• Title/Summary/Keyword: snow removal

Search Result 62, Processing Time 0.03 seconds

Planning Guidance for Snow Control Material Storage Facilities Based on Case Studies (사례조사를 통한 제설전진기지 시설기준에 관한 연구)

  • Kim, Geun-Young;Kim, Hee-Jea;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.381-388
    • /
    • 2016
  • The snow control storage facilities have the physical requirements that are an anti-icing and deicing operations. They are efficiently and quickly performed, and composed of a vehicle depot for the snow removal equipment and truck, anti-icing and deicing chemical storages, and the control utilities. This study is to investigate the planning guidance of foreign countries, and the actual conditions of the snow control chemical storage facilities for expressway, the national highway and the local road, and is to suggest the planning guidelines. As some of the authorities have no fixed structures for the snow control storage, this study analyze the 5 cases constructed lately. From the result of the case studies, the operations performed in the snow control storage facilities and drawback of the facilities are analyzed with respect to layout, size, plan, and structure, and the improvement planning guidance is also suggested.

Measures against Damages from Heavy Snow (눈 피해 대비책)

  • Park, Moo-Il
    • Journal of the Korean Professional Engineers Association
    • /
    • v.39 no.1
    • /
    • pp.54-57
    • /
    • 2006
  • The snow brings affluence if it is dealt with appropriately. but causes huge damages if it is dealt with improperly when it snows heavily. Following with the development of road transportation, tile snow causes damages by becoming a serious obstacle for traffic, increasing traffic accidents, causing damages to the road, and requiring a lot of snow removal expense. As farming in the winter becomes flourishing, damages to agricultural facilities and farm produces caused by the snow become bigger and bigger. Now in our country, heavy snow or heavy rain is likely to fall at anywhere and at any time without restricted to a particular area. Safety first is one way of practicing human respect. Disasters will disappear from our neighborhood if we adopt prevention measures and follow them thoroughly. And also this is the shortcut to achieve a welfare society.

  • PDF

Prioritization of Anti-Icing Spray System for Active Snow-Removal Works (능동적 제설작업을 위한 염수분사장치 설치 우선순위 선정)

  • Yang, Choong Heon;Kim, In Su
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.99-105
    • /
    • 2015
  • PURPOSES: This study aims to establish the priority of introducing anti-icing spray system for regions of the National Highways in South Korea. Using this study, a logical plan for instituting such an anti-icing spray system can be established for the National Highways. METHODS : The Analytical Hierarchy Process (AHP) was employed to prioritize the implementation of an anti-icing spray system on Korean highways. For this purpose, an existing scoring table developed by the Ministry of Land, Infrastructure Transport Affair was slightly modified in order to reflect recent trends in winter maintenance. A survey was conducted to gather the preferences regarding the developed hierarchy of road experts and agencies. Finally, the final score was produced by integrating the scoring results with estimated weights for each evaluation criterion. RESULTS: In general, Honam and the metropolitan areas have relatively high priority while other areas such as Chungcheong, Young Nam, and Gang Won appear to be uniform in importance in terms of establishing an anti-icing spray system. This result may indicate that historical weather data and traffic volumes are significant factors in deciding in winter maintenance polices CONCLUSIONS : In this study, useful insights are suggested regarding winter maintenance by simultaneously performing rapid snow removal and proactive treatment. Issues of resource allocation may be potential research items in the field transportation engineering.

Particle Swarm Optimization for Snowplow Route Allocation and Location of Snow Control Material Storage (Particle Swarm Optimization을 이용한 제설차량 작업구간 할당 및 제설전진기지 위치 최적화)

  • Park, U-Yeol;Kim, Geun-Young;Kim, Sun-Young;Kim, Hee-Jae
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.369-375
    • /
    • 2017
  • This study suggests PSO(Particle Swarm Optimization) algorithm that optimizes the snowplow route allocation and the location of the snow control material storage to improve the efficiency in snow removal works. The modified PSO algorithm for improving the search capacity is proposed, and this study suggests the solution representation, the parameter setting, and the fitness function for the given optimization problems. Computational experiments in real-world case are carried out to justify the proposed method and compared with the traditional PSO algorithms. The results show that the proposed algorithms can find the better solution than the traditional PSO algorithms by searching for the wider solution space without falling into the local optima. The finding of this study is efficiently employed to solve the optimization of the snowplow route allocation by minimizing the workload of each snowplow to search the location of the snow control material storage as well.

