Thermal-hydro-mechanical Properties of Reference Bentonite Buffer for a Korean HLW Repository (우리나라 고준위폐기물처분장 기준벤토나이트완충재의 열-수리-역학적 특성치)

  • Lee, Jae-Owan;Cho, Won-Jin;Kwon, Sang-Ki
    • Tunnel and Underground Space
    • /
    • v.21 no.4
    • /
    • pp.264-273
    • /
    • 2011
  • Bentonite buffer is one of the major components of an engineered barrier for an HLW (High-Level Waste) repository. The bentonite buffer is significantly exposed to the decay heat from radioactive wastes, the inflow of groundwater from the surrounding rock of the repository, and the high swelling pressure of densely-compacted bentonite that comes in contact with the groundwater. Therefore, it is essential to understand the THM (Thermal-Hydro-Mechanical) behavior of the bentonite buffer and to acquire the input data of its related constitutive models for the performance and safety assessment of an HLW repository. This paper analyzed the THM properties which have been obtained by conducting laboratory tests with a candidate buffer material for a Korean HLW repository. Moreover the formulation recipe of the reference bentonite buffer was defined on the basis of functional criteria, thus suggesting the THM properties which correspond to the formulation recipe of the reference bentonite buffer.

Validation of 3D discrete fracture network model focusing on areal sampling methods-a case study on the powerhouse cavern of Rudbar Lorestan pumped storage power plant, Iran

  • Bandpey, Abbas Kamali;Shahriar, Kourush;Sharifzadeh, Mostafa;Marefvand, Parviz
    • Geomechanics and Engineering
    • /
    • v.16 no.1
    • /
    • pp.21-34
    • /
    • 2018
  • Discontinuities considerably affect the mechanical and hydraulic properties of rock mass. These properties of the rock mass are influenced by the geometry of the discontinuities to a great extent. This paper aims to render an account of the geometrical parameters of several discontinuity sets related to the surrounding rock mass of Rudbar Lorestan Pumped Storage Power Plant powerhouse cavern making use of the linear and areal (circular and rectangular) sampling methods. Taking into consideration quite a large quantity of scanline and the window samplings used in this research, it was realized that the areal sampling methods are more time consuming and cost-effective than the linear methods. Having corrected the biases of the geometrical properties of the discontinuities, density (areal and volumetric) as well as the linear, areal and volumetric intensity accompanied by the other properties related to four sets of discontinuities were computed. There is an acceptable difference among the mean trace lengths measured using two linear and areal methods for the two joint sets. A 3D discrete fracture network generation code (3DFAM) has been developed to model the fracture network based on the mapped data. The code has been validated on the basis of numerous geometrical characteristics computed by use of the linear, areal sampling methods and volumetric method. Results of the linear sampling method have significant variations. So, the areal and volumetric methods are more efficient than the linear method and they are more appropriate for validation of 3D DFN (Discrete Fracture Network) codes.

Flexible and Lined Segment Tunnel for Underground Compressed Air Energy Storage(CAES) (복공식 압축공기 지하저장을 위한 가변성 분할 라이닝 터널기술)

  • Kim, Hyung-Mok;Rryu, Dong-Woo;Chung, So-Keul;Song, Won-Kyong
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.77-85
    • /
    • 2009
  • Flexible and lined segment air-tight tunnelling technology for Compressed Air Energy Storage-Gas Turbine(CAES-G/T) power generation was introduced. The distinguished characteristics of the air-tight tunnel system can be summarized by two facts. One is that the high inner pressure due to compressed air is sustained by surrounding rock mass with allowing sufficient displacement of lining segment. The other is that the air-tightness of storage tunnel was enhanced by adopting a specially designed rubber sheet. The flexible lined air-tight underground tunnel can be constructed at a comparatively shallow depth and near urban area so that the locally distributed CAES-G/T power generation can be accomplished. In addition, this air-tight tunnelling technology can be applied to a variety of energy underground storage tunnels such as Compressed Natural Gas(CNG), Liquifed Petroleum Gas(LPG), DeMethyl Ether(DME) etc.

Mechanical evolution of radioactive waste repository and rock mass - A review on ANDRA's case - (방사성 폐기물 지층 처분장과 암반의 역학적 특성 변화 - ANDRA의 예 -)

  • Chung, So-Keul;Synn, Joong-Ho
    • Tunnel and Underground Space
    • /
    • v.18 no.3
    • /
    • pp.165-174
    • /
    • 2008
  • Thermo-hydro-chemico-mechanical evolution of the radioactive waste repository and surrounding geological media is one of the key issues for the radioactive waste disposal. This article describes not only the basic context for the site selection but also a reasonable strategy for the repository related research based on the results of the French repository project carried out by ANDRA (National radioactive waste management agency). To have some alternatives for the determination of a preferable depth and geological media, it would be recommendable to establish a database system. The curing process of the fractures or microfissures in the EDZ (Excavation Disturbed Zone) during operation time has to be examined considering the evolution of the EDZ and the reversibility of the repository. It is prerequisite to carry out a feasibility study and to validate the design concept and design parameters in a properly constructed underground research laboratory (URL) in Korea.

