• Title/Summary/Keyword: technology demonstration

Search Result 605, Processing Time 0.026 seconds

Low Pressure Firing Tests of 75-tonf-Class Channel Cooling Thrust Chamber (75톤급 채널냉각 연소기 저압연소시험)

  • Lim, Byoung-Jik;Han, Yeoung-Min;Kim, Jong-Gyu;Choi, Hwan-Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.15 no.1
    • /
    • pp.69-75
    • /
    • 2011
  • Firing tests have been carried out for a technology demonstration model of 75-tonf-class combustor which is to be used on the liquid rocket engine of a Korean space launch vehicle. Firing tests were done at 50% of the nominal flow rate because of incapability of the test facility and limit of the test bed strength. Through the low pressure firing tests of 75-tonf-class channel cooling thrust chamber, operability and stability at the ignition and combustion phases were confirmed. Additionally it was foreseen that the 75-tonf-class thrust chamber would satisfy the performance requirements.

Low Pressure Firing Tests of 75-tonf-Class Channel Cooling Thrust Chamber (75톤급 채널냉각 연소기 저압연소시험)

  • Lim, Byoung-Jik;Han, Yeoung-Min;Kim, Jong-Gyu;Seo, Seong-Hyeon;Ahn, Kyu-Bok;Kim, Mun-Ki;Lee, Kwang-Jin;Choi, Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.05a
    • /
    • pp.71-74
    • /
    • 2010
  • Using the technology demonstration model of 75-tonf-class combustor which is expected to be used to the rocket engine of a korean space launch vehicle, 2 times of firing tests were carried out. Firing tests were done at 50% of the nominal flow rate because of incapability of the test facility and limit of the test bed strength. Through the low pressure firing tests of 75-tonf-class channel cooling thrust chamber, reliability and stability at the ignition and combustion phases were confirmed. Additionally it was foreseen that the 75-tonf-class thrust chamber would satisfy the performance requirements.

  • PDF

Study on bidirectional fluid-solid coupling characteristics of reactor coolant pump under steady-state condition

  • Wang, Xiuli;Lu, Yonggang;Zhu, Rongsheng;Fu, Qiang;Yu, Haoqian;Chen, Yiming
    • Nuclear Engineering and Technology
    • /
    • v.51 no.7
    • /
    • pp.1842-1852
    • /
    • 2019
  • The AP1000 reactor coolant pump is a vertical shielded-mixed flow pump, is the most important coolant power supply and energy exchange equipment in nuclear reactor primary circuit system, whose steadystate and transient performance affect the safety of the whole nuclear island. Moreover, safety demonstration of reactor coolant pump is the most important step to judge whether it can be practiced, among which software simulation is the first step of theoretical verification. This paper mainly introduces the fluid-solid coupling simulation method applied to reactor coolant pump, studying the feasibility of simulation results based on workbench fluid-solid coupling technology. The study found that: for the unsteady calculations of the pure liquid media, the average head of the reactor coolant pump with bidirectional fluid-solid coupling decreases to a certain extent. And the coupling result is closer to the real experimental value. The large stress and deformation of rotor under different flow conditions are mainly distributed on impeller and idler, and the stress concentration mainly occurs at the junction of front cover plate and blade outlet. Among the factors that affect the dynamic stress change of rotor, the pressure load takes a dominant position.

Demonstration-scale Offshore CO2 Storage Project in the Pohang Basin, Korea (포항분지 해상 중소규모 CO2 저장 실증연구)

