• Title/Summary/Keyword: steel tower

Search Result 226, Processing Time 0.022 seconds

Bond Strength between Concrete and Steel and Shear Behavior of Shear Connectors of H-shaped Steel Encased Composite Columns (H형강 매입형 합성기둥의 부착강도 및 전단연결재의 전단거동)

  • Wang, Ning;Lee, Hye Lim;Lee, Myung Jae
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.5
    • /
    • pp.377-387
    • /
    • 2017
  • The objective of this study is to investigate the influence that how does contact surface between concrete and steel influence the steel encased composite column by push-out test. Also nominal bond stress indicated by design standard such as Eurocode 4 is underestimated in small scale steel encased composite column. The other objective of this study is to investigate how does the number and space of shear connector influence the H-shaped steel encased composite column. The shear behavior of shear connectors is investigated by push-out test.

Experimental and Numerical Analysis of Warm Mix Asphalt Pavement prepared using Steel Slag and RAP (제강슬래그와 폐아스팔트를 활용한 중온 아스팔트 포장의 거동 분석)

  • Lee, Hojoung;Jang, Dongbok;Kim, Hyunwook;Kim, In-TaI;Kim, Kibyung;Lee, Jaehoon
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.55-65
    • /
    • 2017
  • PURPOSES : This study aimed to analyze the experimental and numerical behavior of warm mix asphalt pavement prepared using steel slag and RAP and to conduct economic analysis of pavement construction. METHODS : For developing high performance asphalt pavement, we performed three evaluations: fundamental analysis, experimental testing, and 3D finite element analysis. In particular, 3D finite element analysis was conducted on several pavement structures by adopting the results of experimental tests. RESULTS : Through the various evaluations, it was established that steel slag was effective for use as asphalt mixture aggregate. Moreover, asphalt mixture constituting steel slag and RAP demonstrated higher performance behavior compared with conventionally used asphalt mixture. Furthermore, based on the 3D FE modeling, we established that the developed asphalt pavement constituting steel slag and RAP can be utilized for thin layer pavement with comparable performance behavior. CONCLUSIONS :Warm mix asphalt pavement prepared using steel slag and RAP is more competitive and economic compared to hot-mix asphalt pavement. Moreover, it can be applied for preparing thin layer asphalt pavements with reasonable performance. The developed warm mix asphalt pavement prepared using steel slag and RAP can be an alternative pavement type with competitive performance based on the reasonable economic benefit it provides.

Determination of optimum protection potential for cathodic protection of offshore wind-turbine-tower steel substructure by using potentiostatic method (정전위법에 의한 해상풍력 타워 구조물용 강재의 음극방식을 위한 최적방식전위 결정)

  • Lee, Jung-Hyung;Jung, Kwang-hu;Park, Jae-Cheul;Kim, Seong-Jong
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.3
    • /
    • pp.230-237
    • /
    • 2017
  • In this study, electrochemical methods were used to determine the optimum protection potential of S355ML steel for the cathodic protection of offshore wind-turbine-tower substructures. The results of potentiodynamic polarization experiments indicated that the anodic polarization curve did not represent a passivation behavior, while under the cathodic polarization concentration, polarization was observed due to the reduction of dissolved oxygen, followed by activation polarization by hydrogen evolution as the potential shifted towards the active direction. The concentration polarization region was found to be located between approximately -0.72 V and -1.0 V, and this potential range is considered to be the potential range for cathodic protection using the impressed current cathodic protection method. The results of the potentiostatic experiments at various potentials revealed that varying current density tended to become stable with time. Surface characterization after the potentiostatic experiment for 1200 s, by using a scanning electron microscope and a 3D analysis microscope confirmed that corrosion damage occurred as a result of anodic dissolution under an anodic polarization potential range of 0 to -0.50 V, which corresponds to anodic polarization. Under potentials corresponding to cathodic polarization, however, a relatively intact surface was observed with the formation of calcareous deposits. As a result, the potential range between -0.8 V and -1.0 V, which corresponds to the concentration polarization region, was determined to be the optimum potential region for impressed current cathodic protection of S355ML steel.

