Subway becomes more and more main transportation in major cities. Air pollution in the subway platforms is decreased; however, dust flow inside subway tunnel and train is increased by installing Platform Screen Door. Airflow inside subway tunnel is observed using computational method in this study The airflow characteristics around ventilation shafts and inside the tunnel is studied following the train movement, while the train moves from existing Miasamgeori station to Gireum station ANSYS CFX V12.0.l and ICEM CFD V12.0.l are used to compute the airflow inside the subway tunnel.
Understanding train-wind is the best method to know how to optimize subway ventilation system. The capacity and efficiency of the subway ventilation system are known by pressure and velocity while train runs. Analysis of the internal flow in subway tunnel and around subway station are studied using numerical methods. Characteristics of internal flow and influence of subway ventilation system for the subway station with platform screen door and tunnel are analyzed by unsteady state analysis. Velocity and pressure of train wind transformation are compared at around subway ventilation system and the internal flow is investigated at the subway tunnel.
Recently, subways in the city are formed a vast underground network which is interfered with construction when large-scale infrastructure will be planned to nearby existing subway tunnels. Researches have been restricted to estimate stability of existing subway tunnel due to adjacent excavation causued by small construction such as buildings. In this paper, OO underpass is planned on the top of existing subway tunnel, which will be need large-scale excavation, is selected as a subject of study. And the purpose of this study is to analyze the effects on existing subway tunnel due to excavation by stages on construction of underpass. The 3D-numerical analysis was performed by using the MIDAS/GTS program. The stability on existing subway tunnel caused by sequential excavation is analysed using numerical results. Based on the analysis, the excavation orders and reinforcement methods was suggested for stability of exiting subway tunnel.
This study carried out several kinds of investigations such as geology, hydrogeology, groundwater level and quality, surface-water quality, and the quantity and quality of groundwater discharge from the subway to identify the causes of groundwater contamination around the subway tunnel at Suyeong District in Busan City. Geostatistical analyses were also conducted to understand the characteristics of groundwater level and quality distributions. There are Kwanganri Beach and Suyeong River in the study area, which are basically influenced by seawater. The total quantities of groundwater utilization and groundwater discharge from the subway tunnel in Suyeong District are 2,282,000 $m^3$/year, which is 2.4 times larger than the sustainable development yield of groundwater. The lowest groundwater level around the subway tunnel is about 32 m below the mean sea-level. The large drawdown of groundwater led to the inflow of seawater and salinized river water toward the subway tunnel, and therefore the quality of groundwater didn't satisfy the criteria of potable, domestic, agricultural and industrial uses. Distribution maps of groundwater level and qualities produced by kriging were very useful for determining the causes of groundwater contamination in the study area. The distribution maps of electrical conductivity, chloride and sulfate showed the extent of seawater intrusion and the forceful infiltration of the salinized Suyeong River. This study revealed that seawater and salinized river water infiltrated into the inland groundwater and contaminated the groundwater around the subway tunnel, because the groundwater level was seriously drawdowned by groundwater discharge from the subway tunnel. The countermeasure for the minimization of groundwater discharge from the subway tunnel is necessary to prevent the groundwater obstacles such as groundwater depletion, groundwater-quality deterioration, and land subsidence.
Journal of Korean Society for Atmospheric Environment
/
v.33
no.6
/
pp.593-604
/
2017
The suspended particulate matter(PM) was measured in subway tunnel of Seoul Line 1 to 9 in order to evaluate the pollution degree and characteristics of the PM in the subway tunnel. Also, to analyze the effect of outdoor aerosol concentration on the PM concentration of subway tunnels, the ambient PM concentration around the subway station was extracted by spatial analysis using $PM_{10}$ data of Seoul air pollution monitoring network. Finally, in order to understand pollution pattern in the Seoul subway tunnels, cluster analysis was performed based on input data set such as PM levels in tunnel, tunnel depth, length, curvature radius, outdoor ambient air pollution levels and so on. The average concentration of $PM_{10}$, $PM_{2.5}$, and $PM_1$ on subway tunnels were $98.0{\pm}37.4$, $78.4{\pm}28.7$, and $56.9{\pm}19.2{\mu}g/m^3$, respectively. As a result of the cluster analysis, tunnels from Seoul subway Line-1 to Line-9 were classified into five classes, and the concentrations and physical properties of the tunnels were compared. This study can provide a method to reduce PM concentration in tunnel for each pollution pattern and provide basic information about air quality control in Seoul subway tunnel.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.30
no.6_2
/
pp.623-629
/
2012
During the construction of crossing engineering one of the important measures to ensure the safety of subway operation is the implementation of deformation surveying to the existing subway tunnel. Guangzhou new subway line 2 engineering which crosses the existing tunnel is taken as the background. How to achieve intelligent and automatic deformation surveying forecast during the subway tunnel construction process is studied. Because large amount of surveying data exists in the subway construction, deformation analysis is difficult and prediction has low accuracy, a subway intelligent deformation prediction model based on the PBIL and support vector machine is proposed. The PBIL algorithm is used to optimize the exact key parameters combination of support vector machine though probability analysis and thereby the predictive ability of the model deformation is greatly improved. Through applications on the Guangzhou subway across deformation surveying deformation engineering the prediction method's predictive ability has high accuracy and the method has high practicality. It can support effective solution to the implementation of the comprehensive and accurate surveying and early warning under subway operation conditions with the environmental interference and complex deformation.
