• Title/Summary/Keyword: test system

Search Result 26,704, Processing Time 0.046 seconds

Modeling and verification of generator/control system of Seo-Inchon combined-cycle plant by load rejection test (부하차단시험에 의한 서인천복합화력 발전기.제어계의 모델링 및 검증)

  • 최경선;문영환;김동준;추진부;류승헌;권태원
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.4
    • /
    • pp.501-510
    • /
    • 1996
  • The gas-turbine generator of Seo-Incheon combined-cycle plant was tested for derivation of a model for dynamic analysis. Load rejection and AVR step test was performed to get the dynamic response of generator. The parameters of generator/control system model were determined by these measured data. No-load saturation test was performed for the saturation characteristics of the generator under steady state. V-curve test was also performed so as to find exact generator parameters. Q-axis parameters of generator was derived by measuring power angle. AVR and governor constants have been tuned by their oscillatory period and setting time characteristics. The derived parameters of generator control system is verified by one-machine infinite bus system simulation. (author). 7 refs., 20 figs., 5 tabs.

  • PDF

Review of the tracebility of impulse voltage measuring system in test laboratory (시험소 충격전압 측정시스템의 소급성검토)

  • Heo, J.C.;Choi, I.S.;Jeong, J.Y.;Ban, S.G.;Park, J.W.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07c
    • /
    • pp.1632-1634
    • /
    • 2003
  • For lihgtning and switching impulse voltage performances in laboratories, impulse voltage measuring system, which is consisted of voltage divider, recording instrument and connecting system between divider and recording instrument, is used. In order to show reliability of test result in test laboratory, tracebility of these measuring system to be using in test laboratory is needed. In this paper, we describe tracebility and uncertainty of impulse voltage measuring system in test laboratory.

  • PDF

The Study on the Endurance Test of Localization Part of T-50 Aircraft Engine (T-50 엔진 국산화품목 내구성시험 평가 연구)

  • Baek, Suengho;Kim, Jaichul;Park, Geontai
    • Journal of Aerospace System Engineering
    • /
    • v.1 no.3
    • /
    • pp.13-20
    • /
    • 2007
  • The objective of this study is to investigate endurance test of localization part for T-50 aircraft engine. Major localization parts of the engine (F404-STW-102) was performed using Accelerated Simulated Mission Engine Test. The purpose of this test is to evaluate of quality demonstration capability, to verify design of engine localization parts, and to improvement safety and operation rate of T-50 advanced trainer by finding out operational problems in production phase and fixing it.

  • PDF

Study on climb performance flight test techniques for small airplane (소형단발비행기 상승성능 확인을 위한 비행시험방안 연구)

  • Kim, PhilSoo
    • Journal of Aerospace System Engineering
    • /
    • v.7 no.3
    • /
    • pp.39-44
    • /
    • 2013
  • On this study, climb performance related airworthiness requirements for small airplane on KAS Part 23 and flight test techniques for climb performance (Sawtooth climb) are introduced. Also, applicable procedures, test conditions and required test parameters of sawtooth climb flight test techniques are reviewed.

Study on the Estimation of Long Life Cycle and Reliability Tests for Epoxy Insulation Busway System (에폭시 박막 절연형 버스웨이 시스템의 장기 수명 및 신뢰성 평가에 관한 연구)

  • Jang, Dong-Uk;Park, Seong-Hee;Lee, Kang-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.261-268
    • /
    • 2018
  • The use of electric cable was limited due to the installation time and large space as the increase of power demand and load quantity in side line. In order to solve these problems, the application of busway system which can supply the large current was increasing. But it was lack of methods of performance tests to evaluate the reliability and results of test for busway system. In this paper, we presented items to evaluate the reliability test for epoxy coated busway system with reference to IEC 61349-6. In addition, we proposed items to evaluate the reliability and long term life cycle test for the epoxy coated busway system. The combined acceleration deterioration test that reflects actual conditions of the survey as much as possible was conducted considering both thermal and electrical stresses. The deterioration condition was selected to satisfy fifty years life expectation and the insulation performance verification test of the busway system confirmed the long term life prediction. Furthermore, as test items for reliability assessment of compliance with the environment for the use of temperature, humidity and load current where busway system was installed, thermal overload test, water immersion test, cold shock temperature test and thermal cycle test were performed. And we examined changes in characteristics and abnormality after tests. From results, the test items presented to evaluate performance and reliability of the epoxy insulated busway system were confirmed to be appropriate in this paper, and the performance of the product was also confirmed to be excellent for reliability tests.

