• Title/Summary/Keyword: team projects

Search Result 384, Processing Time 0.024 seconds

An Exploratory Study on the Major Barriers to the Successful Introduction of New Technology: Focused on the Projects Related with RFID Technology (신기술도입 성공의 주요 장애요인에 관한 탐색적 연구 : RFID기술 관련 프로젝트를 중심으로)

  • Youm, Se-Kyung;Cho, Sung-Ku
    • IE interfaces
    • /
    • v.20 no.2
    • /
    • pp.195-203
    • /
    • 2007
  • A growing number of organizations are considering the adoption of new technologies to enhance their competitiveness. The new projects related with RFID technology are some typical examples: the companies planning to carry out those projects hope that the introduction of new technology into their organization would remedy all their current inefficiencies and eventually bring them considerable economic benefits. However, such successful results would not be obtained if the complicated problems related with S/W and H/W developments, complex team structure or the migration with barcode and etc. are not resolved satisfactorily during the project. In this paper, some potential barriers to successful introduction of new technology, especially that of RFID, are identified and classified into three categories according to the phases of introduction process, i.e., investigation, implementation and application phases. The results of a survey regarding the importance of each barrier, the respondents of which are active developers or consultants of RFID technology, are also given.

Selection of candidate sites for agrivoltaics in Chungnam Province: utilizing AHP analysis and ArcGIS

  • Byung Min Soon;Su Min Cho;Hee Dong Koo;Hyun Seon Lee
    • Korean Journal of Agricultural Science
    • /
    • v.50 no.4
    • /
    • pp.953-966
    • /
    • 2023
  • As the importance of renewable energy diffusion spreads, promotion of sustainable renewable energy projects such as agrivoltaics is expected to accelerate. Furthermore, to promote agrivoltaics projects, it must be considered the legislation related to agrivoltaics and Chungnam Province's local policy. This research focuses on the selection of the most suitable sites for agrivoltaics installations in Chungnam Province in South Korea. Therefore, the process of this research was as follows. First, the legislation related to agrivoltaics and local policy in Chungnam Province were identified. Second, it employs an analytic hierarchy process (AHP) to consider important criteria and their weights for site selection. Third, based on the weights calculated AHP, geographic information system (GIS) was performed to select most suitable location selection of agrivoltaics installations in Chungnam Province. The analysis identified approximately 60 promising most suitable location for agrivoltaics installations in Chungnam Province, primarily in the northern part of Chungnam Province. These areas are expected to meet electricity demands in nearby regions since these are relatively adjacent to Gyeonggi Province. According to the results of research, policy suggestions related to agrivoltaics were presented separately into the agricultural sector and the electricity power sector. The study's results serve as a valuable resource for future national-level candidate site selection for agrivoltaics projects.

Study on the Influence of Stakeholders in Construction Projects

  • Rajeev, S.;Kothai, P.S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.8-11
    • /
    • 2014
  • The interactions and interrelationships between stakeholders largely determine the overall performance of a construction project, and have the crucial responsibility for delivering a project to successful completion. An important component of stakeholder management is stakeholder analysis. Two case studies are conducted within Kerala (India). The main objective was to carry out stakeholder analysis using stakeholder organiser deluxe software, considering the data's collected from the project execution team using questionnaire. During data collection the key stakeholders were identified, to know how to manage them, their interest, power, attitude level etc, for quality improvement. Analyze the results using the software Stakeholder organizer deluxe and modeling of stakeholders is to be done. Finally validate the models of the projects. These findings may mainly reflect the stakeholder management environment in the respective regions of project implementation.

Development of Component of Micro Thermal Device in KAIST (KAIST의 마이크로 열기관 요소 기술 개발)

  • Lee, Dae Hoon;Park, Dae-Eun;Yoon, Euisil;Kwon, Sejin
    • 유체기계공업학회:학술대회논문집
    • /
    • 2002.12a
    • /
    • pp.482-485
    • /
    • 2002
  • Development projects in KAIST rotted to the micro thermal device is introduced. Multi disciplinary research team is composed by combustion group and semiconductor group in KAIST and catalyst research center in KRICT to develop micro thermal/fluidic device and various items are on development. Among the projects, various kind of componenst that is required by the micro thermal devicesystem is introduced. Technology related to development of micro combustor, Micro igniter, micro fabrication of 3D structure, micro reactor and micro catalyst preparation is introduced.

