• Title/Summary/Keyword: test system

Search Result 26,743, Processing Time 0.052 seconds

An Expert System for the Fault Diagnosis of Hard Disk Drive Test System

  • Moon, Un-Chul;Kim, Woo-Kuen;Lee, Seung-Chul
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.2424-2429
    • /
    • 2005
  • Hard Disk Drive (HDD) test system is the equipment for the final test of HDD product by iterative read/write/seek test. This paper proposes an expert system for the fault diagnosis of HDD test systems. The purposed expert system is composed with two cascade inference, fuzzy logic and conventional binary logic. The fuzzy logic determines the possibility of the system fault using the test history data, then, the binary logic inferences the fault location of the test system. The proposed expert system is tested in SAMSUNG HDD product line, KUMI, KOREA, and shows satisfactory results.

  • PDF

DESIGN OF COMMON TEST HARNESS SYSTEM FOR SATELLITE GROUND SEGMENT DEVELOPMENT

  • Seo, Seok-Bae;Kim, Su-Jin;Koo, In-Hoi;Ahn, Sang-Il
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.544-547
    • /
    • 2007
  • Because data processing systems in recent years are more complicated, main function of the data processing is divided as several sub-functions which are implemented and verified in each subsystem of the data processing system. For the verification of data processing system, many interface tests among subsystems are required and also a lot of simulation systems are demanded. This paper proposes CTHS (Common Test Harness System) for satellite ground segment development which has all of functions for interface test of the data processing system in one PC. Main functions of the CTHS software are data interface, system log generation, and system information display. For the interface test of the data processing system, all of actions of the CTHS are executed by a pre-defined operation scenario which is written by purpose of the data processing system test.

  • PDF

An Expert System using Fuzzy and Binary logic for the Fault Diagnosis of Hard Disk Drive Test System (Hard Disk Drive 검사시스템의 고장 진단을 위한 퍼지-이진 논리 결합형 전문가 시스템에 관한 연구)

  • 문운철;이승철;남창우
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.53 no.6
    • /
    • pp.457-464
    • /
    • 2004
  • Hard Disk Drive (HDD) test system is an equipment for the final test of HDD product by iterative read/write/seek test. This paper proposes an expert system for the fault diagnosis of HDD test systems. The purposed expert system is composed with two cascade inference, fuzzy logic and conventional binary logic. The fuzzy logic determines the possibility of the system fault using the test history data, then, the binary logic inferences the fault location of the test system. The proposed expert system is tested in SAMSUNG HDD production line, KUMI, KOREA, and shows satisfactory results.

A study on the tester design of Autonomous station control system (자율분산 역 제어시스템의 테스터 설계 연구)

  • Kim, Young-Hoon;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1531-1535
    • /
    • 2008
  • The Tester of Autonomous station control system is a system which can test the main function of Autonomous station control system through the data field. The purpose of this paper is to meet the system requirements and design a main function, menu and user interface using Use-case. The main function is a time-deadline test, a schedule broadcast test, a route control test and a version-up test, etc. The design of Autonomous station control system tester plays a primary role of the important document for the upcoming future system development of the tester.

  • PDF

The Study on the Cost Analysis Based on ABC System in Clinical Laboratory (활동기준원가시스템을 이용한 임상병리과 검사 서비스 원가 분석)

  • 전기홍;김보경;안태식;조우현
    • Health Policy and Management
    • /
    • v.8 no.2
    • /
    • pp.88-109
    • /
    • 1998
  • The main purpose of this study is to compare the traditional cost system and ABC(Activity Based Cost) system of clinical laboratory department in a hospital. The study subject was 296 services in clinical laboratory from March, 1997 to August, 1997. In a new costing system, cost for a lab test consist of direct cost element, activity based cost element, and allocated common cost element. In a traditional cost system, cost elements included direct cost element and indirect cost allocated based on test volumes The major findings of this research were as follows. 1. In the application of ABC system, total cost was analyzed as follows. Direct cost was 39.3% of total cost. Activity cost and allocation were 20.9% and 39.8%, respectively. The results of analysis to use traditional cost system were as follows. Direct cost was 39.3% and it was as same as the result of direct cost of ABC system. Indirect cost was 60.7%. 2. Activities of clinical laboratory of subject hospital were registration, pre-test operation, test, test result handling, delivery, culture, post-test operation, technical support, management support, and educational support. 3. The differences of the case of higher number of test case being carried out, the cost of ABC system was lower than the cost of traditional cost system. Otherwise in the case of lower number of test case being carried out, the rests have not been appropriately evaluated, and effective management were needed in clinical laboratory.

