• Title/Summary/Keyword: the Operation Schedule

Search Result 414, Processing Time 0.024 seconds

Implementation of welding material quantity evaluation system combined with ship design CAD system

  • Ruy, Won Sun;Kim, Ho Kyeong;Cho, Yong Jin;Ko, Dae Eun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.2
    • /
    • pp.219-226
    • /
    • 2017
  • These days, the great part of design processes in the field of ship or offshore manufacturing are planned and implemented using the CAD system customized for shipbuilding companies. It means that all information for design and production could be extracted and reused at the other useful fields which need cost considerable time and efforts. The typical example is the field of welding material quantity evaluation which is demanded during the construction of ship or offshore structures. The proper evaluation of welding material to be used and the usage of them at the stage of schedule planning are mostly important to achieve the seamless process of production and costing in advance. This study is related to the calculation of welding length and needed welding material quantity at the stage of design completion utilizing the customized CAD system. The calculated welding material quantity would be classified according to welding posture, assembly stage, block, bevel and welding type so as to improve the accuracy of total cost evaluation. Moreover it is possible to predict the working time for welding operation and could be used efficiently for the cost management using the results of this research.

Initial Ship Allocation for the Fleet Systematization (선단구성을 위한 초기배선)

  • 이철영;최종화
    • Journal of the Korean Institute of Navigation
    • /
    • v.8 no.1
    • /
    • pp.1-16
    • /
    • 1984
  • The economical property of a shipping enterprise, as well as other transportation industries, is determined by the difference between the freight earned and expense paid. This study can be regarded as a division of optimizing ship allocation to routes under the integrated port transport system. Fleet planning and scheduling require complicated allocations of cargoes to ships and ships to routes in order to optimize the given criterion function for a given forecast period. This paper deals with the optimum ship allocation problem minimizing the operating cost of ships in a shipping company. Optimum fleet operating for a shipping enterprise is very important, since the marine transportation is a form of large quantity transport requiring long-term period, and there is a strong possibility to bring about large amount of loss in operation resulting from a faulty ship allocation. Where there are more than one loading and discharging ports, and a variety of ship's ability in speed, capacity, operating cost etc., and when the amount of commodities to be transported between the ports has been determined, then the ship's schedule minimizing the operating cost while satisfying the transport demand within the predetermined period will be made up. First of all a formula of ship allocation problems will be established and then will be constructed to solve an example by the Integer Programming application after consideration of the ship's ability, supply and demand of commodity, amount of commodity to be transported, operating costs of each ship etc. This study will give good information on deciding intention for a ship oprator or owner to meet the computerization current with shiping management.

  • PDF

A Study on the Characteristics of the Small and Medium System Integration Companies in Performing IT Projects (중.소 SI업체의 IT프로젝트 수행 특성에 관한 연구)

  • Kim, Yong-Kyong
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.15 no.5
    • /
    • pp.273-286
    • /
    • 2010
  • The main purpose of this study was to demonstrate the most common characteristics of the small and medium system integration companies in performing IT projects. In this study, 388 auditing reports on the 194 IT projects which were carried out by the small and medium size manufacturers from 2006 to 2009 were employed and surveyed. This survey revealed that the schedule management was the most neglected item in the project management area, the test planning and action was the most neglected item in the development and coding area, and the manual preparation for users and operators was the most neglected item in the operation and maintenance area. Consequently these three most neglected items were considered as the most common characteristics of the small and medium system integration companies in performing IT projects.