  • PDF

A Study of Improvement Factors in the Construction Phase of the Building Project (건축프로젝트의 질 관리에 있어서 시공분야 개선요소에 관한 연구)

  • Kim, Suk-Hoi;Im, Chil-Soon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.9 no.4
    • /
    • pp.293-300
    • /
    • 2006
  • Utilizing a building model design of the investigation factors and structured questionnaire, the results of an investigation concerning the improvement factors in the construction phase, as perceived by academic staffs including graduate students, designers, contractors and property management teams, are presented. Findings reveal that management commitment dominate improvement factors for building projects, although construction firms frequently mentioned the team work in design firms. Significant improvements in building projects are obtained when college programs include courses that treat the administrative aspects involved in the building project and that continuing education programs cover quality training. Eighteen predominant selection factors are identified, ranked and correlated.

  • PDF

Six Sigma Performance Evaluation System and a Case Study for Order-Based Industry (수주산업의 6시스마 성과 평가체계와 사례)

  • Sung, Su-Gyeong;Yun, Tae-Hong;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.36 no.3
    • /
    • pp.45-54
    • /
    • 2008
  • For successful accomplishment of six sigma innovation, one of the most important factor is performance evaluation and proper compensation. Six sigma project teams are well motivated to perform the projects only when their activities are properly evaluated and reasonable compensations are secured. In this paper, a systematic evaluation system of financial effect of six sigma projects is presented for order-based aerospace industry.

The Application of a New "CIDEAR" Model for Selecting and Evaluating Cross Impact R&D Projects (상호영향형 R&D과제군의 평가선정을 위한 새로운 "CIDEAR" 모형의 적용)

  • 박준호;권철신;홍석기
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.11a
    • /
    • pp.25-28
    • /
    • 2003
  • The $\ulcorner$CIDEAR$\lrcorner$ model proceeds the following six steps : $\ulcorner$Decision Theory & Evaluation Model$\lrcorner$, $\ulcorner$AR Decision & Evaluation Model$\lrcorner$, $\ulcorner$Resource & Performance Analysis Model$\lrcorner$, $\ulcorner$Cross Impact Assumption Model$\lrcorner$, $\ulcorner$Priority Oder Decision Model$\lrcorner$, and $\ulcorner$Efficiency Cause Analysis Model$\lrcorner$ - In this study, twenty-one R&D projects of a leading company in electronic industry are selected to examine the usefulness of the constructed $\ulcorner$CIDEAR$\lrcorner$ model. Simulation method, Excel, Lindo(Linear Interactive and Discrete Optimizer) and Team EC are used in this case study.

  • PDF

How to Efficiently Implement Modernization Projects of process Control Systems (플랜트 계측제어 시스템의 개선과 프로젝트의 효율적인 수행)

  • 최기원
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.4
    • /
    • pp.44-47
    • /
    • 2000
  • Recently number of reinstrumentation projects in the process plants has grown to meet the needs to modernize or upgrade the exsisting control systems in a bid to boost productivity and quality. Design, installation and start-up of these process automation systems can be successful and trouble-free only if decision points are addressed properly. The critical decision points are encountered from tile design through the start-up phases of implementing a modernization project and discussed extensively here on a practical basis. Key points are ;to assign a project manager out of the plant instrument engineers for him to organize and lead a project team. ;to follow three critical steps in designing and implementing. :to think ahead of the critical steps and to induce a positive cooperation from all level of participants in the effort to prevent possible schedule delays.

  • PDF

Architectural Design Process by the Changes of Sustainable Design Guidelines of Public Project (공공프로젝트 친환경 설계지침의 변화에 따른 건축설계프로세스 연구)

  • Tae, Yeong-Ran
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.4
    • /
    • pp.63-70
    • /
    • 2010
  • This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.

Evaluation of Dredging Capability of Pump Dredger based on Soil Conditions (토질변화에 따른 Pump 준설능력 산정)

  • Park, Hong-Shin;You, Young-In;Kim, Ha-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.316-321
    • /
    • 2006
  • The Prouductivity of pump dredger varies very much depend on soil conditions is one of the main factors affecting construction period. Therefore the acculate evaluation of dredging capability of pump dredger considering soil conditions is a main task in dredging projects. After assesing the results of pump dredging on several Gwangyang port projects, some data of Japan standard for pump dredger are similar to those of actual results and a pump dredging capability table is prepared for future evaluation purposes.

  • PDF