  • PDF

Design and Performance Analysis of Direction Finding System Test-bed for Communication-band Signals (통신대역신호 방향탐지 장치 Test-bed 개발 및 성능 분석)

  • Choi, Jun-Ho;Park, Young-Mi;Yang, Jong-Won;Nah, Sun-Phil;Park, Cheol-Sun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.154-160
    • /
    • 2007
  • A direction finding system test-bed(DFSTB) at the electronic warfare communication-band is presented to efficiently evaluate and optimize the performance of the direction finding system through the indoor test setup. This test-bed gives a significant benefit to the designers of the direction finding system because it allows flexible test and design trade-off in the system design cycle. The system description and implementation of test-bed architecture, and the experiment results of direction finding accuracy according to modulation schemes are presented.

Determination of No-Failure Test Times for the Life Test of Hydraulic System Components (유압시스템 구성품의 수명시험을 위한 무고장 시험시간의 산출)

  • Lee, S.R.;Kim, H.E.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.3 no.3
    • /
    • pp.8-13
    • /
    • 2006
  • It is very important for the manufacturers to predict the life of hydraulic system components according to the results of life tests. Since it takes too much time to test the hydraulic system components until failure, the no-failure test method is applied for the life test of them. If the shape parameter of Weibull distribution, the number of samples, the confidence level, and the assurance life are given, the no-failure test times of hydraulic system components can be calculated by given equation. Here, the procedures to obtain the no-failure test times of the hydraulic system components such as hydraulic motors and pumps, hydraulic cylinders, hydraulic valves, hydraulic accumulators, hydraulic hoses, and hydraulic filters are described briefly.

  • PDF

Design and Implementation of Online Moral Level Test System based on Kohlberg's Moral Development (Kohlberg의 도덕성 발달 수준을 기반으로 한 온라인 도덕성 검사 시스템 설계 및 구현)

  • Baek, Hyeon-Gi;Ha, Tae-Hyeon;Lee, Hyeon-No
    • Journal of Digital Convergence
    • /
    • v.4 no.2
    • /
    • pp.51-65
    • /
    • 2006
  • This study is to evaluate the morality of teenagers with regard to features of justice. On the basis of the findings, an online morality level test system is designed and implemented to help students understand themselves better and to increase moral maturity through this self-test method based on Kohlberg's Morality Development Level. The main purpose of this study is to help students test and evaluate their morality, and it will be contributed to slough off egocentrism and to orient a relationship based on a mutual respect by using the embodied system. If this system can be applied successfully, an effective improvement on students' further education guidance may be gained because the test and its results are made in the system simultaneously. Also this easy and fast test system can attain much more economical effects than a written test.

  • PDF

Durability Evaluation of Platform Safety Step System (승강장 안전발판 시스템의 내구성 평가)

  • Park, Min Heung;Kwak, Hee Man;Kim, Min Ho
    • Journal of Applied Reliability
    • /
    • v.16 no.2
    • /
    • pp.125-133
    • /
    • 2016
  • Purpose: The purpose of this study is to evaluate durability of platform safety step system in railway. Method: We performed finite element analysis & durability analysis of platform safety step system with VPD (Virtual Product Development) techniques and examined the durability standard & qualification life through the rig test during no failure test time in reliability qualification test. We continued to test 1 million cycles in KRS (Korea Railway Standard) for system's robust design performance. Result: FEM analysis results are 14.9MPa & 14.7MPa of pin-joint, pivot and durability analysis result is above 1 million cycles. we calculated theoretically no failure test time 855,000 cycles and through the 1 million cycles durability rig test in KRS standard we confirmed product quality. Conclusion: This platform safety step system was designed very safe in terms of a mechanical strength & durability.

Management and operation of K-AGT test line (한국형경량전철 시험선의 관리 및 운영)

  • Han, Seok-Youn;Jun, Bong-Roong;Lee, Ho-Yong;Lee, An-Ho
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.964-967
    • /
    • 2006
  • Korea Railroad Research Institute (the following 'KRRI') built AGT test line in Gyeong San-city, Kyongsang-bukdo province, Korea on August, 2004. This test line is exclusively used for the test of the driverless rubber-tired AGT system, and applied with research result of AGT System Development Project like vehicles, power supply, control and signaling, track and infrastructure system. The test line is available for the test of rubber tired AGT system's performance, function, safety. In this paper, we described the operation system of test line for the test of performance, safety, reliability, and also system operation in emergency. Finally we present the operation result of test line.

  • PDF