Performance Prediction of a Hot Water Supply and Panel Heating System with Solar Energy (태양열 온수 및 난방 일체형 복합시스템의 성능예측)

  • Han, Yuri;Park, Youn Cheol
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.5
    • /
    • pp.11-17
    • /
    • 2012
  • In this study, a simulation program was developed with heat transfer model in the thermal storage tank for a solar collector and burner combined heating and hot water supply system. Analysis was conducted with variation of operating condition and schedule to analyze performance of a hot water supply and panel heating system with a solar collector and burner combined thermal storage tank. The simulation program is divided two sections. One part is calculation of temperature variation of water which flows through the panel in the floor for heating of the residential house during 24 hours, and the other part is heat transfer calculation for the reaction time to get desired water temperature in the thermal storage tank. As results, light oil consumption and system performance during operation period were analyzed with variation of climate condition and with or without solar collector. Most of the case, oil could be saved about from 24 to 41% with installing the solar collector. The performance of the system is more dependent on radiation time of the solar collector rather than the intensity of the solar radiation which was adopted for the climate analysis.

An Approach to Optimal Dispatch Scheduling Incorporating Transmission Security Constraints

  • Chung, Koo-Hyung;Kang, Dong-Joo;Kim, Balho H.;Kim, Tai-Hoon;Oh, Tae-Kyoo
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.2
    • /
    • pp.199-206
    • /
    • 2008
  • The introduction of competition in electricity markets emphasizes the importance of sufficient transmission capacities to guarantee effective power transactions. Therefore, for the economic and stable electric power system operation, transmission security constrains should be incorporated into the dispatch scheduling problem. With the intent to solve this problem, we decompose a dispatch scheduling problem into a master problem(MP) and several subproblems(SPs) using Benders decomposition. The MP solves a general optimal power flow(OPF) problem while the SPs inspect the feasibility of OPF solution under respective transmission line contingencies. If a dispatch scheduling solution given by the MP violates transmission security constraints, then additional constraints corresponding to the violations are imposed to the MP. Through this iterative process between the MP and SPs, we derive an optimal dispatch schedule incorporating the post-contingency corrective rescheduling. In addition, we consider interruptible loads as active control variables since the interruptible loads can participate as generators in competitive electricity markets. Numerical examples demonstrate the efficiency of the proposed algorithm.

Design of Water Resource Planning System Utilizing Special Features in Mathematical Programming Data Structure (수리계획 모형 자료구조를 활용한 수자원 운영 계획 시스템의 설계)

  • Kim, Jae-Hee;Park, Youngjoon;Kim, Sheung-Kown
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.160-163
    • /
    • 2000
  • Due to the complexities of the real-world system, a water resource management program has to deal with various types of data. It appears that management personnel who has to use the program usually suffers from the technical burdens of handling large amount of data and understanding the optimization theory when they try to interpret the results. By combining the capabilities of database technology and modeling technique with optimization procedure we can develop a reliable decision supporting tool for multi-reservoir operation planning, which yields operating schedule for each dam in a river basin. We introduce two special data handling methodology for the real world application. First, by treating dams, hydro-electric power generating facilities and demand sites as separate database tables, the proposed data handling scheme can be applied to general water resource system in Korea. Second, by assigning variable names using predetermined key words, we can save searching time for identifying the moaning of the variables, so that we can quickly save the results of the optimization run to the database.

  • PDF

Profit-based Thermal Unit Maintenance Scheduling under Price Volatility by Reactive Tabu Search

  • Sugimoto Junjiro;Yokoyama Ryuichi
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.331-338
    • /
    • 2005
  • In this paper, an improved maintenance scheduling approach suitable for the competitive environment is proposed by taking account of profits and costs of generation companies and the formulated combinatorial optimization problem is solved by using Reactive Tabu search (RTS). In competitive power markets, electricity prices are determined by the balance between demand and supply through electric power exchanges or by bilateral contracts. Therefore, in decision makings, it is essential for system operation planners and market participants to take the volatility of electricity price into consideration. In the proposed maintenance scheduling approach, firstly, electricity prices over the targeted period are forecasted based on Artificial Neural Network (ANN) and also a newly proposed aggregated bidding curve. Secondary, the maintenance scheduling is formulated as a combinatorial optimization problem with a novel objective function by which the most profitable maintenance schedule would be attained. As an objective function, Opportunity Loss by Maintenance (OLM) is adopted to maximize the profit of generation companies (GENCOS). Thirdly, the combinatorial optimization maintenance scheduling problem is solved by using Reactive Tabu Search in the light of the objective functions and forecasted electricity prices. Finally, the proposed maintenance scheduling is applied to a practical test power system to verify the advantages and practicability of the proposed method.

