• 제목/요약/키워드: test facility

검색결과 1,828건 처리시간 0.026초

페어링 노즈콘에 대한 공력가열 시험 (Aerodynamic Heating Test of Fairing Nose-Cone)

  • 최상호;김성룡;김인선
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2007년도 춘계학술대회B
    • /
    • pp.2534-2539
    • /
    • 2007
  • Launch vehicles are exposed to aerodynamic heating conditions while flying at high Mach numbers in the atmosphere. In this study aerodynamic heating test for fairing nose-cone was done using ATSF(Aerodynamic Thermal Simulation Facility) and Engineering Model for fairing. ATSF is a facility that can simulate given temperature profile using about 4,000 halogen heaters on fairing model. Aerodynamic heating profile is got from result of thermal analysis using MINIVER, Thermal Desktop and SINDA/FLUINT. After aerodynamic heat test, it is found that initial temperature of fairing inner surface and thickness of BMS has important effects on temperature of fairing inner surface. Also it is confirmed that maximum temperature of fairing nose-cone inner surface during flight is lower than allowable temperature limit. Later, thermal correlation between thermal analysis and experimental results will be done using aerodynamic heating test result

  • PDF

회전 환경에서의 축류 터빈 성능평가 (Axial Turbine Performance Evaluation in a Rotating Facility)

  • 윤용상;송성진;김홍원;조성희
    • 한국유체기계학회 논문집
    • /
    • 제4권3호
    • /
    • pp.46-52
    • /
    • 2001
  • This paper describes a turbine test program conducted at Seoul National University(SNU). To measure blades' aerodynamic performance, either linear(2-Dimensional) or annular(3-Dimensional) cascades are often used. However, neither cascade can consider effects such as those due to rotation or rotor-stator interaction. Therefore, a rotating test facility for axial turbines has been designed and built at SNU, and its description is given in this paper. The results from an axial turbine performance test are presented. At the design point, the measured efficiency agrees with the efficiency predicted by a meanline analysis. At off design points, however, the measured and predicted efficiencies diverge. The most likely cause is hypothesized to be the inaccuracy of correlations used in the meanline analysis at off design points.

  • PDF

극초음속 추진기관 지상시험 설비 구축 및 성능 시험 (Construction and Performance Test of Ground Test Facility for the Hypersonic Propulsion System)

  • 이형진;이복직;김세환;정인석
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2007년도 제29회 추계학술대회논문집
    • /
    • pp.41-44
    • /
    • 2007
  • 극초음속으로 비행하는 추진기관이 직면하는 고속 유동 등 제반 현상을 모사하기 위한 지상시험 설비로 충격파 풍동을 설계, 구축한 후 성능 시험을 수행하였다. 개발된 준 일차원 작동 해석를 이용하여 설계점을 파악한 후, 가압식 극고속 시험 구축을 위한 개념 설계를 완료하였다. 이어 단위 해석코드를 이용하여 구체적인 성능 설계 및 각 구성품에 대한 설계를 완료, 구축한 후, 다양한 운용조건에서 성능시험을 수행하였다.

  • PDF

터보펌프용 극저을 베어링/실 성능시험설비 (Cryogenic Bearing and Seal Test Facility for a Turbopump)

  • 곽현덕;전성민;김진한
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2005년도 연구개발 발표회 논문집
    • /
    • pp.341-347
    • /
    • 2005
  • To perform a cryogenic development test for Tribo-elements in a turbopump, a cryogenic bearing and seal test facility (BSTF) is designed and currently under construction in KARI. The working fluid is liquid nitrogen operating at a temperature $-197^{\circ}C$. The maximum operating pressure and volume flow rate of BSTF are 100 bar and 10 liters per second, respectively. The development tests of floating ring seals, inter-propellant seals (IPS) and cryogenic ball bearings in a turbopump will be performed using the BSTF. This paper briefly described design requirements and procedures of BSTF.

  • PDF

인삼재배시설의 구조모델링을 위한 실험연구 (A Experimental Study on Structure Modeling of Ginseng Fields Facility)

  • 오현교;윤성수
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2005년도 학술발표논문집
    • /
    • pp.181-186
    • /
    • 2005
  • The ginseng field structure collapses due to snow and wind. In order to study the structural modeling of ginseng field facility wind velocity test with shading material and strength test with used and unused timber were performed. The result of wind velocity test, we knew the characteristic of shading member of ginseng facility is followed linear regression, accurately. So, we made the assigned wind-value according to wind velocity. The result of strength test, the strength value of used-timber is smaller than the unused-timber and the coefficient of variance is larger than the unused-timber.

  • PDF

Reliability Design Based on System Performance-Cost Trade-off for Manufacturing facility

  • Hwang, Heung-Suk;Hwang, Gyu-Wan
    • International Journal of Reliability and Applications
    • /
    • 제2권4호
    • /
    • pp.269-280
    • /
    • 2001
  • The objective of this paper is to provide a model for effective implementation of costing RAM management in the design and procurement of production facility considering the system cost-performance trade-off. This research proposes a two-step approach of costing RAM design and test of system RAM for production facility. In Step 1, a static model is proposed to find an initial system configuration to meet the required performance based on system RAM and LCC and analyzes the trade-off relationships between various factors of RAM and LCC. In the second Step, we developed time and failure truncated models for system reliability test and analysis. For the computational purpose, we developed computer programs and have shown the sample results. By the sample test run, the proposed model has shown the possibilities to provide a good method to analyze system performance evaluation for both design and operational phase, This model can be applied to a wide variety of systems not only for costing RAM of the production facilities but also for the other kinds of equipment.