Estimation of the zone of excavation disturbance around tunnels, using resistivity and acoustic tomography

  • Suzuki Koichi;Nakata Eiji;Minami Masayuki;Hibino Etsuhisa;Tani Tomonori;Sakakibara Jyunichi;Yamada Naouki
    • Geophysics and Geophysical Exploration
    • /
    • v.7 no.1
    • /
    • pp.62-69
    • /
    • 2004
  • The objective of this study is to estimate the distribution of a zone disturbed by excavation (EDZ) around tunnels that have been excavated at about 500 m depth in pre-Tertiary hard sedimentary rock. One of the most important tasks is to evaluate changes in the dynamic stability and permeability of the rock around the tunnels, by investigating the properties of the rock after the excavation. We performed resistivity and acoustic tomography using two boreholes, 5 m in length, drilled horizontally from the wall of a tunnel in pre-Tertiary hard conglomerate. By these methods, we detected a low-resistivity and low-velocity zone 1 m in thickness around the wall of the tunnel. The resulting profiles were verified by permeability and evaporation tests performed at the same boreholes. This anomalous zone matched a high-permeability zone caused by open fractures. Next, we performed resistivity monitoring along annular survey lines in a tunnel excavated in pre-Tertiary hard shale by a tunnel-boring machine (TBM). We detected anomalous zones in 2D resistivity profiles surrounding the tunnel. A low-resistivity zone 1 m in thickness was detected around the tunnel when one year had passed after the excavation. However, two years later, the resistivity around the tunnel had increased in a portion, about 30 cm in thickness, of this zone. To investigate this change, we studied the relationship between groundwater flow from the surroundings and evaporation from the wall around the tunnel. These features were verified by the relationship between the resistivity and porosity of rocks obtained by laboratory tests on core samples. Furthermore, the profiles matched well with highly permeable zones detected by permeability and evaporation tests at a horizontal borehole drilled near the survey line. We conclude that the anomalous zones in these profiles indicate the EDZ around the tunnel.

Case Study on In-situ Stress Measurement by Over-coring and Its Application to Design of a Pumped Storage Power Plant (오버코어링법에 의한 초기지압측정 및 양수발전소 설계적용사례)

  • Kim, Dae-Young;Lee, Hong-Sung;Lee, Young-Nam
    • Tunnel and Underground Space
    • /
    • v.17 no.2 s.67
    • /
    • pp.90-101
    • /
    • 2007
  • With increasing development of underground space, underground pumped storage power plants, which generate power by felling water in upper reservoir to lower reservoir, have been continuously constructed. For efficient and safe design, construction and maintenance or such power plants, it is very important to understand in-situ stress and the mechanical properties of the surrounding rock mass at the design stage. The power plant presented in this paper is under construction at a depth of $320{\sim}375m$. For stability evaluation of the structure, in-situ stress was measured by over-coring method. Also pressurementer test and a series or laboratory tests were performed to obtain the mechanical properties. Numerical analyses were conducted to check the efficiency of designed support patterns. The results showed that unstable areas occurred partly in the numerical model, and therefore supports were additionally applied. Finally complete stability was obtained and the following excavation has been operated successfully until now.

Source Mechanism Analysis and Simplified Modeling for Rockburst (록버스트 발생기구 분석과 단순화 모델링)

  • Choi, Byung-Hee;Oh, Se-Wook;Kim, Hyunwoo;Jung, Yong-Bok
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.1-14
    • /
    • 2021
  • Rockburst is a sudden and violent failure of rock. During the failure process, excess energy is liberated as seismic energy, which in turn causes the surrounding rock mass to vibrate. The level of the ground vibration can reach a magnitude of over 4.5 in the Richter local scale. Thus, a rockburst can cause not only injury to persons, but also damage to both underground workings and surface structures. In this paper the source mechanism of rockburst is analyzed based mainly on the two reports of the Canadian Rockburst Research Program (CRRP). A simplified LS-DYNA modeling is also performed to identify the tensile failure patterns occurring in the remaining rock mass right after blasting in mine stope. The configuration of the simplified model will probably be useful in small-scale laboratory tests for investigating the source mechanism of rockburst.

