• Title/Summary/Keyword: subway train

Search Result 365, Processing Time 0.025 seconds

A Study on Sensitivity Analysis for Numerical Solution of Passenger Train Fire (여객 열차 화재의 수치해석을 위한 민감도 분석)

  • Kim, Woo-Seok;Roh, Sam-Kew;Jung, Woo-Sung
    • Fire Science and Engineering
    • /
    • v.23 no.1
    • /
    • pp.1-6
    • /
    • 2009
  • The aim of this study is to analyse the sensitivity of fire simulation parameters including grid size and solid angle number which affect the performance of subway cabin fire simulation by FDS 4.07 version. The results of sensitivity analysis shows average of $10{\sim}20%$ differences in plume temperature, upper layer temperature, and layer height depending on the change of grid size. The study also shows that simulation with 0.05m grid size produces better resolution than that with coarse one which is 0.1m.

A Study on a Method of Improvement from Domestic NATM Case (국내 NATM시공 사고사례에 의한 개선방안 연구)

  • 김무일;이상웅
    • Journal of the Korean Society of Safety
    • /
    • v.9 no.4
    • /
    • pp.92-102
    • /
    • 1994
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data, poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for settling technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites haying occured accidents is badly geological survey, nonconfirmation of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are summarised as follows ; 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre-boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel. 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring managements, should be posted at field.

  • PDF

Measurements and Statistical Modeling of Electromagnetic Noise from Electric Train (도시전철에서 발생한 전자파잡음의 측정 및 통계적 모형)

  • 심환우;윤현보;백락준;우종우
    • The Proceeding of the Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.6 no.7
    • /
    • pp.37-47
    • /
    • 1995
  • In this paper, we have measured eletromagnetic noises from eletcric trains and the measurment data are treated statisticlly for monig. In order to measure the noise of electric tran, we set up an automatic measuring system andd measured the magnetic field over 9 kHz ~ 30 MHz range and electric field over 30 MHz - 1, 000 MHz range. The computer controlled measurint system yields efficiently experimental APD (Amplitude Probability distribution) data each of national rail road and subway train. The measured APD curves are analysed in terms of sensitivity study of Middleton's model through 6-parameter variation. Optimal parameters are obtained from measured data using Composite Approximation Algorithm.

  • PDF

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (속도 상승에 따른 캔트조정 사례 분석)

  • Shin, Gil-Cheol;Yang, Hoe-Seong;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.151-157
    • /
    • 2008
  • Subway routes $1\sim4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

An effect of rail accumulated passing tonnage measurement device which uses a optical fiber sensor rail pad (광섬유센서 레일패드를 이용한 레일누적통과톤수 실측장치의 효용성 분석)

  • Shin, Hyo-Jeong;Park, Eun-Yong;Kong, Sun-Yong;Kim, Bag-Jin
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.91-98
    • /
    • 2009
  • For maintaining railroad, accumulated passing tonnage is a determinant factor of appropriate rail replacement time. Recently, Seoul Metro's rail maintaining system and technology is being improved from previous years, which increasing a standard of rail replacement. Thus, this brings importance of estimating and managing for accumulated passing tonnage. In case of light weighted train such as subway, current method of calculating accumulated passing tonnage has defaults of misrepresenting accumulated passing tonnage data. Because current method is based on the weight of passengers and train., and operation data. In addition, currently there is no mechanical and electronic system that could represent and support the accurate data between heavy and non-heavy traffic area, and accumulated passing tonnage is calculated inaccurately by estimating average value each line. The current method of calculating accumulated passing tonnage misleads to unpredictable data that represent inappropriate rail replacement period, which leads to under or over analyzed replacement period. If accumulated passing tonnage is over estimated, rail replacement leads to waste of budget. Hence, it is necessary to construct reliable actual measurement system to manage rail's life safely and efficiently, and in this study the accumulated passing tonnage measurement device is installed with using rail pad of optical fiber sensors and its effect is analyzed.

  • PDF

A comparative study of risk according to smoke control flow rate and methods in case of train fire at subway platform (지하철 승강장에서 열차 화재 시 제연풍량 및 방식에 따른 위험도 비교 연구)

  • Ryu, Ji-Oh;Lee, Hu-Yeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.4
    • /
    • pp.327-339
    • /
    • 2022
  • The purpose of this study is to present the effective smoke control flow rate and mode for securing safety through quantitative risk assessment according to the smoke control flow rate and mode (supply or exhaust) of the platform when a train fire occurs at the subway platform. To this end, a fire outbreak scenario was created using a side platform with a central staircase as a model and fire analysis was performed for each scenario to compare and analyze fire propagation characteristics and ASET, evacuation analysis was performed to predict the number of deaths. In addition, a fire accident rate (F)/number of deaths (N) diagram (F/N diagram) was prepared for each scenario to compare and evaluate the risk according to the smoke control flow rate and mode. In the ASET analysis of harmful factors, carbon monoxide, temperature, and visible distance determined by performance-oriented design methods and standards for firefighting facilities, the effect of visible distance is the largest, In the case where the delay in entering the platform of the fire train was not taken into account, the ASET was analyzed to be about 800 seconds when the air flow rate was 4 × 833 m3/min. The estimated number of deaths varies greatly depending on the location of the vehicle of fire train, In the case of a fire occurring in a vehicle adjacent to the stairs, it is shown that the increase is up to three times that of the vehicle in the lead. In addition, when the smoke control flow rate increases, the number of fatalities decreases, and the reduction rate of the air supply method rather than the exhaust method increases. When the supply flow rate is 4 × 833 m3/min, the expected number of deaths is reduced to 13% compared to the case where ventilation is not performed. As a result of the risk assessment, it is found that the current social risk assessment criteria are satisfied when smoke control is performed, and the number of deaths is the flow rate 4 × 833 m3/min when smoke control is performed at 29.9 people in 10,000 year, It was analyzed that it decreased to 4.36 people.

