• Title/Summary/Keyword: test System

Search Result 26,837, Processing Time 0.06 seconds

A Design and Implementation of a Mobile Test Device Based-on Embedded System (임베디드 기반의 모바일 LCD 모듈 검사장비 설계 및 구현)

  • Kim, Hong-Kyu;Lee, Ki-Wha;Moon, Seung-Jin
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.14 no.6
    • /
    • pp.523-529
    • /
    • 2008
  • In this paper, we proposed mobile LCD module test device on embedded based, when operating the existing LCD, divide flicker clearly in full frame, and configuration so as to support between other CPU interface, MDDI, SPI, 24Bit RGB interface, etc. that is based on a high-speed CPU. In addition, when demand to test about each pixel of LCD, it is possible to change IP design of H/W, FPGA, but proposed system is application possible without other design changing. Proposed system is made smaller and equipped with battery, so secure with mobility for effective test the LCD/OLED module and it is able to test the pattern by the client program, for example exiting picture, mpeg, simple pattern test and test per pixel, scale, rotation, Odd/Even pixel per video, etc. From now on, if integrating with independent test system and it is configured that is able to mutual communication and test, it is expected to reduce consumption of human resources and improve productivity for LCD module test.

Study on large tonnage pile foundation load test system and field test of long rock-socketed pile

  • Zhang, Xue-feng;Ni, Ying-sheng;Song, Chun-xia;Xu, Dong
    • Geomechanics and Engineering
    • /
    • v.21 no.6
    • /
    • pp.565-570
    • /
    • 2020
  • Large tonnage pile foundation load test system is designed in this paper by using pre-stressed technique to optimize the design of anchor pile reaction beam system, in which project pile can be successfully taken as anchor pile. The test results show that the cracks and excessive deformations of the prestressed anti-force device designed in this study have not occurred, and the prestressed tendons of the anchor pile ensure that the anchor pile will not be pulled and fractured, and the prestressed tendons can be reused, thus ensuring the safety and reliability of the test. This test method can directly test bearing capacity of long rock-socketed piles, and analysis bearing behaviors from test results of sensors which embedded in the pile. Through test studied, authors summarized the vertical bearing characteristics of long rock-socketed piles and the main problems that should be paid attention to during design and construction, and provided reliable solutions.

Study on the Control System of Verification Test for Offshore Installation Simulation (해양플랜트 환경모사를 위한 실증시험 시스템 구축에 관한 연구)

  • Ju, H.D.;Kim, T.O.;Kang, G.H.;Ha, Y.C.
    • Smart Media Journal
    • /
    • v.1 no.1
    • /
    • pp.48-52
    • /
    • 2012
  • A reliable test of offshore plant hold a key post in offshore engineering technology. The offshore self-supporting of process module design and basic design technology needs engineering verification based on the reliable test. And also reliable verification test data is very important. Therefore, verification test system for offshore installation simulation is necessary. This paper explains design of data acquisition system and control system based on the parameter of measured and controlled variable which is for establishing offshore installation simulation system.

  • PDF

Rocket Engine Test Facility Improvement for Hot firing test of a Combustor in the 30-tonf class (30톤급 연소기의 연소시험을 위한 설비 개량)

  • Lee Kwang-Jin;Seo Seonghyeon;Lim Byoungjik;Moon Il-Yoon;Han Yeoung-Min;Choi Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • v.y2005m4
    • /
    • pp.313-317
    • /
    • 2005
  • The facility improvement for hot firing test of combustion chamber having thrust of 30-tonf class and chamber pressure of 60bara were performed at ReTF in KARI. The KSR-III main engine having combustion pressure of 13bara and thrust of 12.5tonf had been successfully tested in this facility. To increase the capability of the facility, the feeding and the trust measurement system have been modified. The modification of the feeding system plays also a role of ensuring the stability of propellant supply and two step ignition sequence of combustion chamber. The one-axis thrust measurement system of up to 60tons has been newly manufactured and installed in test stand and the water/kerosene supply lines with high pressure vessel of $4m^3$ and gas nitrogen vessel of $10m^3$ have been designed for regenerative cooling system. The results of cold flow test show that this facility has been successfully improved to satisfy the requirement for hot firing test of high performance combustor.

  • PDF

A Study on the Development of the Automatic Performance-Test-Bench for Drag Torque (드래그 토오크의 자동 성능시험기 개발에 관한 연구)

  • Lee, Seong-Ho;Mok, Hak-Soo
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.16 no.1
    • /
    • pp.166-174
    • /
    • 2008
  • Recently, the automotive industry has been developing rapidly. With the progress parts of the automobile components need high quality and the reliability. Among them, braking unit is essential device, and acquire the reliability through the performance test of brake. This study was aimed to design the performance-test-bench to measure the drag torque which has effect on caliper in braking unit. In this progressive technology, it is vital importance to use hydraulic and pneumatic, and to combine test bench with instrumentation engineering technology. This system to construct the design of hydraulic and pneumatic circuit, interface technique between sensors and personal computer, data acquisition and display design, and integrated control are very important technology. Moreover, reliable data are obtained through vacuum system and hydraulic and pneumatic system by using of booster and brake master cylinder which are actually applied to automobile. Then, data signal detector sensors for speed, pressure and torque is attached on this system. Therefore, in this study, we designed a performance-test-bench by and we also made an total control system using personal computer which is more progressive and flexible method than existing PLC control.