Kim, J.R.;Kim, D.G.;Kum, J.S.;Choi, K.H.;Jeong, H.M.;Park, J.T.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.9
no.4
/
pp.504-516
/
1997
Recently scientists and engineers are developing a system to get waste heat of low-temperature level with advanced heat pump, which have not been used up to now. As the reason, it is necessary to examine capability of using waste heat which is raised up in the tunnel of subway out of widely distributed low-temperature waste heat in large cities. Therefore we surveyed thermal environment of the tunnel of subway in $S\check{o}my\check{o}n$, downtown of Pusan, from November 1995 to December 1996 and developed a program to predict the thermal environment of subway on the basis of experimental data and the geometries of tunnels. This paper has proved availability of waste heat of subway when the measured results obtained in subway in the winter time and the simulated results of thermal environment prediction program are compared, as well as has reported results of estimating reliability of the simulation program. As the result, the charateristics of thermal environment in the tunnel of subway in $S\check{o}my\check{o}n$ station in the winter time are to be followed; 1) temperature in the tunnel is about $10^{\circ}C$ higher than outside air temperature, 2) temperature change in the tunnel is less than that in the platform so that we may obtain stable heat source, 3) and when the measured results obtained in subway in the winter time and the simulated results of thermal environment prodiction program is compared, both results show similar tendency. Therefore, we confirm estimating reliability of the simulation program.
Proceedings of the Computational Structural Engineering Institute Conference
/
1995.04a
/
pp.114-121
/
1995
Problems of noise and vibration induced by subway operation became one of the major factor when new subway 1 me is under consideration. One of the most economic method in reducing the noise and vibration is the increasement of the tunnel mass. . Vibration of the massive tunnel structure has been measured induced by subway operation. STEDEF system which was adopted by Seoul Metropolitan Subway Bureau has been proved that more than 99% of the vibration has been decreased at the bottom of the railway track. Most of the vibration measured inside and outside of the tunnel showed that their peak frequency is around SOHz or 100Hz. The propagation characteristics of vibration in massive tunnel , wave propagate in three directions. Overall frequency in the range of 0 to 125H2 horizontal transmission usually increase, while vertical transmission decreases about 50% in the range of 0 to 25Hz and 90Hz to 125Hz regardless of modal shape.
Park, Beom-Ho;Lee, Woo-Chul;Kim, Jin-Ho;Lim, Ham-Hyoung
Proceedings of the KSR Conference
/
2009.05a
/
pp.15-19
/
2009
Due to the Japan's Kobe earthquake in 1995, a cut-and-cover tunnel, which is one of subway facilities, collapsed unexpectedly. As a result, also in Korea, seismic performance needs to be secured for the cut-and-cover tunnel and currently, the subway seismic design standard is based on the seismic performance. However, there is no standard for the damage level or stability level of a member for securing the seismic performance, and the definition of multi-level seismic performance is not sufficient. By contrast to this situation, in the Japan's evaluation method of seismic performance, design earthquake ground motion having reflected there into the subway driving stability is clearly defined and the seismic performance required for structures is classified in detail. This study analyzes the Japan's systematic evaluation method of seismic performance for cut-and-cover tunnels of subway.
Yu, Hong;Zhu, Hong P.;Weng, Shun;Gao, Fei;Luo, Hui;Ai, De M.
Structural Monitoring and Maintenance
/
v.5
no.2
/
pp.231-242
/
2018
Subway tunnel structure has been rapidly developed in many cities for its strong transport capacity. The model-based damage detection of subway tunnel structure is usually difficult due to the complex modeling of soil-structure interaction, the indetermination of boundary and so on. This paper proposes a new data-based method for the damage detection of subway tunnel structure. The root mean square acceleration and cross correlation function are used to derive a statistical pattern recognition algorithm for damage detection. A damage sensitive feature is proposed based on the root mean square deviations of the cross correlation functions. X-bar control charts are utilized to monitor the variation of the damage sensitive features before and after damage. The proposed algorithm is validated by the experiment of a full-scale two-rings subway tunnel lining, and damages are simulated by loosening the connection bolts of the rings. The results verify that root mean square deviation is sensitive to bolt loosening in the tunnel lining and X-bar control charts are feasible to be used in damage detection. The proposed data-based damage detection method is applicable to the online structural health monitoring system of subway tunnel lining.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.