• Title/Summary/Keyword: test

Search Result 128,955, Processing Time 0.088 seconds

CHANGES OF SOFTWARE UNIT TESTING TOOL - ATTOL TO TESTRT

  • Paek, Su-Hyun;Kang, Soo-Yeon;Yang, Koon-Ho;Choi, Seong-Bong
    • Proceedings of the KSRS Conference
    • /
    • 2008.10a
    • /
    • pp.84-87
    • /
    • 2008
  • ATTOL is a software unit testing tool produced by the ATTOL Testware SA in France. It automates the entire software unit testing process: test plan template and test program generation, test program execution, test result analysis and test report generation. ATTOL is suited for the development of embedded software as it allows programmers to operate in native and cross development environments. Particularly, it is used for the development of the flight software which is embedded in the Communication Ocean Meteorological Satellite (COMS). As the flight software is mission-critical, it requires the strict software quality and high testing constraints. The flight software of COMS is verified by ATTOL in native and cross platforms. In 2002, ATTOL was taken over by the IDM Rational Software and has been supplied with the name of Test RealTime (TestRT). The test process of TestRT becomes different from that of ATTOL as TestRT provides the new functionalities that were absent from ATTOL. TestRT provides the new features in the test script language, as well. In this paper, we compare the test process of ATTOL to TestRT With an example of COMS and explain what has been changed in the test script language.

  • PDF

Reengineering Black-box Test Cases (블랙박스 테스트 케이스의 리엔지니어링)

  • Seo Kwang-Ik;Choi Eun-Man
    • The KIPS Transactions:PartD
    • /
    • v.13D no.4 s.107
    • /
    • pp.573-582
    • /
    • 2006
  • Black-box testing needs to prepare fitting test data, execute software, and examine the result. If we test software effectively, not only selecting test cases but also representing test cases are important. In static testing effectiveness of testing activities also depends on how to represent test cases and checklist to validate. This paper suggests a method for finding ineffective critical test cases and reengineering them. An experiment of reengineering digital set-top box software shows the process and results of checking effectiveness and conformance of current test cases and patching test cases. The result shows how much save the test time and improve test coverage by reengineering test cases. Methods of reuse and restructuring test cases are also studied to fit into embedded product-line software.

Evaluation for High Strength Concrete using Pullout Test (인발법을 이용한 고강도 콘크리트 구조물의 강도평가방법)

  • Ko, Hune-Bum
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.85-91
    • /
    • 2008
  • Out of all the nondestructive test (NDT) methods, the pullout test is one of the most reliable techniques for estimating the strength of concrete under construction. However the pullout test inevitably produces significant surface damage because of the inherent test mechanism and costs too much for using measurement devices. In the view of construction engineers and inspectors, the main purpose of NDT methods for concrete is to verify whether the concrete strength of structure members exceeds the target strength or not. In this paper, a new pullout test method, which involves a pre-installed breaking bolt, with pre-determined breaking torques corresponding to the target strength of concrete, is introduced with related test data. The three types of test, the rebound hammer test, the pullout test, and the new pullout test with breaking bolt, were carried out on wall specimen with three types of concrete strengths. Our results show that concrete strength as evaluated by the pullout test with breaking bolt was similar with cylinder test results. Therefore it can be said that the new pullout test with breaking bolt is a useful method for checking the concrete strength without any surface damages in construction site.

Transiting test method for galloping of iced conductor using wind generated by a moving vehicle

  • Guo, Pan;Wang, Dongwei;Li, Shengli;Liu, Lulu;Wang, Xidong
    • Wind and Structures
    • /
    • v.28 no.3
    • /
    • pp.155-170
    • /
    • 2019
  • This paper presents a novel test method for the galloping of iced conductor using wind generated by a moving vehicle which can produce relative wind field. The theoretical formula of transiting test is developed based on theoretical derivation and field test. The test devices of transiting test method for aerodynamic coefficient and galloping of an iced conductor are designed and assembled, respectively. The test method is then used to measure the aerodynamic coefficient and galloping of iced conductor which has been performed in the relevant literatures. Experimental results reveal that the theoretical formula of transiting test method for aerodynamic coefficient of iced conductor is accurate. Moreover, the driving wind speed measured by Pitot tube pressure sensors, as well as the lift and drag forces measured by dynamometer in the transiting test are stable and accurate. Vehicle vibration slightly influences the aerodynamic coefficients of the transiting test during driving in ideal conditions. Results of transiting test show that the tendencies of the aerodynamic coefficient curve are generally consistent with those of the wind tunnel tests in related studies. Meanwhile, the galloping is fairly consistent with that obtained through the wind tunnel test in the related literature. These studies validate the feasibility and effectiveness of the transiting test method. The present study on the transiting test method provides a novel testing method for research on the wind-resistance of iced conductor.