  • PDF

HANJUNG 석탄 실험연소로의 초기운전 (The First Operation of Coal Combustion Test Facility in HANJUNG)

  • 장길홍;장인갑;정석용;천무환;김중석
    • 한국연소학회:학술대회논문집
    • /
    • 한국연소학회 1998년도 제17회 KOSCI SYMPOSIUM 논문집
    • /
    • pp.79-84
    • /
    • 1998
  • In this paper we show design and operation of 1MWth pulverized coal combustion test facility. The test facility is consists of coal feeding system, furnace and flue gas treatment system. The furnace is equipped with a top-fired burner in order to avoid influence of gravity on the coal particles. There are two part of vertical(VP) and horizontal pass(HP) at furnace. We can measure temperature and species of coal flames in vertical pass. Also, there is horizontally arranged section where investigation regarding corrosion and deposit formation will be carried out. The burner of combustor was externally air staging burner(EASB) type made by IFRF. The pulverized high bituminous(Blair athol) coal from Australia was used as fuel, and the particle size less than 80 ${\mu}m$ was 83.4%. Overall excess air ratio was 1.2.

  • PDF

스크램제트 엔진 흡입구 시험을 위한 자유제트형 지상추진시험설비의 마하 5 성능 검증 (Mach 5 Performance Verification of Free-jet Type Ground Propulsion Test Facility for Scramjet Engine Intake Test)

  • 이양지;양인영;이경재;오중환;최진
    • 한국추진공학회지
    • /
    • 제26권1호
    • /
    • pp.77-87
    • /
    • 2022
  • 한국항공우주연구원 스크램제트 엔진 시험설비를 활용한 스크램제트 엔진 흡입구 지상 시험을 수행하기 위하여 일반적으로 진행하는 시험 가능 여부 확인 절차를 소개하였다. 스크램제트 흡입구 시험을 수행하기 위하여 새롭게 제작된 마하 5 노즐의 설계 과정을 정리하였으며, 노즐의 코어 유동 분포를 확인하기 위한 장치를 설명하고 코어 유동 시험 분석 결과를 기록하였다. 일련의 시험 결과를 통하여 흡입구가 신규 마하 5 노즐 코어에 위치하는 것을 확인하였다.

한국형발사체 추진기관 시험설비 구축에 대한 소개 (Introduction to Construction of Propulsion Test Facilities for KSLV-II)

  • 한영민;조남경;정용갑;김승한;유병일;이광진;김진선;김지훈;김영목
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2010년도 제35회 추계학술대회논문집
    • /
    • pp.343-346
    • /
    • 2010
  • 한국형발사체 추진기관 개발을 위한 연소기 연소시험설비, 터보펌프 실매질 시험설비, 엔진 지상 및 고공모사 연소시험설비, 추진기관시스템 시험설비 구축 계획에 대해 간략히 기술하였다. 연소기, 터보펌프, 엔진 시험설비에서는 75톤급 액체로켓엔진의 부품 및 엔진시스템의 개발 및 인증시험을 수행할 예정이고, 추진기관시스템시험설비에서는 한국형발사체 1/2/3단용 추진기관시스템의 개발 시험을 수행할 예정이다. 추진기관 시험설비는 나로우주센터에 건설될 예정이며 구축 일정, 예산, 안전거리, 효율성 등을 고려하여 구축하고자 한다.

  • PDF

상수도관로 누수신호의 특성 분석을 위한 누수 실험시설 개발 (Development of leakage test facility for leak signal characteristic analysis in water pipeline)

  • 박상혁;곽필재;이현동;최창호
    • 상하수도학회지
    • /
    • 제31권5호
    • /
    • pp.459-469
    • /
    • 2017
  • A real scale leakage test facility was developed to study the leak signal characteristics of water supply pipelines, and then leak tests were carried out. The facility was designed to overcome the limited experimental circumstances of domestic water supply pipeline experimental facilities. The length of the pipeline, which was installed as a straight line, is 280m. Six pipes were installed on a 70m interval with different pipe material and diameters that are DCIP(D200, D150, D100, D80), PE(D75) and PVC(D75).The intensity of the leakage is adjusted by changing the size of the leak hole and the opening rate of ball valve. Various pressure conditions were simulated using a pressure reducing valve.To minimize external noise sources which, deteriorate the quality of measured leak signal, the facility was built at a quiet area, where traffic and water consumption by customers is relatively rare. In addition, the usage of electric equipment was minimized to block out noise and the facility was operated using manual mode. From the experimental results of measured leakage signal at the facility, it was found that the signal intensity weakened and the signal of high frequency band attenuated as the distance from the water leakage point increased.