위험도 정보를 이용한 Technical Specifications 개선을 위한 정량적 의사 결정 방법론 연구 (A Study on Decision-making Methods for Improving Technical Specifications)

  • 김범석;제무성
    • 한국안전학회지
    • /
    • 제18권2호
    • /
    • pp.86-91
    • /
    • 2003
  • The utility and the nuclear research institutes in korea have conducted research for improving inefficient requirements in technical specifications using the results of probability risk assessments and informations with risk. However, the guidance for reviewing the improved technical specifications has not been developed. The objective of this study is to develop a decision-making framework for investigating and reviewing the technical documents associated with the to changes of technical specification This study has developed a decision-making framework for reviewing the improvements of the RI-TS(Risk-Informed Technical Specifications). This work may contribute to enhancing both the safety and the efficiency of nuclear power plants by changing Technical Specifications proposed by the utility.

시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리 (An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering)

  • 홍대근;변희철;서석환
    • 시스템엔지니어링학술지
    • /
    • 제10권2호
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

무기체계 연구개발사업에서 기술적 위험지표 적용 가능성 분석 (An Analysis of the Applicability of Technical Risk Index in the Weapons System Research & Development Projects)

  • 이선헌;김민준
    • 한국군사과학기술학회지
    • /
    • 제20권6호
    • /
    • pp.835-843
    • /
    • 2017
  • The Technology Readiness Assessment(TRA) has the advantage of identifying immature technologies in promoting weapon system research and development project. However, a more diverse set of information is required for the determination of phase shift and technical risk management for weapons system R&D projects. In this paper, we investigate the various indexes the various indexes proposed to overcome the limitations of the Technology Readiness Level(TRL) and analyze the possibility of applying to the actual weapons system R&D projects. Based on the analysis, it was possible to provide additional information that could not be presented in TRA using technical risk indexes other than TRL, confirming that it could be used for technical risk management for weapons system R&D projects.

연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책 (Project Risk Management & Observational Method for soft ground improvement)

  • 이마니시 하지메
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF

적외선 검출기 개발가능성 및 대안 분석 연구 (A Study on Feasibility Analysis and Alternatives for Infrared Detector Development)

  • 김경수;민성기;김철환
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.123-134
    • /
    • 2004
  • This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons

  • PDF

KSLV-I 사업을 위한 위험관리 프로세스 개발 (Development of Risk Management Process for KSLV-I Program)

  • 유일상;조광래
    • 산업경영시스템학회지
    • /
    • 제29권1호
    • /
    • pp.94-100
    • /
    • 2006
  • The risk management is an organized method for identifying and measuring risk and for selecting, developing, and implementing options for the handling of risk. The risk management covers all programatic and technical factors which affect the system development performance, cost, and schedule. While technical issues are primary concern for systems engineering, the three elements(performance, cost, and schedule) must be balanced for a successful risk management process. This paper proposes the risk management process for the KSLV-I(Korea Space Launch Vehicle-I) program using computer-aided systems engineering tool, Cradle. The risk management process of KSLV-I program is similar to the general risk management process, but it has its own specific features to manage large-scale complex characteristics of KSLV-I program.

높이 20미터 미만인 구조물의 낙뢰리스크 평가 (Lightning Risk Assessment for Structures Lower than 20m High)

  • 이주철;김기현;이영철
    • 조명전기설비학회논문지
    • /
    • 제26권12호
    • /
    • pp.21-27
    • /
    • 2012
  • Korean Industrial Standards for lightning protection system complies with IEC standards. However, the standards are applicable only to buildings and structures more than 20 meters in high. Therefore, it is necessary to determine whether lightning protection system should be installed on structures lower than 20 meters high. This paper proposes an efficient method of assessing risk against lightning of structures lower than 20 meters high. The method suggests simplified lightning protection system and provides selecting an appropriate protection level. The suggested method assumes that structure under assessment has no lightning protection system and there is no person around the structure at the moment of lightning stroke. A simplified method of assessing the risk to human within the structure is developed by adopting the general assessment factor. The selection of a protection level is possible by comparing tolerable risk with physical damage risk caused by a direct lightning. Finally, this paper gives ways to establish surge protection measures when a structure with lightning risk is within a radius of 2km from the assessed structure even if this structure requires no lightning protection system.