Regional snows scenario for the support systems Analysis (지역별 제설 시나리오 응원체계 구축연구)

  • Kim, Heejae;Oak, Youngsuk;Kim, Geunyoung
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.163-172
    • /
    • 2017
  • Because of abnormal weather, a heavy snow on the Northern latitudes occurs frequently. This has resulted in significant damage and recovery costs. In korea, it has been declared a special disaster area due to heavy snowfall in Gangneung and Pohang 2004, 2005 and 2011, so there was a revision of action instruction for the road snow removal. Although, in our current system, snow removing methodology, regional equipment holdings, and snow responsible interval, respectively, has been classified by the National Highway, near cities and provinces support system not yet prepared. Only, if snow removing is not possible within the region itself, which contained the contents of "support and assistance to military or nearby offices requests". In this thesis, we studied the disaster scenario development according to heavy snow and the response and support system to the features of each regional. For the scenario deduction, we preferentially collected day snowfall and disaster yearbook data to regionals, classified similar pattern and plotted GIS snow map. We also classified heavy snow disaster by region and type and we deduced five-step scenario. The five-step scenario is nationwide(1st-stage), the National Capital region(2nd-stage), the Chungcheong Provinces(3rd-stage), the Kangwon province(4th-stage) and the Ch?l a provinces(5th-stage). Therefore we build near provinces support system according to five-step scenario.

The experimental study for the characteristice of snow removal on the Pavement structure (1) (도로포장구조체의 제설 특성에 관한 실험적 연구(1))

  • 조병환;황정영;태기호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.663-668
    • /
    • 1997
  • In Korea, the temperature of winter seasons are really severe and cause lot's of snow-falling and iceing in the pavements. Several de-iceing mehtod have generally been adopted to melt the ice on the surface of pavement. Therefore, the Study of experimental in the first stage was given to the verification of the icers's effects. First, Contrete and asphalt pavement specimens were made and scattered with a CaC2-deicers. then 3cm and 5cm thickness of artificial snow were prepared on the surface of specimens. It reveals that the early calorification due to de- icers as high as the temperature of laboratory increases within about 10 minutes and last for more then 2 hours and the test of ice-formation on the surface of contrete and asphalt specimen due to snow leads to the similar rate of freezing time about 20 minutes. Second, three kinds of de-icers, such as CaC2 CaC2+Nacl, Cacl Flaket are rested in the snowy highway to check the iceing-resistance. The CaC2 is proved to be the most effective de-icers so far.

  • PDF

Evaluation of SWMM Model Adjustment for Rubber-tired Tram Disaster Management System against the Snow-melt during the Winter (겨울철 융설을 대비한 바이모달 트램 재해관리 시스템의 SWMM 모형 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.56-60
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the urban flash flooding and snow pack melt/freezing due to unexpected rainfall event and snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snowfall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for snow removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system predicted data.

  • PDF

A Study on Methodology of the Snow Removal Operation of Air Wing Using Hybrid ACS Algorithm (하이브리드 ACS 알고리즘을 이용한 군 비행단 제설작전 방법연구)

  • Choi, Jung-Rock;Kim, Gak-Gyu;Lee, Sang-Heon
    • Korean Management Science Review
    • /
    • v.30 no.2
    • /
    • pp.31-42
    • /
    • 2013
  • The vehicle routing problem (VRP) can be described as a problem to find the optimum traveling routes from one or several depot (s) to number of geographically scattered customers. This study executes a revised Heterogeneous Vehicle Routing Problem (HVRP) to minimize the cost that needs to conduct efficiently the snow removal operations of Air Wing under available resources and limited operations time. For this HVRP, we model the algorithm of an hybrid Ant Colony System (ACS). In the initial step for finding a solution, the modeled algorithm applies various alterations of a parameter that presents an amount of pheromone coming out from ants. This improvement of the initial solution illustrates to affect to derive better result ultimately. The purpose of this study proves that the algorithm using Hybrid heuristic incorporated in tabu and ACS develops the early studies to search best solution.

A Study on the Embedded System of Snow Removal System for Drone Using Wireless Control Method (무선제어방식을 적용한 드론용제설장치의 임베디드 시스템)

  • Kyu-Jun Yu;Byung-Guk Kwon;Sung-Jong Lee;Myung-Seob Yoon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2023.07a
    • /
    • pp.101-103
    • /
    • 2023
  • 기존의 제설작업은 인력에 의존하여 시간과 비용이 많이 소요되고, 작업 중 발생할 수 있는 안전사고의 위험성이 존재한다. 본 논문은 제설작업의 효율성과 안전성 그리고 신속성을 높이기 위해 임베디드시스템을 활용한 드론용 제설장치의 설계에 대해 다루고 있다. 임베디드시스템은 RF모듈을 구성하고 무선으로 제어조종이 가능하도록 고안하였다. 드론에 장착되는 제설장치의 임베디드시스템으로는 아두이노메가2560을 채택하였다. 아두이노메가2560은 제설장치의 제어에 필요한 실시간 데이터수집, 처리, 응답을 처리와 RF모듈에서 오는 데이터에 대한 연산 및 제어 수행을 할 수 있다. 제설장치를 장착한 드론은 기존의 제설작업보다 안전하고 신속하게 수행될 것으로 기대된다.

  • PDF