• Title/Summary/Keyword: test system

Search Result 26,704, Processing Time 0.045 seconds

헬리콥터용 반토오크 시스템 1차 시제 성능시험

  • Song, Keun-Woong;Kang, Hee-Jung;Sim, Joung-Wook;Lee, Je-Dong;Kim, Seung-Bum
    • Aerospace Engineering and Technology
    • /
    • v.4 no.2
    • /
    • pp.50-59
    • /
    • 2005
  • This paper described performance test of 1st prototype "Tail-Fan" system. KARI(Korea Aerospace Research Institute) developed "Tail-Fan" system as a kind of helicopter anti-torque system(ATS) and designed ATS performance test-rig for Tail-Fan system performance test. For Tail-Fan system performance tests, firstly, test-rig operation tests were carried out for verification of design specifications. And natural frequencies of fan blade and test-rig were measured respectively. To find the operation rotating speed for performance tests, vibration tests using accelerometers on tail gear box(TGB) were carried out. Through the fanplot and vibration test results, rotational speed for Tail-Fan performance test to avoid a resonance were found and performance tests were carried out in flight conditions. We analyzed test data by non-dimensionalization. Through this results, 1st prototype "Tail-Fan" system was satisfied with design requirements.

  • PDF

A Method of Test Case Generation using BPMN-based Model Reduction for Service System (BPMN기반의 모델 단축을 이용한 서비스 시스템의 테스트 케이스 생성 기법)

  • Lee, Seung-Hoon;Kang, Dong-Su;Song, Chee-Yang;Baik, Doo-Kwon
    • The KIPS Transactions:PartD
    • /
    • v.16D no.4
    • /
    • pp.595-612
    • /
    • 2009
  • The early test can greatly reduce the cost of error correction for system development. It is still important in SOA based service system. However, the existing methods of test case generation for SOA have limitations which are restricted to only web service using XML. Therefore, this paper proposes a method of test case generation using BPMN-based model reduction for service system. For minimizing test effort, an existing BPM is transformed into S-BPM which is composed of basic elements of workflow. The process of test case generation starts with making S-BPM concerning the target service system, and transforms the target service system into directed graph. And then, we generate several service scenarios applying scenario searching algorithm and extract message moving information. Applying this method, we can obtain effective test cases which are even unlimited to web service. This result is the generation of test case which is reflected in the business-driven property of SOA.

Effect of Proof Test of Protective System on Securing Safety of Off-site Risk Assessment (보호시스템 보증시험 적용이 장외영향평가 안전성 확보에 미치는 영향)

  • Kim, Min-Su;Kim, Jae-Young;Lee, Eun-Byeol;Yoon, Junheon;Park, Jai Hak
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.6
    • /
    • pp.46-53
    • /
    • 2017
  • The risk is expressed as consequence of damage multiplied by likelihood of failure. The installation of a protective system reduces the risk by reducing the likelihood of failure at the facility. Also, the protective system has different effects on the likelihood of failure according to the proof test cycle. However, when assessing risks in the Off-site Risk Assessment (ORA) system, the variation in risk was not reflected according to the proof test cycle of protective system. This study was conducted to examine the need for proof test and the importance of cycle setting by applying periodic proof test of the protective system to ORA. The results showed that the likelihood of failure and the risk increased with longer proof test cycle. The risk of a two-yearly proof test was eight times greater than that of a three-month cycle. From the results, the protective system needs periodic proof test. Untested protective system for a long term cannot be reliable because it is more likely to be failed state when it is called upon to operate. In order to reduce the risk to an acceptable level, it is effective to differently set the proof test cycle according to the priority. This study suggested a more systematic and accurate risk analysis standard than ORA. This standard is expected to enable an acceptable level of risk management by systematically setting the priority and proof test cycle of the protective system. It is also expected to contribute to securing the safety of chemical facilities and at the same time, will lead to the development of the ORA system.

The Action of the Reliability Enhancement in Test and Evaluation of the Weapon Systems (무기체계 시험평가의 신뢰성 향상방안)

  • Park, Jong Wan
    • Journal of Applied Reliability
    • /
    • v.15 no.2
    • /
    • pp.108-123
    • /
    • 2015
  • Test and Evaluation (T&E) have been verifying the level of it's technological skill and the needed operational status of the development weapons. If the overall spectrum of test and evaluation is fulfilled substantially in the production & deployment, the needed level of the weapon system will be enhanced and also the reliability status will become higher considerably. We can know currently these issues through the mass media and all kinds of the news regarding the defense industry and programs. And so this article have studied the method of enhancing reliability of the test and evaluation, the 6 variables were selected through the discussion of the professional group. The the test and evaluation group needs consistently the professional training systems. After DT&E, we have to the event to verify the technical level of the development systems. We have to take the high level of the kinds of the environmental test. Scientific methods like system engineering will be adapted in process of the test and evaluation. The number of suitable test prototype in the test and evaluation is analysed more systematically. And we need to establish the standardization of the test and evaluation. If 6 variables are well analysed and adapted in the working field, the reliability of the test and evaluation will be considerably, the defense industry will take the chance to develope the future-oriented.