Aging Deterioration for Electric Power Transmission Tower on Offshore Through Periodic Inspections (해상송전철탑 구조물의 주기점검을 통한 경년열화 변화특성)

  • Lee, Ho Beom;Jang, Il Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.4
    • /
    • pp.25-33
    • /
    • 2012
  • In electric power transmission tower structures on offshore, implementation of life management using the event data of regular safety inspections for structural and material damages is strongly recommended. In this study, six tower structures in Sihwa Lake around Yeoungheung island were target bodies for the safety inspections. safety inspections for deterioration about each of six towers were performed about three items for steel member, five items for concrete foundation, and four items for steel-pipe pile in seawater and seawater itself. Safety inspections for steel members included the visual observations of surface appearances, the measurements of member thicknesses, and the checks of painting states. Also safety inspections for concrete foundations comprised the estimation of crack features, the evaluation of non-destructive compression strengths, and the measurements of neutralization depths and chlorides contents. For steel-pipe piles in seawater the inspections comprised the surveys of corrosion states in accordance with potential levels tests and anode tests, the analyses of photos taken on surfaces of the piles as well as the evaluation of seawater quality. A set of deterioration inspections was performed at the same positions around october of each year for three consecutive years. As a result in this study, Newly developed deterioration indexes have been applied profitably to maintain structural safety for electric power transmission towers by utilizing these event data systematically.

Wilshire Grand: Outrigger Designs and Details for a Highly Seismic Site

  • Joseph, Leonard M.;Gulec, C. Kerem;Schwaiger, Justin M.
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • The 1100 foot [335 m] tall Wilshire Grand Center tower under construction in Los Angeles illustrates many key outrigger issues. The tower has a long, narrow floor plan and slender central core. Outrigger braces at three groups of levels in the tower help provide for occupant comfort during windy conditions as well as safety during earthquakes. Because outrigger systems are outside the scope of prescriptive code provisions, Performance Based Design (PBD) using Nonlinear Response History Analysis (NRHA) demonstrated acceptability to the Los Angeles building department and its peer review panel. Buckling Restrained Brace (BRB) diagonals are used at all outrigger levels to provide stable cyclic nonlinear behavior and to limit forces generated at columns, connections and core walls. Each diagonal at the lowest set of outriggers includes four individual BRBs to provide exceptional capacities. The middle outriggers have an unusual 'X-braced Vierendeel' configuration to provide clear hotel corridors. The top outriggers are pre-loaded by jacks to address long-term differential shortening between the concrete core and concrete-filled steel perimeter box columns. The outrigger connection details are complex in order to handle large forces and deformations, but were developed with contractor input to enable practical construction.

Probability density evolution analysis on dynamic response and reliability estimation of wind-excited transmission towers

  • Zhang, Lin-Lin;Li, Jie
    • Wind and Structures
    • /
    • v.10 no.1
    • /
    • pp.45-60
    • /
    • 2007
  • Transmission tower is a vital component in electrical system. In order to accurately compute the dynamic response and reliability of transmission tower under the excitation of wind loading, a new method termed as probability density evolution method (PDEM) is introduced in the paper. The PDEM had been proved to be of high accuracy and efficiency in most kinds of stochastic structural analysis. Consequently, it is very hopeful for the above needs to apply the PDEM in dynamic response of wind-excited transmission towers. Meanwhile, this paper explores the wind stochastic field from stochastic Fourier spectrum. Based on this new viewpoint, the basic random parameters of the wind stochastic field, the roughness length $z_0$ and the mean wind velocity at 10 m heigh $U_{10}$, as well as their probability density functions, are investigated. A latticed steel transmission tower subject to wind loading is studied in detail. It is shown that not only the statistic quantities of the dynamic response, but also the instantaneous PDF of the response and the time varying reliability can be worked out by the proposed method. The results demonstrate that the PDEM is feasible and efficient in the dynamic response and reliability analysis of wind-excited transmission towers.

