearly transportation schedule is established, TranScenario provides some statistical information, such as the voyage time, the availability of the interim storage facility, the number of transported casks sent from the NPPs, and the number of transported casks received at the interim storage facility. By using this information, users can verify and validate a yearly transportation schedule. In this way, the 24 candidate scenarios could be constructed easily. Finally, these 24 scenarios were compared in terms of their operation cost.

An Iterative Data-Flow Optimal Scheduling Algorithm based on Genetic Algorithm for High-Performance Multiprocessor (고성능 멀티프로세서를 위한 유전 알고리즘 기반의 반복 데이터흐름 최적화 스케줄링 알고리즘)

  • Chang, Jeong-Uk;Lin, Chi-Ho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.115-121
    • /
    • 2015
  • In this paper, we proposed an iterative data-flow optimal scheduling algorithm based on genetic algorithm for high-performance multiprocessor. The basic hardware model can be extended to include detailed features of the multiprocessor architecture. This is illustrated by implementing a hardware model that requires routing the data transfers over a communication network with a limited capacity. The scheduling method consists of three layers. In the top layer a genetic algorithm takes care of the optimization. It generates different permutations of operations, that are passed on to the middle layer. The global scheduling makes the main scheduling decisions based on a permutation of operations. Details of the hardware model are not considered in this layer. This is done in the bottom layer by the black-box scheduling. It completes the scheduling of an operation and ensures that the detailed hardware model is obeyed. Both scheduling method can insert cycles in the schedule to ensure that a valid schedule is always found quickly. In order to test the performance of the scheduling method, the results of benchmark of the five filters show that the scheduling method is able to find good quality schedules in reasonable time.

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

Crew Schedule Optimization by Integrating Integer Programming and Heuristic Search (정수계획법과 휴리스틱 탐색기법의 결합에 의한 승무일정계획의 최적화)

  • Hwang, Jun-Ha;Park, Choon-Hee;Lee, Yong-Hwan;Ryu, Kwang-Ryel
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.8 no.2
    • /
    • pp.195-205
    • /
    • 2002
  • Crew scheduling is the problem of pairing crews with each of the vehicles in operation during a certain period of time. A typical procedure of crew schedule optimization consists of enumerating all possible pairings and then selecting the subset which can cover all the operating vehicles, with the goal of minimizing the number of pairings in the subset. The linear programming approach popularly adopted for optimal selection of pairings, however, is not applicable when the objective function cannot be expressed in a linear form. This paper proposes a method of integrating integer programming and heuristic search to solve difficult crew scheduling problems in which the objective function cannot be expressed in linear form and at the same time the number of crews available is limited. The role of heuristic search is to improve the incomplete solution generated by integer programming through iterative repair. Experimental results show that our method outperforms human experts in terms of both solution quality and execution time when applied to real world crew scheduling Problems which can hardly be solved by traditional methods.