Change-point Approach for Analyzing Failure Trend in Repairable Generating Systems (수리 가능 발전기 시스템의 고장추세 분석을 위한 변화점 접근방법)

  • Hong, Min-Pyo;Bae, Suk-Joo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.1
    • /
    • pp.11-19
    • /
    • 2009
  • A number of trend test methods, i.e., Military Handbook test and Laplace test etc., have been applied to investigate recurrent failures trend in repairable systems. Existing methods provide information about only existence of trend in the system. In this paper, we propose a new change-point test based on the Schwarz Information Criterion(SIC). The change-point approach is more informative than other trend test methods in that it provides the number of change-points and the location of change-points if it exists, as well as the existence of change-point for recurrent failures. The change-point test is applied to nine 300MW generating units operated in East China. We confirm that the change-point test has a potential for establishing optimal preventive maintenance policy by detecting change-point of failure rate.

A Study on Performance Test of a Photovoltaic System Inverter using Real Time Digital Simulator (RTDS) (RTDS 시험모듈을 이용한 태양광 인버터의 성능시험에 관한 연구)

  • Kim, Eung-Sang;Kim, Seul-Ki;Jeon, Jin-Hong;Ahn, Jong-Bo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.2
    • /
    • pp.325-333
    • /
    • 2007
  • A PV system inverter test module using RTDS was developed and performance test of a commercial PV inverter was carried out. The developed module consists of one RTDS hardware rack, RTDS software models representing PV array and simple distribution system, and two power amplifiers that was specifically designed for generating power corresponding to signals from RTDS. Performance test results verified effectiveness and reliability of the test module. It is expected that the developed test module may help PV inverter manufacturers improve ana test their systems in the developing stage.

전기체 정적시험 치구설계 기술보고서

  • Kim, Sung-Chan;Shin, Jeong-Woo;Shim, Jae-Yeul;Hwang, In-Hee
    • Aerospace Engineering and Technology
    • /
    • v.1 no.2
    • /
    • pp.32-44
    • /
    • 2002
  • This paper contains the information that describes the test fixture design and technology for full-scale airframe static test. Obtained technologies consist of determination of design load for test fixture, design technique for loading system, counterbalance system, positioning system of test article, test equipment and overload protection method. Full-scale airframe static test of advanced jet trainer was implemented using test fixture which are applied these technique.

  • PDF

Instrumentation of Thermo-sensitivity Test of Well Points, a Pilot Report (정혈 지열감도 측정법의 객관화 -기기 개발 및 시험 측정 결과 보고-)

  • Lee, Byung-Hoon;Lee, Sang-Hoon;Kim, Ki-Wang
    • Journal of Acupuncture Research
    • /
    • v.28 no.2
    • /
    • pp.133-141
    • /
    • 2011
  • Objectives : Although the thermo-sensitivity test in Well points in 12 Meridians(井穴知熱感度測定法) has been used for several decades, it is still performed by a manual way, and lack in objectivity consequently. To make it more objective, accurate and convenient test, we have developed a novel system to test thermo-sensitivity in Well points. Methods : To enhance the blindness of the test, we made a shielded system which give heat to some fingers of subjects in random way. To perform the test in quantitative manner, we developed a fully automated, computer-controlled system composed of heating bulbs and response button array. Results : The developed system showed linearity in heating the finger phantom. It also gave acceptable but interesting features in pilot tests with several young adult subjects. Conclusions : By the developed system, we could improve objectivity and convenience of the thermo-sensitivity test in Well points.

Pumping Performance Test of the NEG Elements (비증발형 게터소자 배기특성 평가시험)

  • 인상렬;박미영;정기석
    • Journal of the Korean Vacuum Society
    • /
    • v.13 no.2
    • /
    • pp.47-53
    • /
    • 2004
  • A getter pump test system is being developed as a core item of the national project for establishing the foundation of the vacuum technology in our country. A preliminary test system was prepared for developing the getter test procedure, and providing design requirements and system specifications before setting up the getter pump test system. The pumping speed and the pumping capacity of getter elements of low activation temperature used in the seal-off vacuum devices, for the hydrogen, carbon monoxide and nitrogen gases, were measured using the preliminary test system. The pumping characteristics of a domestic getter, developed mainly for the gas purifier, were compared with those of a foreign getter used widely in the lamp factories.