• Title/Summary/Keyword: system uncertainty

Search Result 2,446, Processing Time 0.029 seconds

Design and Fabrication of K-band Attenuation Standard (K-대역 감소량 표준기의 설계 및 제작)

  • Lee Joo-Gwang;Kim Jeong-Hwan;Kang Jin-Seob;Kang Tae-Weon
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.17 no.4 s.107
    • /
    • pp.387-392
    • /
    • 2006
  • In this paper, measurement scheme and uncertainty estimation of the K-band attenuation standard fitted with 3.5 mm coaxial connectors are described. The standard comprises a build-up chain of four steps of power ratio mea-surement and operates in the frequency range of 18 GHz to 26.5 GHz. The nominal attenuation of each step is around 20 dB and total dynamic range is 80 dB. The expanded uncertainty of the overall system is 0.01 dB at the confidence level of approximately 95%.

H Controller Design of Flexible Space Structure with the Uncertainty of Damping Ratio (감쇠비 불확실성을 고려한 유연구조물의 H 제어기 설계)

  • Chae, Jang-Su;Park, Tae-Won
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.26 no.4
    • /
    • pp.602-608
    • /
    • 2002
  • The flexible structure like solar array and antenna in spacecraft shows very sensitive responses to the inner or outer disturbance and noise. And the spacecraft becomes more complex and larger as it has various mission and role. But since the spacecraft need to have the limited mass, the thin and light material should be selected and this necessity induces the decrease d natural frequency and structural stiffness. It reduces the ability of adapting to the disturbance and induces the structural unstability. Certainly, the disturbance does not only make the structural unstability, but also give the bad effect to the precise attitude control. So it is necessary to control the vibration in the space. In this paper, the flexible structure control modeling with piezo sensor and piezo actuator is developed. The model uncertainty of damping ratio is overcome by robust control. The system equation is induced by the finite element method.

Effect of a Butterfly Valve on the Uncertainty of Flow Rate Measurement (버터플라이 밸브의 유량측정 불확도에 대한 영향)

  • Yoon, Seok-Ho;Lee, Jung-Ho;Yu, Cheong-Hwan;Park, Sang-Jin;Chung, Chang-Hwan
    • The KSFM Journal of Fluid Machinery
    • /
    • v.13 no.4
    • /
    • pp.18-24
    • /
    • 2010
  • For testing large-capacity pumps, the accurate flow rate measurement is needed in the test loop. As a measuring method of flow rate, venturi tube is recommended due to its low pressure loss. However, upstream disturbance of loop component such as a valve has an effect upon the accuracy of flow rate measurement. For controlling flow rate in case of high flow rate and large-scale piping system, a butterfly-type valve is generally used due to its compactness. However, a butterfly valve disturbs downstream flow by generating turbulence, cavities, or abrupt pressure change. In this study, the effect of downstream disturbance of butterfly valve on the flow rate measurement using a venturi tube is investigated. Test loop consists of circulation pump, reservoir, butterfly valve, venturi tube, and reference flow meter. The test is conducted with regard to a different valve opening angle of butterfly valve. According to the valve opening angle, the uncertainty of flow rate measurement is investigated.

Robust Transceiver Designs in Multiuser MISO Broadcasting with Simultaneous Wireless Information and Power Transmission

  • Zhu, Zhengyu;Wang, Zhongyong;Lee, Kyoung-Jae;Chu, Zheng;Lee, Inkyu
    • Journal of Communications and Networks
    • /
    • v.18 no.2
    • /
    • pp.173-181
    • /
    • 2016
  • In this paper, we address a new robust optimization problem in a multiuser multiple-input single-output broadcasting system with simultaneous wireless information and power transmission, where a multi-antenna base station (BS) sends energy and information simultaneously to multiple users equipped with a single antenna. Assuming that perfect channel-state information (CSI) for all channels is not available at the BS, the uncertainty of the CSI is modeled by an Euclidean ball-shaped uncertainty set. To optimally design transmit beamforming weights and receive power splitting, an average total transmit power minimization problem is investigated subject to the individual harvested power constraint and the received signal-to-interference-plus-noise ratio constraint at each user. Due to the channel uncertainty, the original problem becomes a homogeneous quadratically constrained quadratic problem, which is NP-hard. The original design problem is reformulated to a relaxed semidefinite program, and then two different approaches based on convex programming are proposed, which can be solved efficiently by the interior point algorithm. Numerical results are provided to validate the robustness of the proposed algorithms.

A Study on Simplified Robust Optimal Operation of Microgrids Considering the Uncertainty of Renewable Generation and Loads (신재생에너지와 부하의 불확실성을 고려한 마이크로그리드의 단순화된 강인최적운영 기법에 관한 연구)

  • Lee, Byung Ha
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.513-521
    • /
    • 2017
  • Robust optimal operation of a microgrid is required since the increase of the penetration level of renewable generators in the microgrid raises uncertainty due to their intermittent power output. In this paper, an application of probabilistic optimization method to economical operation of a microgrid is studied. To simplify the treatment of the uncertainties of renewable generations and load, the new 'band of virtual equivalent load variation' is introduced considering their uncertainties. A simplified robust optimization methodology to generate the scenarios within the band of virtual equivalent load variation and to obtain the optimal solution for the worst scenario is presented based on Monte Carlo method. The microgrid to be studied here is composed of distributed generation system(DGs), battery systems and loads. The distributed generation systems include combined heat and power(CHP) and small generators such as diesel generators and the renewable energy generators such as photovoltaic(PV) systems and wind power systems. The modeling of the objective function for considering interruption cost by the penalty function is presented. Through the case study for a microgrid with uncertainties, the validity of proposed robust optimization methodology is evaluated.

