• Title/Summary/Keyword: stone works

Search Result 107, Processing Time 0.025 seconds

How Do Landscape and Road Barriers Affect Road Crossing of Multihabitat Mammals (경관과 도로침입 방어막이 범서식지 포유류종의 도로 횡단에 미치는 영향 분석)

  • BYUN, Ye-Seul;KWON, Ji-No;KIM, Jeong-Hwan;SHIN, Moon-Hyun;LEE, Sang-Don
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.19 no.3
    • /
    • pp.89-101
    • /
    • 2016
  • This study examined spatial disposition of wildlife highway mortality using road-kill GIS database and Naver panoramic 360 degree views to find out which habitat and road variables most influenced road-kill numbers for each mammal species and how the landscape and road elements are connected on highway. Road-kills on Yeongdong(YD) and Jungbu highway(JB) generally tended to be higher in natural barren, grassland and cropland due to its value of preferred habitats of nocturnal and multihabitat species like water deer(Hydropotes inermis argyropus), raccoon(Nyctereutes procyonoides) and hare(Lepus coreanus). Land cover in YD showed no difference between species (p=0.165) while JB did by species (p=0.001). This may be explained by disparate landscape between mountain and urban or the fact that YD in long term operation might have enabled consistent crossing pattern compared to JB experiencing continuous extension works which may in turn have deviated the road crossing. Although road-kill prevention effect of local topography alone was appreciable, compared to less significant or ineffective fence and guardrail, gentle slope declining in a direction to the road turned out to offset the preventive effect of juxtaposed fence. Furthermore, green patches on road near intersection were deemed a visual stepping stone facilitating wildlife attempted crossing and local roads juxtaposed with a highway were especially left defenceless to road-kill without road barriers.

Observation of behavior of the Ahlat Gravestones (TURKEY) at seismic risk and their recognition by QR code

  • Isik, Ercan;Antep, Baris;Buyuksarac, Aydin;Isik, Mehmet Fatih
    • Structural Engineering and Mechanics
    • /
    • v.72 no.5
    • /
    • pp.643-652
    • /
    • 2019
  • Protection of cultural heritage and carrying it to the future are at the top of the significant topics of research and implementation in engineering in the 21st century. There are several historical structures in the district of Ahlat located in the east of Turkey on the Lake Van Basin that has harbored many civilizations. Some of such works are the gravestones that are found in the Ahlat Seljuk Cemetery, which is the oldest and largest cemetery in the district. This study firstly provides information about the Ahlat Seljuk Cemetery and the gravestones found in it. Observation-based structural analyses were carried out on these gravestones that are found in this area that are known to have belonged to different civilizations based on their physical and constructional characteristics. These stones were built out of Ahlat stone as single pieces. Information is provided on the damages that have occurred on the gravestones in time and their causes. In general, losses of mass, abrasions, separations, collapses and calcifications due to natural conditions, as well as vegetative formations, were observed in the gravestones. To provide an example of other gravestones within the context of the study, the gravestone that is known to belong to the person named Nureddin Ebu Hasan was selected. As a result of the modeling that was carried out for this gravestone by using the finite elements method, modal analyses were carried out. With these analyses, for the gravestone, period, effective mass participation rates and stress values were calculated. The stress values that were obtained in this study were compared to the material safety stress values that were obtained in previous studies. Additionally, QR code application was created for the gravestone that was selected as an example in the study, and information on this gravestone was transferred to an electronic environment. The QR code application includes different language options, visuals of the gravestone and information on the gravestone. The QR application was also supported with a video of the cemetery where the gravestone is located. With this application, access to information about gravestones will be possible by using tablets and smartphones. With a QR code to be created for each gravestone, these gravestones will obtain identity cards.

Landslide Disaster Countermeasures in Korea (한국(韓國)의 산사태방재대책(山沙汰防災對策)에 관한 연구(研究))

  • Woo, Bo Myeong
    • Journal of Korean Society of Forest Science
    • /
    • v.63 no.1
    • /
    • pp.51-60
    • /
    • 1984
  • Analysing the reports of disaster-related, average annual death of lives due to the meteorological disasters amounted to be 250, of which about 90 were due to landslide. According to the last 10-year reports, the average area of landslide occurred reaches 275 hectares per year in Korea. The total cost for rehabilitation could annually require more than about 2 billion Won (about US$ 2.5 million). The basic countermeasure policy against such heavy disasters should be definitely taken on prevention rather than rehabilitation after being damaged. However, prevention countermeasures against landslide-related disasters have not been strengthened in Korea although being important. Areas of high landslide hazard must be designated with increase in number from current 10 (35 cities and counties) to 17 (68 cities and counties included : Table 3). Number of regional Erosion Control Stations taking full charge of rehabilitating works on the damaged land resulted from landslide disaster has to increase from currently 15 stations to 25. The stone buttressed terrace structures on the hillside slopes, being typical erosion control measures in Korea have been recently recognized as one of the most effective rehabilitation measures for the land damaged by landslides.

