• 제목/요약/키워드: temporary retaining system

검색결과 36건 처리시간 0.02초

가설흙막이의 버팀대 선행하중량과 흙막이 벽체 변형등에 대한 분석

  • 김학청;정광렬
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.35-44
    • /
    • 2006
  • Supporting method of a Temporary retaining wall for underground excavation project are adopted by systems of strut, anchor, nail, raker, etc. Strut system and Raker system of these methods are mostly used preloading jack to minimize deformations of retaining wall. We determinate efficient preloading to analysis these strut-preloadings, deformations of retaining wall, axial forces, and etc.. This study is analysed that preloading applied 0%, 10%, 20%, 30%, ...., 100% for strut and raker installed by CIP temporary retaining wall. This study results that adequate preloadings were determined to analysis correlations of preloading, deformations of wall, maximum bending moment, axial force of strut, and displacement of surrounding.

  • PDF

APPLICATION OF USN TECHNOLOGY FOR MONITORING EARTH RETAINING WALL

  • Sungwoo Moon;Eungi Choi;Injoon Kang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.517-520
    • /
    • 2013
  • In construction operation, the temporary structure is used to support designed facilities or to provide work spaces for construction activities. Since the structure is used only during the construction operation, the operation may be given insufficient attention. The contractor is likely to try to save cost on the material and labor cost. This contractor's behavior frequently leads to construction accidents. In order to prevent accidents from the failure, the operation should be carefully monitored for identifying the effect of dynamics in the surrounding site area. Otherwise, any unexpected adversary effect could result in a very costly construction failure. This study presents the feasibility of the ubiquitous sensor network (USN) technology in collecting construction data during the construction operation of earth retaining walls. The study is based on the result at the Construction System Integration Laboratory (CSIL) at the Pusan National University. A USN-based system has been developed for monitoring the behavior of the temporary structure of earth retaining walls. The data collected from the sensors were used to understand the behavior of the temporary structure. The result of this study will be used in increasing the safety during the construction operation of retaining walls.

  • PDF

좌표측정 센서시스템을 이용한 흙막이 변위 계측 (Measurements of Earth Retaining Wall using Coordinate Sensor System)

  • 노태성;임홍철;한병원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2015
  • Measurements of temporary earth retaining wall during construction are essential for the safety and control of building under construction. As there is a rapid development in sensor technologies, new system of coordinate sensor is developed and applied to a construction site. The new system is capable of measuring three dimensional coordinates continuously over time. It makes possible to monitor the behavior of the temporary earth retaining wall real-time. In this paper, the results of such measurements are provided with real data.

  • PDF

가설공사 안전관리를 위한 무선계측 시스템 적용 (Application of Wireless Measurement System for Safety Management of Temporary Substructures)

  • 인치훈;임홍철;이근우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.21-24
    • /
    • 2009
  • This study deals with the application of USN wireless inclinometer sensor for earth retaining structure safety measurement, The application of wireless inclinometer sensor has great advantage about real-time monitoring of earth retaining structure, It allows a construction manager to monitor movement data from anywhere connected through internet during the process of excavation for substructures of buildings, To validate the applicability of the wireless inclinometer sensor. laboratory and field tests have been performed, The results have shown that the measured values of wireless inclinometer sensor represent the behavior of H-pile well, Both convenience of sensor installation and real-time monitoring of earth retaining structure are confirmed, The proposed wireless measurement system provides a good basis for exact measurement of temporary substructures, More measurements and application are expected for the other excavation sites with various conditions.

  • PDF

임시구조물로서 분리형 보강토 옹벽의 적용사레 (The Application of KOESWall System as a Temporary Structure)

  • 김영윤
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 토목섬유 특별세미나
    • /
    • pp.53-58
    • /
    • 2000
  • The KOESWall system that minimizes the horizontal deformation of reinforced wall effectively was developed bt E&S Eng. Co., Ltd. in 1999. Due to its systematical feature i.e. isolated construction method. KOESWall system is able to use as temporary structures more economically without the facing block. In this report, it is shown that the case history of KOESWall as a temporary soil retaining structure and the field measuremnets.