A Study on Train Control System Accelerated Stress Modeling (열차제어시스템 가속 스트레스시험 모델링에 관한 연구)

  • Shin, Duc-Ko;Lee, Jae-Ho;Lee, Kang-Mi
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.624-630
    • /
    • 2006
  • This paper studies a modeling to demonstrate predicted reliability of the train control system components by performing an accelerated stress test. There are two tests for demonstrating predicted reliability; test run at the whole system level, and accelerated life test and accelerated stress test at the component level. In this paper, we imposed accelerated stress on the system and studied the train control system modeling for the accelerated stress test, which demonstrates predicted reliability according to whether or not the equipment is operating. Reliability of train control system consisting of electronic components varies drastically according to temperature so we considered the Arrhenius equation and the activation energy of electronic components. We also used reliability modeling with weighted average and calculated time necessary to complete the accelerated stress test on train control system.

  • PDF

A study on the Conformance Test for Protocols Written in Estelle (Estelle로 기술된 프로토콜의 적합성 검증에 관한 연구)

  • 인소란;원유훈
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.29B no.11
    • /
    • pp.1-7
    • /
    • 1992
  • The conformance test is a methodology which verifies whether the Implementation Under Test (IUT) conforms to its standard specification or not. In this paper, first, the Conformance Test System(CTS) is implemented in prototype including verification test type, black-box test strategy, conformance test class, remote test structure, and IUT which is described by the ISO Estelle among Formal Description Techniques. Second, through this prototype the proposed system is experimented. The prototype is composed of two modules. The first module is the Estelle-to-Pascal preprocessor which converts the Estelle program to the corresponding Pascal program because the experimental IUT was described using the unexecutable code form of Estelle before being tested by the TD(Test Driver). The TD, the second module, is based on the master-slave concept and plays important role is CTS. The TD acts as the master with the IUTd being the slave. The prototype system is implemented using Turbo-C, Turbo-Pascal and Turbo-Assembly.

  • PDF

Performance Evaluation with Protective Function test of Inverter for Solar Power Generation (태양광발전용 인버터 보호기능시험 성능평가)

  • Yoon, Yong-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1570-1575
    • /
    • 2018
  • The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. This paper describes domestic technical standard of Photovoltaic(PV) PCS(Power Conditioning Systems)- Characteristics of the utility interface. Especially protective function test items of 1) Output overvoltage protection test, 2) Output undervoltage protection test, 3) Frequency rise protection test, 4) Frequency fall protection test, 5) System voltage's momentary interruptions, 6) System voltage distortion capability test. Therefore in this paper protective function test item of facilities evaluation detailed standards for new renewable energy, small, medium and large photovoltaic inverter standard is studied and analyzed and finally full tested by PV inverter performance function.

Air Similarity Test for the Evaluation of Aerodynamic Performance of Steam Turbine (스팀터빈의 공력성능 평가를 위한 공기 상사실험)

  • Lim, Byeung-Jun;Lee, Eun-Seok;Lee, Ik-Hyoung;Kim, Young-Sang;Kwon, Gee-Bum
    • 유체기계공업학회:학술대회논문집
    • /
    • 2003.12a
    • /
    • pp.73-79
    • /
    • 2003
  • The steam turbine efficiency is an important factor in power plant. Accurate evaluation of steam turbine performance is essential. However, it is not easy to evaluate the steam turbine performance due to its high temperature and high pressure circumstance. Therefore most steam turbine performance tests were conducted by air similarity test. This paper described a test program for air similarity test of steam turbine at Korea Aerospace Research Institute. A test facility has been designed and built to evaluate aerodynamic performance of turbines. The test facility consists of air supply system, single stage test section, power absorption system, instrumentation and auxiliary system. For evaluation of steam turbine performance, the test of single stage axial turbine air similarity performance was conducted and uncertainty analysis was performed.

  • PDF

Effects of Human Error on the Optimal Test Internal and Unavailability of the Safety System (안전계통의 이용불능도 및 최적시험주기에 미치는 인간실수의 영향)

  • Chung, Dae-Wook;Koo, Bon-Hyun
    • Nuclear Engineering and Technology
    • /
    • v.23 no.2
    • /
    • pp.174-182
    • /
    • 1991
  • Effects of human error relevant to the periodic test are incorporated in the evaluations of the unavailability and optimal test interval of a safety system. Two types of possible human error with respect to the test and maintenance are considered. One is the possibility that a good safety system is inadvertently left in a bad state after test(Type A human error) and the other is the possibility that a bad safety system is undetected upon the test(Type B human error). An event tree model is developed for the steady-state unavailability of a safety system in order to determine the effects of human errors on the system unavailability and the optimal test interval. A reliability analysis of the Safety Injection System (SIS) was peformed to evaluate the effects of human error on the SIS unavailability. Results of various sensitivity analyses show that ; (1) the steady-state unavailability of the safety system increases as the probabilities of both types of human error increase and it is far more sensitive to Type A human error, (2) the optimal test interval increases slightly as the probability of Type A human error increases but it decreases as the probability of Type B human error increases, and (3) provided that the test interval of the safety injction pump is kept unchanged, the unavailability of SIS increases significantly as the probability of Type A human error increases but slightly as the probability of Type B human error increases. Therefore, to obtain the realistic result of reliability analysis, one should take shorter test interval (not optimal test interval) so that the unavailability of SIS can be maintained at the same level irrespective of human error. Since Type A human error during test & maintenance influeces greatly on the system unavailability, special efforts to reduce the possibility of Type A human error are essential in the course of test & maintenance.

  • PDF