  • PDF

Personal Name Authority Control in Korean Public Libraries (국내 공공도서관의 인명 전거제어의 현황 및 발전 방향)

  • Shim, Kyung
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.40 no.4
    • /
    • pp.221-244
    • /
    • 2006
  • This research analyzes the current status of personal name authority control and its impact on the end user searching against OPACs in public libraries in Korea. Further it also suggests the ways to improve the recall ratio in author search with a minimal modification, system-wise and authority-wise. on the KOLISNET as a stepping stone for other public libraries. Finally, a long-term plan for establishing proper authority work in public libraries including the National Library of Korea is briefly proposed. In order to find out whether authority works are conducted and examine how variant written forms of the same foreign name and variant names of the same person are treated, OPACS of the National Library of Korea, KOLISNET, and ten randomly selected public libraries were searched. Findings indicate that while the National Library of Korea was performing authority control, even incomplete, the rest did not appear to conduct any form or authority control. As a spinoff of the research, it is observed that in many public libraries their bibliographic records and retrieval methods are inaccurate, lacking consistency, and incomplete. In sum. it is strongly recommended that (1) as a start for authority work among public libraries personal name authority control should be conducted to enhance the identifying and collocating functions in OPACs, (2) a shared authority database, for which the National Library of Korea's authority database might be used. should be built for Public libraries.

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

Influence on the Movement of Fish by the Installation of Structures in Mountain Streams: Focused on Chinese Minnow (산지계류에 설치된 계상구조물이 어류의 이동에 미치는 영향: 버들치를 중심으로)

  • Ma, Ho-Seop;Park, Jae-Hyeon
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.2
    • /
    • pp.224-232
    • /
    • 2019
  • The movement of fish to the upper and the lower parts of a mountain stream was investigated based on the installation of specific types of structures within the stream. The results indicated that as the flow rate increases after a rain, the height of the drop in an open-type structure, such as a concrete box, is decreased so that the floating fishes, such as the Chinese minnow fish, move relatively easily from the upper to the lower parts and from the lower to the upper parts of the stream. In contrast, the fishes released from an upper point of a wall-type structure with <1 m, such as rocks drop works and stone masonry for stream-grade stabilization, were trapped in the lower part of the stream and, even after the rainy season, it was difficult for the fish to move from the lower to the upper parts of the stream. In particular, the barrier-type structures ${\geq}3m$ limit the movement of fish, even when there are few drainage holes at the lower end of the dam, and there is no space for the fishes to communicate with each other, even when the flow rate is high; therefore, although the fish are active, they are restricted to move according to the type and characteristics of the structures. When installing structures in a mountain stream, the height of the structure must be low enough to allow the fish to communicate with each other or an open-type structure must be installed. The fish habitat and water conditions within the stream must be considered when designing the type and height of the in-stream structures.

A Preliminary Study on the Mingshansi Grottoes (안악(安岳) 명산사석굴(茗山寺石窟) 초론(初論))

  • Sun, Hua
    • Korean Journal of Heritage: History & Science
    • /
    • v.49 no.3
    • /
    • pp.104-135
    • /
    • 2016
  • This paper aims to consider history and value of the Mingshansi Grottoes, a complex of Buddhist rock sculptures in Anyue County, Sichuan Province, China. Mingshansi Shiku, not that far from Baodingshan Grottoes at Dazu District, Chongqing City, is an important art work of Liu Benzun sect. Even though there are not many niches and sculptures in the Mingshansi Shiku, it was designated as a Major Historical and Cultural Site Protected at the National Level due to its large scale and highly valued art works in it. In the Mingshansi Grottoes there is not any information inscribed on the rockface about when the grottoes were established. Because a stone pagoda, which had information about when and by whom they were established, was collapsed, some scholars considered them to be made in North Song or early Southern Song Dynasties based only on the artistic style of sculptures of the grottoes. The School of Archaeology and Museology at Peking University recently carried out a survey documenting the Mingshansi Grottoes, and thereby the school gives an important material for studying the grottoes. The grottoes consist of a Dharma-protection Warrior niche, a statue of Guanyin and Dashizhi seated together, a standing Mahavairocana statue, a standing Manjushuri statue, a standing Wenshu and Puxian statue, a Turning Dharma-wheel pagoda (轉法輪塔 Zhuanfalunta) of Zhao Zhifeng, the founder of Liu Benzun sect. These statues are considered to be produced by an overall master plan in the Middle or Late Period of the Southern Song. The Shiku is believed to be a site at which Zhao Zhifeng performed some Buddhist rites such as Water and Land Rituals (水陸法會 Shuilufahui). Income of the ritual was also a major part of the funding for establishing large-scale Baoding Shiku at Dazu District, Chongqing City.