  • Kwon, Yi Kyun
    • The Journal of Engineering Geology
    • /
    • v.28 no.2
    • /
    • pp.133-160
    • /
    • 2018
  • $CO_2$ storage is a very important technology for reduction of greenhouse gas emissions and has been considered as almost the only viable and effective option for immediate large-scale $CO_2$ sequestration. Small-scale demonstration project for offshore $CO_2$ storage in the Pohang Basin is the transitional stage R&D program for technological preparation of large-scale $CO_2$ storage project in Korea. Through the extensive exploration research for prospective $CO_2$ storage sites, the offshore strata in the Pohang Basin was recommended for the storage formation of the small-scale demonstration project. The Pohang Offshore Storage Project launched at 2013, and has accomplished the technical demonstration and technological independence in a wide range of $CO_2$ storage technology, such as geophysical exploration, storage site characterization, storage design, offshore platform construction, injection-well drilling and completion, deployment of injection facility, operation of $CO_2$ injection, and $CO_2$ monitoring. The project successfully carried out $CO_2$ test injection in early 2017, and achieved its final goal for technical development and demonstration of $CO_2$ storage in Korea. The realization of $CO_2$ injection in this project is the measurable result and has been recorded as the first success in Korea. The Pohang Offshore Storage Project has a future plan for the continuous operation of $CO_2$ injection and completion of $CO_2$ monitoring system. The project has provided in-house technical and practical expertises, which will be a solid foundation for the commercial-scale $CO_2$ storage business in Korea. Additionally, the project will help to secure national technical competitiveness in growing international technology market for $CO_2$ storage.

Stream Eco-corridor Restoration by Out-aged Small Dam Removal - Focused on Gokreung River Gokreung 2 Small Dam Removal - (기능을 상실한 보 철거를 통한 하천생태통로 복원 - 곡릉천 곡릉2보 철거를 대상으로 -)

  • Ahn, Hong Kyu;Woo, Hyoseop;Rhee, Dong Seop;Kim, Kyu Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.2
    • /
    • pp.40-54
    • /
    • 2008
  • Small and large dams are installed in the course of a stream for maintaining the water level of the stream or obtaining agricultural water. Currently about 18,000 of them are installed in Korea to supply water. However, the environmental problems of small dams are well known : the interruption of stream eco-corridors, deterioration of water quality in the upper reaches of the small dam, changes in the habitats of riparian organisms, damages to the stream scenery. In a very few of these small dams artificial eco-corridors like fishways are installed, but the number is very minimal.Accordingly, to efficiently restore stream eco-corridors by removing these small dams, it will be necessary to closely examine physical impacts, such as changes in the riverbed and changes in the shape of the stream caused by the removal, chemical impacts, such as changes in water quality, and transport and accumulation of contaminated sediments and biological impacts, such as changes in the habitats of organisms, and develop related technologies in advance, and have these technologies verified through demonstration application in the sites. In this study, we analyzed the physical, chemical and ecological impacts of the removal of the above-mentioned small dams, and conducted a research on the demonstration small dam removal project for a spot investigation. As a result, the small dam removal will restore the eco-corridor, there by improving the habitat of fishes and crustaceans. The number of major underwater organisms inhabiting the Gokreungcheon, such as Korean spotted sleepers, Chinese minnows, Microphysogobio yaluensis, Abbottina rivularis, stone morokos, striped shinners, long-nosed barbels, and Chinese mitten crabs, is expected to increase, and the food chain in the ecosystem will improve so that species diversity will improve as well.

Design and Demonstration of All-Optical XOR, AND, OR Gate in Single Format by Using Semiconductor Optical Amplifiers (반도체 광증폭기를 이용한 다기능 전광 논리 소자의 설계 및 측정)

  • Son, Chang-Wan;Yoon, Tae-Hoon;Kim, Sang-Hun;Jhon, Young-Min;Byun, Yung-Tae;Lee, Seok;Woo, Deok-Ha;Kim, Sun-Ho
    • Korean Journal of Optics and Photonics
    • /
    • v.17 no.6
    • /
    • pp.564-568
    • /
    • 2006
  • Using the cross-gain modulation (XGM) characteristics of semiconductor optical amplifiers (SOAs), multi-functional all-optical logic gates, including XOR, AND, and OR gates are successfully simulated and demonstrated at 10Gbit/s. A VPI component maker^TM simulation tool is used for the simulation of multi-functional all-optical logic gates and the10 Cbit/s input signal is made by a mode-locked fiber ring laser. A multi-quantum well (MQW) SOA is used for the simulation and demonstration of the all-optical logic system. Our suggested system is composed of three MQW SOAs, SOA-1 and SOA-2 for XOR logic operation and SOA-2 and SOA-3 for AND logic operation. By the addition of two output signals XOR and AND, all-optical OR logic can be obtained.