  • PDF

쏘일네일링 공법을 적용한 영구 지하굴착 벽체의 설계사례 연구 (Design Case Study of Permanent Excavation Wall Using Soil Nailing System)

  • 박시삼;이제만;유찬호;김홍택
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.84-91
    • /
    • 2005
  • In case of soil nailing system, there have been many attempts to expand into slope and temporary earth retaining system stabilization method since the first ground excavation earth retaining system construction in 1993. Recently, jointing wall, underground wall of buildings and excavation earth retaining wall, construction were increasingly applied for effective utilization of the limited underground space and land application maximized. However, the application of joining wall into retaining wall or building by temporary soil nailing system and design of permanent wall were performed by using Rankine earth pressure theory without considering the distribution of earth pressure in the soil nailing. In this study was performed to introduce the design case by 'Two-Body Translation mechanism (TBTM)' to be able to consider distribution of earth pressure in the soil nailing when designing the permanent jointing wall using soil nailing system for effective utilization of ground space. Also, this study attempts to evaluate the earth pressure change, decreasing effect of wall displacement and increasing effect of stability when advanced soil nailing system is constructed using $FLAC^{2D}$ ${\nu}er.$ 3.30 program and 'Two-Body Translation mechanism'.

  • PDF

다양한 형태의 2열 자립식 흙막이 공법 시공사례 연구 (A Case Study on the Self-Supported Earth Retaining Wall with Different Formations)

  • 심재욱;김경철;손성곤;박영진;임종철
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1039-1049
    • /
    • 2010
  • Excavation support systems are the temporary earth retaining structures that can prevent the lateral movement of soils. The systems are initially performed before other construction operations and have a great impact on the entire construction period. The temporary support system in Korea have been carried out generally along with installing supports, which are struts, tiebacks, and rakers. However, most of existing support systems in application relatively have limitations such as cost increase, construction configuration, and displacement occurred with support systems. Thus, a new retaining support system (referred to as the SSR, New Construction Technology No. 533) was developed to solve the aforementioned problems. This study introduces the design, construction, and maintenance of the SSR system under the different construction conditions. The behavior and characteristics of the SSR system were identified based on the case studies.

  • PDF

흙막이 가시설 구조물의 무선원격계측관리시스템에 관한 연구 (A study on the Remote Control System for Measuring Gradient of temporary earth retaining structure)

  • 우종열;홍성욱;김상원;서용칠;신찬호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.49-52
    • /
    • 2011
  • This study concerned with the retention structures or inverted temporary building for displacement measurement in the underground soil after drilling a vertical tilt sensor attached to the vertical distance required to maintain a real-time measurement and management in order to install the wireless measuring devices installed in the field through remote control and management program for the safety of retaining structures temporary building be found on the internet in real time temporary building the retention is to develop a safety management system. And based on this technology to monitor the future status of the various structures possible to add a variety of sensors and Life Cycle Prediction of the structure and needs to evolve into intelligent systems and wireless networks using wireless communications infrastructure systems based on expanding domestic market penetration by developing instrumentation pioneer in overseas markets as well as the activation can also be judged.

  • PDF

APPLICATION OF WIRELESS INCLINOMETER FOR DISPLACEMENT MEASUREMENT OF TEMPORARY EARTH RETAINING PILE

  • Chi Hun In;Hong Chul Rhim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.218-223
    • /
    • 2009
  • During the process of excavation for substructures of buildings, precise and constant measurements of retaining wall displacement is crucial for construction to be complete and safe. Currently an inclinometer is used to measure displacement around the perimeter of an excavation site. The existing inclinometer system requires an instrument to be placed inside pre-bored holes for each measurement with an typical interval of two weeks. This makes it difficult to obtain continuous displacement data, especially during a critical time such as rainy season in summer. Also, the existing inclinometer is placed at certain distance away from the retaining wall system itself. Thus, exact measurement of retaining wall movement is compromised because of the distance between the retaining wall and the inclinometer. This paper presents the development of wireless inclinometer system for the displacement measurement of retaining walls by being attached directly to the retaining wall. The result of the application of the developed systems are provided with advanced ubiquitous sensor network (USN) system features. The USN technique incorporated into the system enables users to monitor movement data from wherever possible and convenient such as construction manager's office on site or any other places connected through internet. The research work presented in this paper will provide a basis to save construction time and cost by preventing safe-related unexpected delay of construction due to the failure or collapse of retaining walls.

  • PDF

분리형 보강토 옹벽의 개발 및 적용사례 (The Development and Application of KOESWall System)

  • 김영윤
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.323-328
    • /
    • 2001
  • In the ordinary reinforced earth wall, which was constructed by incremental construction method, the horizontal deformation of the facing due to the compaction induced horizontal earth pressure was unavoidable. Thus the KOESWall system which are adopted the isolated construction method was developed by I&S Eng. Co., Ltd. in 1999. Due to its systematical feature, KOESWall system is able to minimizes the horizontal deformation of reinforced wall effectively and it can be used as temporary structures more economically without the lacing block. In this report, it is shown that the concept and case histories of KOESWall system as a retaining structures.

  • PDF