Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 1999.07c
- /
- Pages.1525-1525
- /
- 1999
Implementation of Highly Integrated Total Energy System
전력수급 종합시스템 현장적용
- Park, Si-Woo (Korea Electric Power Research Institute) ;
- Yoon, Yong-Beum (Korea Electric Power Research Institute) ;
- Nam, Jae-Hyun (Korea Electric Power Research Institute) ;
- Choo, Jin-Boo (Korea Electric Power Research Institute) ;
- Choi, Bong-Soo (Korea Electric Power Corporation) ;
- Lee, Hyo-Sang (Korea Electric Power Corporation) ;
- Kim, Joon-Hwan (Korea Electric Power Corporation) ;
- Lyu, Sung-Ho (Korea Electric Power Corporation) ;
- Han, Seung-Goo (Korea Electric Power Corporation) ;
- Baek, Woong-Gi (Korea Electric Power Corporation)
- 박시우 (한전 전력연구원) ;
- 윤용범 (한전 전력연구원) ;
- 남재현 (한전 전력연구원) ;
- 추진부 (한전 전력연구원) ;
- 최봉수 (한국전력공사) ;
- 이효상 (한국전력공사) ;
- 김준환 (한국전력공사) ;
- 류성호 (한국전력공사) ;
- 한승구 (한국전력공사) ;
- 백웅기 (한국전력공사)
- Published : 1999.07.19
Abstract
The main purpose of HITES(Highly Integrated Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The HITES can be utilized to supply a stable electric power and operate KEPCO's power system facilities economically. This system was put into operation in 1999. This paper describes the main feature of the HITES, main functions, numerical methods adopted in this system and network configuration.
Keywords