Nondestructive Measurement of the Coating Thickness in the Simulated TRISO-Coated Fuel Particle Using Micro-Focus X-ray Radiography (마이크로포커스 X-선 투과 영상을 이용한 모의 TRISO 핵연료 입자 코팅 층 두께 비파괴 측정)

  • Kim, Woong-Ki;Lee, Young-Woo;Park, Ji-Yeon;Park, Jung-Byung;Ra, Sung-Woong
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.26 no.2
    • /
    • pp.69-76
    • /
    • 2006
  • TRISO(tri-isotropic)-coated fuel particle technology is utilized owing to its higher stability at a high temperature and Its efficient retention capability for fission products In the HTGR(high temperature gas-reeled reactor). The typical spherical TRISO fuel panicle with a diameter of about 1mm is composed of a nuclear fuel kernel and outer coating layers. The outer coating layers consist of a buffer PyC(pyrolytic carbon) layer, Inner PyC(1-PyC) layer, SiC layer, and outer PyC(O-PyC) layer Most of the Inspection Items for the TRTSO-coated fuel particle depend on destructive methods. The coating thickness of the TRISO fuel particle can be nondestructively measured by the X-ray radiography without generating radioactive wastel. In this study, the coaling thickness for the simulated TRISO-coated fuel particle with $ZrO_2$ kernel Instead of $%UO_2$ kernel was measured by using micro-focus X-ray radiography with micro-focus X-ray generator and flat panel detector The radiographic image was also enhanced by image processing technique to acquire clear boundary lines between coating layers. The coaling thickness wat effectively measured by applying the micro-focus X-ray radiography The inspection process for the TRISO-coated fuel particles will be improved by the developed micro-focus X-ray radiography and digital image processing technology.

Making of Smart Structures by means of Piezoceramics and its performance tests (압전세라믹을 이용한 지능구조물의 제작 및 성능실험)

  • Heo, Seok;Kwak, Moon-Kyu
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.1321-1326
    • /
    • 2000
  • This paper is concerned with the making of smart structrures by means of piezoceramic wafers and its performance tests. It is also concerned with the implementation of the PPF controller by using the quad operational amplifier, which includes the charge and bridge amplifiers. The problems regarding the implementation of the piezoceramic sensors and actuators are discussed. The experimental process for smart structures is explained in detail. The technology demonstration which can show the effectiveness of smart structure technology is built up. Experimental results will follow.

  • PDF

JAXA TechCLEAN Project

  • Futamura, Hisao;Hayashi, Shigeru
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.03a
    • /
    • pp.628-637
    • /
    • 2008
  • The JAXA's TechCLEAN project(2003-present) is summarized, with the interim technical achievements. TechCLEAN is collateral program with the NEDO engine project to accelerate R&D work of small passenger aircraft engine as well as to develop innovative environment technologies applicable to the future improvements. In the project NOx reduction, CO2 reduction and noise reduction are targeted. Component level researches and system demonstrator validation are planned with test facility renovation and demonstration base engines.

  • PDF

The Design and Implementation of AMI System Using Binary CDMA (Binary CDMA 기반의 AMI 시스템 설계 및 구현)

  • Joe, In-Whee;Jeong, Jong-Yuel
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.37 no.8C
    • /
    • pp.663-669
    • /
    • 2012
  • To solve the energy problem and finding new growth engines, interest for the smart grid is increasing and related technologies are making great efforts to secure in the world. AMI (Advanced Metering Infrastructure) Among them is the first to be constructed and getting attention as a key component of smart grid. A fusion of various technologies in technology development and demonstration is underway on Jeju Island Smart Grid Demonstration Complex in Korea, and focusing on broadband power line communication technology infrastructure is actively underway in Korea Electric Power Corporation. AMI system using power line communication technology without building a separate communication lines are available for power supply lines, but communication is impossible in occurs because admission to the power company or the ideal infrastructure for communication is not considered. In this paper, we analyze the requirements to build AMI system using Binary CDMA and powerline communications technology, and design the basic communication protocol based on Binary CDMA, implement network management and relay feature. By doing so, ways to apply Ad-hoc Binary CDMA indigenous technology to the AMI system were derived, and could build a system to make use of Wired (PLC) and wireless (Binary CDMA) simultaneously.