Investigation on the Technical Characteristics and Cases of Salt Cavern for Large-Scale Hydrogen Storage (대규모 수소 저장을 위한 암염 공동 저장 기술 특성 및 적용 사례 분석)

  • Seonghak Cho;Jeonghwan Lee
    • Journal of the Korean Institute of Gas
    • /
    • v.28 no.2
    • /
    • pp.7-16
    • /
    • 2024
  • This study presents investigation on the technical characteristics and field cases of the salt cavern storage method for large-scale hydrogen storage. The salt cavern storage method enables effective hydrogen storage compared to other methods due to the low porosity and permeability of the rock salt that constitutes the cavern, which is not likely to leak and requires a small amount of cushion gas for operation. In addition, there is no chemical reaction between rock salt and hydrogen, and multiple injection/withdrawl cycles can be performed making it effective for peak shaving and short-term storage. The salt cavern is formed in three stages: leaching, debrining, and filling, and leakage tests are conducted to ensure stable operation. Field applications are currently performing to meet industrial demand in the surrounding area of four sites in the UK and Texas, USA, and salt cavern operation is being prepared for energy storage in European countries such as Germany and France. The investigated results in this study can be utilized as a basic guideline for the design of future hydrogen storage projects.

Assessment and Damage Reduction Strategy of Acid Rock Drainage in Highway Construction Site: ○○ Highway Construction Site (고속도로 건설현장의 산성배수 발생개연성평가 및 피해저감대책: ○○고속도로건설현장)

  • Lee, Jin-Soo;Kim, Jae Gon;Park, Jeong-Sik;Chon, Chul-Min;Nam, In-Hyun
    • Economic and Environmental Geology
    • /
    • v.46 no.5
    • /
    • pp.411-424
    • /
    • 2013
  • Assessment and damage reduction strategy of acidic rock drainage were conducted in a section of ${\bigcirc}{\bigcirc}$ highway construction site. The geology of the studied section consists of Icheonri sandstone and intermediate to acidic volcanic rocks. Sulfides occur as a disseminated type in sandstone and volcanics which were altered by the hydrothermal solution of granite intrusion. Volcanics and sandstone with a high content of sulfide were classified as a potentially acid rock drainage(ARD) forming rock. The drainage originated from those rocks may acidify and contaminate the surrounding area during the highway construction. Therefore, the drainage should be treated before it is discharged. A slope landslide hazard due to the ARD was also expected and the coating technology was recommended for the reduction of ARD generation as a preemptive measure before reinforcement work for enhancing slope stability such as shotcrete and anchor. According to the ARD risk analysis, those rocks should not be used as cement aggregate, but only to be used as a bank fill material of a filling-up system that allows minimal contact with rainfall and groundwater.

Optimization study on roof break direction of gob-side entry retaining by roof break and filling in thick-layer soft rock layer

  • Yang, Dang-Wei;Ma, Zhan-Guo;Qi, Fu-Zhou;Gong, Peng;Liu, Dao-Ping;Zhao, Guo-Zhen;Zhang, Ray Ruichong
    • Geomechanics and Engineering
    • /
    • v.13 no.2
    • /
    • pp.195-215
    • /
    • 2017
  • This paper proposes gob-side entry retaining by roof break and filling in thick-layer soft rock conditions based on the thick-layer soft rock roof strata migration law and the demand for non-pillar gob-side entry retaining projects. The functional expressions of main roof subsidence are derived for three break roof direction conditions: lateral deflection toward the roadway, lateral deflection toward the gob and vertically to the roof. These are derived according to the load-bearing boundary conditions of the main roadway roof stratum. It is concluded that the break roof angle is an important factor influencing the stability of gob-side entry retaining surrounding rock. This paper studies the stress distribution characteristics and plastic damage scope of gob-side entry retaining integrated coal seams, as well as the roof strata migration law and the supporting stability of caving structure filled on the break roof layer at the break roof angles of $-5^{\circ}$, $0^{\circ}$, $5^{\circ}$, $10^{\circ}$ and $15^{\circ}$ are studied. The simulation results of numerical analysis indicate that, the stress concentration and plastic damage scope to the sides of gob-side entry retaining integrated coal at the break roof angle of $5^{\circ}$ are reduced and shearing stress concentration of the caving filling body has been eliminated. The disturbance of coal mining to the roadway roof and loss of carrying capacity are mitigated. Field tests have been carried out on air-return roadway 5203 with the break roof angle of $5^{\circ}$. The monitoring indicates that the break roof filling section and compaction section are located at 0-45 m and 45-75 m behind the working face, respectively. The section from 75-100 m tends to be stable.