An Evaluation of User's Facility and Suggestion for the Improvement on the Interior Design of Metropolitan Railroads Trains - Focus on the opening 14 metropolitan railroad lines in Seoul through checklist - (도시철도 차량 실내의 이용자 시설 평가와 개선방향 - 체크리스트를 통하여 수도권 노선에 운행 중인 14개 철도 차량을 대상으로 -)

  • Moon, Suh-Hyun;Kim, Gu-Seul;Shin, Kyung-Joo
    • Korean Institute of Interior Design Journal
    • /
    • v.19 no.5
    • /
    • pp.11-20
    • /
    • 2010
  • User-oriented Design is necessary in planning the interior design of Metropolitan Railroads trains, since this is a typical means of transportation in this modem society and all ages people with different body scale use this facility. However, there are little studies about facility panning and zoning of Metropolitan Railroads train considering users. Therefore, in this study, after completing the checklist based on the current legal standards of facility installation of South Korea and Japan, we examined user's facility and suggest several improvement of the opening 14 metropolitan railroad lines in Seoul. Then, we evaluated this facilities according to 41 standards; general facility(24 standards), safety facility(4 standards), guide facility(11 standards), other facility(4 standards). The result of this study may be summarized as follows. 1) General facility has to be designed to obtain lots of room for storage and this facility should be fixed up tightly with secure system. 2) Safety facility should be designed to minimize a difference of floor-level between threshold of train and ground. Also, using various color and material could help passengers to distinguish different space and facility. 3) Guide facility should be designed to guide passengers to the accurate direction with proper sign design in the pathway of Metropolitan railroad train. Also, more various color, which based on the research about physiological and psychological effect, should be used to guide people. 4) Other facility should equip more visual system using common good and informative contents. Through this study, we try to understand the current interior physical condition of Metropolitan Railroads trains. However, for future studies, it is expected to supplement evaluation standards considering aesthetic design, environmental improvement of indoor air quality and the satisfaction and demand of Metropolitan Railroads trains.

Implemetation of OFDM Ethernet Modem System (고속이동체를 위한 OFDM Ethernet 모뎀 시스템 구현)

  • Jeong, Sang-Guk;An, Tae-Ki;Kim, Back-Hyun;Nam, Myung-Woo;Lee, Yong-Seok;Oh, Myung-Kwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.4
    • /
    • pp.1817-1823
    • /
    • 2011
  • OFDM Modulation is used for multimedia transmission At Urban Train. Recently the application field about data transmission is expanding the image as well. The case which the number of OFDM carrier is big is advantageous because multipass fading is big 18GHz wireless frequency. Existing WLAN which an ethernet transmission is possible is not suitable to a great distance transmission because number of carrier is 64. In this paper, we developed OFDM modem suitable to transmit broadband data at high speed train. A doppler compensation block added to offset the doppler effect. Therefore, the effectiveness is expected to be very big in field of urban train.

A Comparative Study of the Flexible Moving Block System and the Fixed Block System in Urban Railway (도시철도에 있어 이동폐색방식과 고정폐색방식의 상호비교 연구)

  • Jeong, Gwangseop;Park, Jeongsoo;Won, Jaimu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.723-730
    • /
    • 2006
  • Recently, The flexible moving block system in train operation has been introduced to the worldwide rail transportation markets. This paper is a comparative study of the conventional fixed block systems effects and the flexible moving block system on train operating time saving. Based on the literature review, the new algorithm is developed. It is to calculate the optimum headway time of the train. The proposed algorithm can overcome some of the existing algorithm problems, such as the limits of the data and unaware of the rail characteristic. The total travel time saving effect has been analyzed by applying the skip stop scheduling system to the each block system. The results of this study indicated that the total travel time is approximately 40% decreased and the schedule velocity is approximately 24% improved when the moving block system is applied. The results of this study could be used as a theoretical basis for the selection of rail signal system in Seoul's subway number 2 line.

A Conceptual Design of Maintenance Information System Interlace for Real-Time Diagnosis of Driverless EMU (무인전동차의 실시간 상태 진단을 위한 유지보수 정보시스템 인터페이스에 대한 개념설계)

  • Han, Jun-hee;Kim, Chul-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.63-68
    • /
    • 2017
  • Although automated metro subway systems have the advantage of operating a train without a train driver, it is difficult to detect an immediate fault condition and take countermeasures when an unusual situation occurs. Therefore, it is important to construct a maintenance information system (MIS) that detects the vehicle failure/status information in real time and maintains it efficiently in the depot of the railway's vehicles. This paper proposes a conceptual design method that realizes the interface between the train control system (TCS), the operation control center train control monitoring system (OCC-TCMS) console, and the MIS using wireless communication network in real-time. To transmit a large amount of information on 800,000 occurrences per day during operation, data was collected in a 56 byte data table using a data processing algorithm. This state information was classified into 4 hexadecimal codes and transmitted to the MIS by mapping the status and the fault information on the vehicle during the main line operation. Furthermore, the transmission and reception data were examined in real time between the TCS and MIS, and the implementation of the failure information screen was then displayed.