IT 아웃소싱에 대한 전략적 인식과 위험이 아웃소싱의 정도에 미치는 영향 (The Effect of Strategic Recognition and Risks of IT Outsourcing on the Degree of Outsourcing)

  • 문용은
    • 한국경영과학회지
    • /
    • 제27권3호
    • /
    • pp.21-40
    • /
    • 2002
  • Recently, IT outsourcing has become a very important management strategy which implements information systems in organizations. This paper investigates the risks and strategic recognition as a key factors affecting on the degree of IT outsourcing. Specifically the risks of IT outsourcing and its four components-risk of control, risk of economical, risk of technical, risk of relational - are examined to be a negative effect on the degree of outsourcing. And strategic recognition about outsourcing is examined how to affect en the risks and the degree of IT outsourcing. To empirically test these relationships, data ere gathered from senior IT managers in 86 corporations. Results of this study show that the degree of outsourcing is strongly influenced by risk of control, risk of economical, risk of relational. But risk of technical does not influence on the degree of outsourcing. And strategic recognition about outsourcing is found that is negative effect on the risks of IT outsourcing and positive effect on the degree of IT outsourcing. The results provide a good framework to minimize the risks for IT outsourcing success.

IS 아웃소싱의 위험과 아웃소싱의 정도에 관한 연구 (The Effect of Risks and Strategic Recognition on the Degree of IT Outsourcing)

  • 문용은;박유진
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제11권1호
    • /
    • pp.1-28
    • /
    • 2002
  • Today, IT outsourcing has become a very important management strategy of implementing information systems in organizations. This paper investigates the risks and strategic recognition as a key factors effecting on the degree of outsourcing, Specifically the risks of outsourcing and its four components-control risk, economical risk, technical risk, relational risk-are examined to be a negative effect on the degree of outsourcing. And strategic recognition about outsourcing is examined to be a mediator factor between the risks and the degree of outsourcing. To empirically test these relationships, data are gathered from senior IT managers in 62 corporations. Results of this study show that the degree of outsourcing is strongly influenced by control risk, economical risk, relational risk. But technical risk does not influence on the degree of outsourcing. And strategic recognition about outsourcing is found that is mediator concern with the risks and the degree of outsourcing. The results indicate to provide a good framework to minimize the risks for IT outsourcing success.

  • PDF

액체로켓 시험설비에서의 위험감소 방법 (A Study on the Risk Reduction Method for Liquid Rocket Test Facility)

  • 이정호;김용욱;베르샤드스키;강선일;조상연;오승협
    • 한국추진공학회지
    • /
    • 제9권3호
    • /
    • pp.120-126
    • /
    • 2005
  • 액체산소(LOx)와 케로신(Kerosene)을 연료로 사용하는 액체로켓엔진 시험설비에서 지상연소시험을 수행할 경우에 발생하는 위험도를 감소시키는 방법을 연구하였다. 본 방법은 잠재적인 사고 발생확률을 낮추고 그에 따른 발생 가능한 손실을 낮추기 위해서 사고 발생 가능한 한계선에 대한 연구와 기술적 해결방법을 바탕으로 하고 있다. 시험설비에서 사고 상황을 야기 할 수 있는 위험한 상황에 관한 개략도와 추진제 유출 사고시 발전 양상 및 발전 프로세스에 대한 도표, 기술적인 해결방법, 위험성 감소 평가 방법을 제시함으로써 기존의 확률적인 통계 값을 바탕으로 하는 것과는 또 다른 방법으로써 위험도 감소를 위한 대안으로 사용하고자 한다.