The Architecture Model for Defense Systems Test Works based on Systems Engineering (SE기반 무기체계 시험업무 아키텍처 모델 연구)

  • Taeheum Na;Dongeun Heo;Youngmin Kim;Jooyeoun Lee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.27 no.2
    • /
    • pp.203-212
    • /
    • 2024
  • This paper describes the establishment of defense systems test works architecture model for the efficient operation of an expanded test organization and the provision of standardized test services after the integration of proving grounds in ADD. The system engineering vee model is applied to the defense system test works to define the project management model and the unit-test management model. In order to establish the defense systems test works architecture model, the process flow of test works, artifacts by life cycle, and interrelations between regulations and test works are explained, and Integrated Test Information System for implementation of architecture model is discussed. Through the defense systems test works architecture model presented in this study, it will contribute to quickly responding to the test requirements of complex and diverse defense systems, efficiently managing projects, and providing standardized test services.

Performance evaluation facilities and evaluation methods for hydropower equipment (해외 수력발전설비 성능평가설비 및 평가 방법)

  • Kim, Youngjoon;Kim, Yongyeol;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.194-194
    • /
    • 2010
  • The variable demand on the energy market, as well as the limited energy storage capabilities, requires a great flexibility in operating hydraulic turbines. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and/or maximum steady-state runaway speed, as well as guarantees related to cavitation. Performance test are conducted by the test standard. Test codes based on extensive research data are written under the leadership of an IEC. Performance evaluation is carry out several test(performance test, cavitation test and runaway test). The paper presents the international turbine test laboratory and performance test standard.

  • PDF

SHIP RESISTANCE AND PROPULSION PERFORMANCE TEST USING HYBRID MESH AND SLIDING MESH (Hybrid mesh 및 sliding mesh를 이용한 선박 저항추진 성능 시험)

  • Park, Bum-Jin;Rhee, Shin-Hyung
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.77-83
    • /
    • 2009
  • In this study, we conducted resistance and propulsion performance test of ship composed of the Resistance Test, Propeller Open Water Test and Self Propulsion Test using the CFD(Computational Fluid Dynamics). We used commercial RANS(Reynolds Averaged Navier Stokes equation) solver, as a calculating tool. The unstructured grids were used in a bow and stern of ship, having complex shape, for a convenience of generating grids, and the structured grids were adopted in a central hull and rest of hull having a relatively simple shape which is called hybrid grid method. In addition, The sliding mesh method was adopted to rotate a propeller directly in the Propeller Open Water and Self Propulsion Test. The Resistance Test and Self Propulsion Test were calculated using Volume of Fluid (VOF) model and considering a free surface. And all The three cases were applied realizable k-epsilon model as the turbulence model. The results of calculations were verified for the suitability of calculations by comparing MOERI's EFD results.

  • PDF

Reliability assessment test for heavy sluice gate of hydraulic cylinder (수문용 대형 유압실린더의 신뢰성 평가)

  • 이용범;현동수;김형의;이근호;정동수
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.91-97
    • /
    • 2001
  • These Study are for the development of the reliability assessment test code and test equipment and test procedures of the heavy sluice gate hydraulic cylinder. Because there is no reliability test code for the heavy sluice gate hydraulic cylinder inside and outside of the country, the modified reliability test code is made reference for the related existing standards like as ISO, JIS, MIL, TUV, DIN, KS and etc. In this study, the novel method is proposed to evaluate efficiency of the heavy sluice gate hydraulic cylinder on the loading conditions and established the conditions of the acceleration life test to reduce the testing time and cycles. The testing equipments for life test, lode operating test, high and low temperature test and salt spray test have been established for 8 month, and the reliability tests are accomplished. The test results of the heavy sluice gate hydraulic cylinder which is produced and tested initially in Korea are satisfied the durability life cycle on the using conditions.

  • PDF

A Design Scheme of Online Test and Evaluation System (온라인 시험 및 평가 시스템 설계 방안)

  • Choi, Kyungsoo;Lee, Kilhung
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.13 no.1
    • /
    • pp.13-21
    • /
    • 2017
  • This paper describes a design scheme of a system that tests or polls from the students at online class. By online test, the teacher can test the pre-knowledge level of the students and know how much students understand the lecture of the class. As the number of test increases, the burden of the preparation of setting question, evaluation of the test, and management of the test results is increased. In this environments, an online test management system make it easy to test and evaluate, and thus it would be a good tool for maintaining and managing the total procedure of the test or poll of the students. For evaluating the design of the system, we made a test system prototype and performed evaluations of the online test system. The online test and evaluation system provides a good tool for testing and evaluation of student's knowledge at the class with easy and fast way.

Design and Implementation of the Automatic cable assembly test system that can test cable assembly effectively

  • Jang, Ki-Mang
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.7
    • /
    • pp.1-10
    • /
    • 2018
  • In this paper, we propose the principles and design details of Automatic cable assembly test system and show its utility. Testing the cable assembly is required periodically or non-periodically in the system that the cable assembly performance is quite important like military equipment. There are several weaknesses when humans test the cable assembly manually. It not only takes much time but also could happen human error. To improve these disadvantages, I developed Automatic cable assembly test system. The system can be implemented by building switching control system that connect and disconnect the cable assembly and measuring devices. Through the result of the cable assembly test with this test system, we show this system makes test time short and improves of test reliability as compared with manual test.