Uncertainty Quantification of Propulsion System on Early Stage of Design (추진체계 개념설계단계에서 불확실성 고려방법에 대한 연구)

  • Ahn, Joongki;Um, Ki In;Lee, Ho-il
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.22 no.5
    • /
    • pp.73-80
    • /
    • 2018
  • At the early stages of development of high-speed propulsion systems, associated uncertainties cannot be easily modeled into probabilistic distributions, owing to the lack of test data, cost, and difficulty of simulating real-flight environments on the ground. To tackle this issue, in this research, the combustion efficiencies of dual-combustion ramjet engines are assumed to have been provided by experts and quantified by evidence theory. Using quantified uncertainty, the inlet area and combustor exit are optimized while satisfying reliability margins of thrust and thermal choking. The result shows a reasonable design of the engine under uncertain circumstances.

Time uncertainty analysis method for level 2 human reliability analysis of severe accident management strategies

  • Suh, Young A;Kim, Jaewhan;Park, Soo Yong
    • Nuclear Engineering and Technology
    • /
    • v.53 no.2
    • /
    • pp.484-497
    • /
    • 2021
  • This paper proposes an extended time uncertainty analysis approach in Level 2 human reliability analysis (HRA) considering severe accident management (SAM) strategies. The method is a time-based model that classifies two time distribution functions-time required and time available-to calculate human failure probabilities from delayed action when implementing SAM strategies. The time required function can be obtained by the combination of four time factors: 1) time for diagnosis and decision by the technical support center (TSC) for a given strategy, 2) time for strategy implementation mainly by the local emergency response organization (ERO), 3) time to verify the effectiveness of the strategy and 4) time for portable equipment transport and installation. This function can vary depending on the given scenario and includes a summation of lognormal distributions and a choice regarding shifting the distribution. The time available function can be obtained via thermal-hydraulic code simulation (MAAP 5.03). The proposed approach was applied to assess SAM strategies that use portable equipment and safety depressurization system valves in a total loss of component cooling water event that could cause reactor vessel failure. The results from the proposed method are more realistic (i.e., not conservative) than other existing methods in evaluating SAM strategies involving the use of portable equipment.

A Linear Programming-Based Algorithm for Raw Recycled Material Mixtures in the Aluminum Alloy Fabrication Process (알루미늄 합금 제조공정에서의 선형계획모델 기반 재활용 원재료 혼합 비율 결정 알고리즘)

  • Min-Ju Kang;Ji-Hoon Kim;Kyeong-Jin Song;Yu-Jin Byun;Jae-Gon Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.47 no.2
    • /
    • pp.40-47
    • /
    • 2024
  • As environmental concerns escalate, the increase in recycling of aluminum scrap is notable within the aluminum alloy production sector. Precise control of essential components such as Al, Cu, and Si is crucial in aluminum alloy production. However, recycled metal products comprise various metal components, leading to inherent uncertainty in component concentrations. Thus, meticulous determination of input quantities of recycled metal products is necessary to adjust the composition ratio of components. This study proposes a stable input determination heuristic algorithm considering the uncertainty arising from utilizing recycled metal products. The objective is to minimize total costs while satisfying the desired component ratio in aluminum manufacturing processes. The proposed algorithm is designed to handle increased complexity due to introduced uncertainty. Validation of the proposed heuristic algorithm's effectiveness is conducted by comparing its performance with an algorithm mimicking the input determination method used in the field. The proposed heuristic algorithm demonstrates superior results compared to the field-mimicking algorithm and is anticipated to serve as a useful tool for decision-making in realistic scenarios.

Asynchronous Waste: An Alternative Performance Measure for Pull Production Control System

  • Kim, ll-hyung
    • Management Science and Financial Engineering
    • /
    • v.6 no.1
    • /
    • pp.37-63
    • /
    • 2000
  • An important objective of pull-based production control is to achieve synchronized and smooth production flow in a multi-stage system that is subject to uncertainty. To our knowledge, previous research has not generated a performance measure that captures this objective of pull-based probased production control system. This performance material with respect to the instant when the operation is required. We examine the issue of asynchronous waste in a two-stage kanban control system.

  • PDF

An Artificial Immune system using Memory Cell for the Inventory Routing Problem (기억 세포를 이용한 재고-차량 경로 문제의 인공면역시스템)

  • Yang, Byoung-Hak
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.236-246
    • /
    • 2008
  • We consider the Inventory Routing problem(IRP) for the vending machine operating system. An artificial immune system(AIS) is introduced to solve the IRP. The IPR is an rolling wave planning. The previous solution of IRP is one of good initial solution of current IRP. We introduce an Artificial Immune system with memory cell (AISM) which store previous solution in memory cell and use an initial solution for current problem. Experiment results shows that AISM reduced calculations time in relatively less demand uncertainty.

  • PDF