Dynamic characteristics of cable vibrations in a steel cable-stayed bridge using nonlinear enhanced MECS approach

  • Wu, Qingxiong;Takahashi, Kazuo;Chen, Baochun
    • Structural Engineering and Mechanics
    • /
    • v.30 no.1
    • /
    • pp.37-66
    • /
    • 2008
  • This paper focuses on the nonlinear vibrations of stay cables and evaluates the dynamic characteristics of stay cables by using the nonlinear enhanced MECS approach and the approximate approach. The nonlinear enhanced MECS approach is that both the girder-tower vibrations and the cable vibrations including parametric cable vibrations are simultaneously considered in the numerical analysis of cable-stayed bridges. Cable finite element method is used to simulate the responses including the parametric vibrations of stay cables. The approximate approach is based on the assumption that cable vibrations have a small effect on girder-tower vibrations, and analyzes the local cable vibrations after obtaining the girder-tower responses. Under the periodic excitations or the moderate ground motion, the differences of the responses of stay cables between these two approaches are evaluated in detail. The effect of cable vibrations on the girder and towers are also discussed. As a result, the dynamic characteristics of the parametric vibrations in stay cables can be evaluated by using the approximate approach or the nonlinear enhanced MECS approach. Since the different axial force fluctuant of stay cables in both ends of one girder causes the difference response values between two approach, it had better use the nonlinear enhanced MECS approach to perform the dynamic analyses of cable-stayed bridges.

Study on the reform case of safe distance between overhead transmission conductor of front steel pole in substation (변전소 인입 강관주 선간거리 개선사례 분석)

  • Lee, Jai-Wook;Hwang, Kwang-Su;KESCO, Jae-Kwam;Choi, Jong-Soo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.369-373
    • /
    • 2008
  • This case analyze the point of trouble and reform processing construction on input design to resolve the problem for setting tower in front of narrow base at the 154kV OO Transmission Line substaion. Hereafter the input design are presented for the basic reference data which the case a point of trouble and reform contents, input design of special shape tower and the foundation on substation input design cannot be setted by standard type of tower because of narrow base and cannot keep clerance overhead transmission conductor input to the substion.

  • PDF

Buckling Analysis using Fictitious Axial Forces and Its Application to Cable-Stayed Bridges with HSB800 Steel (가상축력을 이용한 좌굴해석 및 HSB800 강재를 적용한 사장교에 대한 적용성 분석)

  • Choi, Dong Ho;Yoo, Hoon;Gwon, Sun Gil;Lim, Ji Hoon
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.1
    • /
    • pp.13-24
    • /
    • 2017
  • System buckling analysis is usually used to determine the critical buckling load in the buckling design of cable-stayed bridges. However, system buckling analysis may yield unexpectedly large effective lengths of the members subjected to a relatively small axial force. This paper proposes a new method to determine reasonable effective lengths of girder and tower members in steel cable-stayed bridges using fictitious axial forces. An improved inelastic buckling analysis with modified tangent modulus is also presented. The effective lengths of members in example bridges calculated using the proposed method are compared with those obtained using the conventional buckling analysis method. The proposed method provides much more resonable effective lengths of the members. When girder and tower members are built with HSB800 steel instead of conventional steel, the effective lengths of the members under a small axial force slightly decreases in the inelastic buckling analysis without fictitious axial forces, while the proposed method that considers fictitious axial forces provides almost no changes in such lengths.

The study for design of the foundation insert of large wind turbine (대형풍력터빈 기초 인서트 설계에 관한 연구)

  • Han, Dong-Young;Choi, Won-Ho;Lee, Seung-Kuh
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.391-394
    • /
    • 2007
  • The foundation insert is a tubular steel section which is embedded into the concrete of the foundation. The tower base section of the wind turbine is mounted on it. It has a top flange (L type) protruding far enough above the concrete to allow bolts to be inserted from underneath. The load is transmitted to the concrete at the base of the section through a T shaped flange. It has many holes for the reinforcements and the cables. The reinforcements of the concrete foundation run through the insert via a series of holes to bind the inner section to the outer section. Holes are provided for the power and communications cabling. The design follows normal European wind turbine practice, based on GL 2003 and Eurocode regulations.

  • PDF