Restricted Use of Contingent Workers and the Factors of Shift from Contingent to Standard Workers in Brazil (브라질 비정규노동의 제한적 활용과 정규직화 요인)

  • Jeong, Heung-Jun
    • Korean Journal of Labor Studies
    • /
    • v.19 no.1
    • /
    • pp.213-260
    • /
    • 2013
  • This study pays attention to the restricted use and the possibility of standard position of contingent workers in Brazil. The labor market of Brazil has been developed by formal and informal labor sector, and informal sector includes various precarious workers as well as contingent workers. According to Brazilian Statistics Department, not contingent workers but informal labor focused in this paper have been slowly decreased since year 2000. In this context, this study investigated on the reasons of decreasing contingent employment in Brazil. The results demonstrate that decreased informal employment and instead increased standard workers could not be interpreted by recent the Braizil's economic boom. Along with literature review, the author conducted the case study regarding employment of contingent workers at six large foreign companies in Sao Paulo. The results of this show that the use of contingent employment was prohibited in regular daily works by the labor law and thus firms employed contingent workers in only temporary positions. Further, firms often promise standard positions for contingent workers when temporary employment contract was terminated since there is little or no exist of the differences of wage between standard and contingent worker in terms of 'same work same wage' and 'minimum wage'. In here, labor unions play a key role in employment change from contingent position to standard job. Consequently, decreasing of contingent workers and stepping stone to regular jobs seems to be triggered by both legal regulation on contingent employment and strong unions. This institutional perspective may extend the theoretical view on the use of contingent workers, and the author discuss that Brazil's case could provide practical implications to Korean labor policy.

The Mechanical Properties of SMA Concrete Mixture Using Steel Slag Aggregate (제철 슬래그 골재를 이용한 SMA 혼합물의 역학적 특성)

  • Kim, Hyeok-Jung;Na, Il-Ho
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.1
    • /
    • pp.109-116
    • /
    • 2021
  • In order to replace mineral aggregate used as road pavement materials with steel slag aggregate, this present study evaluated mechanical properties of SMA Concrete mixtures using steel slag aggregate as oxidized slag from electric furnace in iron works. The variables of this experiment are the aggregate type of mineral and steel slag and the sieve sized of 10mm and 13mm. The physical properties inclu ding the specific gravity and absorption rate etc. of the slag aggregate mixtu res satisfied the KS standard as asphalt mixtu re. As a resu lt of evalu ating the mechanical properties of the asphalt mixtures, the optimum asphalt content of the slag aggregate mixtures were lower than that of the mineral aggregate mixtures, but other quality standards were all satisfied. In the deformation strength evaluation, the slag aggregate mixtures were measu red slightly higher than that of the mineral aggregate mixtu res, and the dynamic stability test satisfied the 2,000pass/mm standard value in all specimens. And, the moduli of resilient of the slag aggregate mixtures showed an improved value compared with the mineral aggregate mixtures. Therefore, as the resilient rate of the slag aggregate mixtures improved, it is speculated that there will be an effect of improving public performance according to the repeated traffic load of the vehicle.

Study on the Organization of Government-managed Constructions at Dongnae Province in the 19c (19세기 동래 지역의 관영공사조직에 관한 연구)

  • Kim, Sook kyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.39
    • /
    • pp.165-189
    • /
    • 2006
  • The purpose of this study is to examine process and organization of local government-managed construction by reviewing official documents and materials in regard to the official residences and castles officially constructed in Dongnae in the 19c Chosun Dynasty. Results of this study can be described as follows. 1) The construction of official residences requires exchanges of official documents among upper and lower governmental agencies concerned. Previously prepared for some 1 or 2 months, the construction was proceeded through proceeded from Paok to Gaegi, Ipju, Sangryang, Gaeok and to Iptaek. Such construction was carried out independently and concurrently Gijang and Yangsan neighboring Dongnae provided cooperation by way of supplying labor and timbers. 2) Dongnaebu castle was constructed under local autonomy system, like other government-oriented works, as governor of Dongnae became responsible for defending such establishment in 1739. The castle was built up in 1731 as an establishment with 6 gated and 15 forts. Directly controlled by governor of Dongnae, the castle continued to be partially repaired until the 19th century. Under the regime of Daewongun, the castle was enlarged and extended for military strengthening. Besides the gate having double-gated structure for the outside wall, the other five gates came to have bastions and 30 forts were additionally established, dramatically changing the structure of the castle as whole. 3) Government-managed construction was often implemented by an organization whose members included local government officials, lower administrative agencies and local influential persons. The construction of official residences was implemented by Gamyeokdogam which was headed by Jwasu of Hyangcheong. In the construction, chief of military officials became supervisor, who was responsibly supported by Saekri. The construction of castled were divided into several works, for example, establishments of fortress, tower gate and quarrying stone were implemented by the organization of Paejang, Gamkwan and Saekri. As a military official, Gamkwan supervised the construction. Saekri was in charge of related internal affairs. Paejang was an technical expert leading several workers. The construction of castles in 1870 were organized as a general rule having particularity of social conditions on Dongnae.