Development of An On-line Scheduling Framework Based on Control Principles and its Computation Methodology Using Parametric Programming (실시간 일정계획 문제에 대한 Control 기반의 매개변수 프로그래밍을 이용한 해법의 개발)

  • Ryu, Jun-Hyung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.12 no.12
    • /
    • pp.1215-1219
    • /
    • 2006
  • Scheduling plays an important role in the process management in terms of providing profit-maximizing operation sequence of multiple orders and estimating completion times of them. In order to takes its full potential, varying conditions should be properly reflected in computing the schedule. The adjustment of scheduling decisions has to be made frequently in response to the occurrence of variations. It is often challenging because their model has to be adjusted and their solutions have to be computed within short time period. This paper employs Model Predictive Control(MPC) principles for updating the process condition in the scheduling model. The solutions of the resulting problems considering variations are computed using parametric programming techniques. The key advantage of the proposed framework is that repetition of solving similar programming problems with decreasing dimensionis avoided and all potential schedules are obtained before the execution of the actual processes. Therefore, the proposed framework contributes to constructing a robust decision-support tool in the face of varying environment. An example is solved to illustrate the potential of the proposed framework with remarks on potential wide applications.

Estimation of Material Requirement of Piping Materials in an Offshore Structure using Big Data Analysis (빅데이터 분석을 이용한 해양 구조물 배관 자재의 소요량 예측)

  • Oh, Min-Jae;Roh, Myung-Il;Park, Sung-Woo;Kim, Seong-Hoon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.3
    • /
    • pp.243-251
    • /
    • 2018
  • In the shipyard, a lot of data is generated, stored, and managed during design, construction, and operation phases to build ships and offshore structures. However, it is difficult to handle such big data efficiently using existing data-handling technologies. As the big data technology is developed, the ship and offshore industries start to focus on the existing big data to find valuable information from it. In this paper, the material requirement estimation method of offshore structure piping materials using big data analysis is proposed. A big data platform for the data analysis in the shipyard is introduced and it is applied to the analysis of material requirement estimation to solve the problems in piping design by a designer. The regression model is developed from the big data of piping materials and verified using the existing data. This analysis can help a piping designer to estimate the exact amount of material requirement and schedule the purchase time.

An Empirical Study on e-Logistics of Port & Logistics industry (항만물류산업의 e-Logistics 실증연구)

  • 조소희;허윤수;남기찬
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.365-370
    • /
    • 2004
  • At the present, e-commerce takes the place of existing transaction form in structure in the world trade by advancement of Information Technology and diffusion of Internet. There is no exceptions of this tendency even in industry of maritime and logistics. So, global shipping lines and logistics companies try to construct the e-Business network system for increasing their competitiveness in an are of cyber. However, in Korea, most of companies prefer "final handshake" as the traditional way of transaction to "e-commerce", because they bear a distrust in mind about the outflow of transaction information and security of settlement. So, number of companies using e-commerce is very small, and this situation causes the limited factor for activating the transaction structure of it. The rate of using e-commerce in logistics industry is lower than other industries, even more higher effectiveness is expected when they use it. Especially, it is very necessary not only e-commerce but also e-Logistics which can serve information of freight cost on cargo flow, operation cost and schedule, and tracing information of cargo. Increasing the necessity of e-Logistics, this study research the rate rf using e-Logistics focused on maritime and logistics companies, and analyze the transaction form among members of these industries for improving them. In detail, this paper examine the drivers for activating e-Logistics, and present the effective factors for a successful development of these industries.

  • PDF