Characteristics of Sub-cooled Nitrogen Cryogenic System for Applied High-Tc Superconducting Devices (고온초전도 응용기기용 과냉질소 냉각시스템의 냉각특성)

  • 강형구;김형진;배덕권;안민철;윤용수;장호명;고태국
    • Progress in Superconductivity and Cryogenics
    • /
    • v.6 no.1
    • /
    • pp.38-42
    • /
    • 2004
  • The cryogenic system for 6.6 kV/200 A inductive superconducting fault current limiter (SFCL) was developed at Yonsei university in 2003. The sub-cooled nitrogen cryogenic system could be applied to not only SFCL but also many other applied high-Tc superconducting (HTS) devices like superconducting motor, superconducting generator and superconducting magnetic energy storage (SMES). Generally, the cooling capacity of GM-cryocooler depends on the load temperature. Therefore it is necessary to perform the cooling capacity test at no load condition to calculate the exact cooling power and heat load of cryogenic system. In this research, the cooling capacity test of GM-cryocooler was executed and the heat load of developed cryogenic system was calculated. The long run operation test results of sub-cooled nitrogen cryogenic system were successful in pressure and temperature condition. Moreover, the design and fabrication method of cryogenic system were introduced and the test results were described.

Design of ramp-stress accelerated life test plans for a parallel system with two independent components using masked data

  • Srivastava, P.W.;Savita, Savita
    • International Journal of Reliability and Applications
    • /
    • v.18 no.2
    • /
    • pp.45-63
    • /
    • 2017
  • In this paper, we have formulated optimum Accelerated Life Test (ALT) plan for a parallel system with two independent components using masked data with ramp-stress loading scheme and Type-I censoring. Consider a system of two independent and non-identical components connected in parallel. Such a system fails whenever all of its components has failed. The exact component that causes the system to fail is often unknown due to cost and time constraint. For each parallel system at test, we observe its system's failure time and a set of component that includes the component actually causing the system to fail. The stress-life relationship is modelled using inverse power law, and cumulative exposure model is assumed to model the effect of changing stress. The optimal plan consists in finding out the optimum stress rate using D-optimality criterion. The method developed has been explained using a numerical example and sensitivity analysis carried out.

  • PDF

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

A Study on Evaluation Method of AEB Test (AEB 시험평가 방법에 관한 연구)

  • Kim, BongJu;Lee, SeonBong
    • Journal of Auto-vehicle Safety Association
    • /
    • v.10 no.2
    • /
    • pp.20-28
    • /
    • 2018
  • Currently, sharp increase of car is on the rise as a serious social problem due to loss of lives from car accident and environmental pollution. There is a study on ITS (Intelligent Transportation System) to seek coping measures. As for the commercialization of ITS, we aim for occupancy of world market through ASV (Advanced Safety Vehicle) related system development and international standardization. However, the domestic environment is very insufficient. Core factor technologies of ITS are Adaptive Cruise Control, Lane Keeping Assist System, Forward Collision Warning System, AEB (Autonomous Emergency Braking) system etc. These technologies are applied to cars to support driving of a driver. AEB system is stop the car automatically based on the result decided by the relative speed and distance with obstacle detected through sensor attached on car rather than depending on the driver. The purpose of AEB system is to measure the distance and speed of car and to prevent accident. Thus, AEB will be a system useful for prevention of accident by decreasing car accident along with the development of automobile technology. This study suggests a scenario to suggest a test evaluation method that accords with domestic environment and active response of international standard regarding the test evaluation method of AEB. Also, by setting the goal with function for distance, it suggests theoretic model according to the result. And the study aims to verify the theoretic evaluation standard per proposed scenario using car which is installed with AEB device through field car driving test on test road. It will be useful to utilize the suggested scenario and theoretical model when conducting AEB test evaluation.

Structural Analysis of KARI General Small-scaled Rotor Test System (GSRTS) (KARI 축소 로터 시험장치(GSRTS) 구조해석)

  • Kim, Deog-Kwan
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.15-23
    • /
    • 2008
  • This paper describes the structural analysis results of KARI General Small-scaled Rotor Test System (GSRTS) operated in KARI to verify operational safety. This GSRTS was developed to conduct a froude and mach small-scaled rotor test. This analysis was performed to investigate the structural Factor of Safety for the various small-scale rotor system like articulated or hingeless rotor and to check the operational capability using given operational design load. Specially, drive system has several bearings, mechanical gears, shaft, etc. and these parts must be required to achieve an operational safety. The calculation was done by using geometric data and material properties by analytical method. This rotor test system should be operated within these calculated Factor of Safety. Furthermore, the operational limitation should be defined as applied to small-scale rotor system of KUH in future.

  • PDF

Analysis of a Queueing Model with a Two-stage Group-testing Policy (이단계 그룹검사를 갖는 대기행렬모형의 분석)

  • Won Seok Yang
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.53-60
    • /
    • 2022
  • In a group-testing method, instead of testing a sample, for example, blood individually, a batch of samples are pooled and tested simultaneously. If the pooled test is positive (or defective), each sample is tested individually. However, if negative (or good), the test is terminated at one pooled test because all samples in the batch are negative. This paper considers a queueing system with a two-stage group-testing policy. Samples arrive at the system according to a Poisson process. The system has a single server which starts a two-stage group test in a batch whenever the number of samples in the system reaches exactly a predetermined size. In the first stage, samples are pooled and tested simultaneously. If the pooled test is negative, the test is terminated. However, if positive, the samples are divided into two equally sized subgroups and each subgroup is applied to a group test in the second stage, respectively. The server performs pooled tests and individual tests sequentially. The testing time of a sample and a batch follow general distributions, respectively. In this paper, we derive the steady-state probability generating function of the system size at an arbitrary time, applying a bulk queuing model. In addition, we present queuing performance metrics such as the offered load, output rate, allowable input rate, and mean waiting time. In numerical examples with various prevalence rates, we show that the second-stage group-testing system can be more efficient than a one-stage group-testing system or an individual-testing system in terms of the allowable input rates and the waiting time. The two-stage group-testing system considered in this paper is very simple, so it is expected to be applicable in the field of COVID-19.