• Title/Summary/Keyword: snow removal

Search Result 62, Processing Time 0.035 seconds

Analysis of Road Snow-removal Infrastructure using Road Snow-removal Historical Data (도로제설 이력자료 기반 제설 인프라 분석)

  • Kim, Jin Guk;Kim, Seoung Bum;Yang, Choong Heon
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.83-90
    • /
    • 2017
  • PURPOSES : In this study, systematic road snow-removal capabilities were estimated based on previous historical data for road-snowremoval works. The final results can be used to aid decision-making strategies for cost-effective snow-removal works by regional offices. METHODS : First, road snow-removal historical data from the road snow-removal management system (RSMS), operated by the Ministry of Land, Infrastructure and Transport, were employed to determine specific characteristics of the snow-removal capabilities by region. The actual owned amount and actual used amount of infrastructure were analyzed for the past three years. Second, the regional offices were classified using K-means clustering into groups "close" to one another. Actual used snow-removal infrastructure was determined from the number of snow-removal working days. Finally, the correlation between the de-icing materials used and infrastructure was analyzed. Significant differences were found among the amounts of used infrastructure depending on snowfall intensity for each regional office during the past three years. RESULTS:The results showed that the amount of snow-removal infrastructure used for low heavy-snowfall intensity did not appear to depend on the amount of heavy snowfall, and therefore, high variation is observed in each area. CONCLUSIONS:This implies that the final analysis results will be useful when making decisions on snow-removal works.

Estimating Equipment and vehicle Demands for Snow Removal Tasks by Road Snow Removal Scenarios (도로 제설 시나리오별 소요 제설장비 및 차량 추정에 관한 연구)

  • Kim, Heejae;Kim, Sunyoung;Kim, Geunyoung
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.199-212
    • /
    • 2017
  • Rapid roadway snow removal is significantly important due to difficult occurrence estimation of heavy snowfall disasters by global warming and climate change. Local governments of S. Korea have snow removal equipments and vehicles based on past experiences without considering snowfall and roadway characteristics. The objective of this research is to develop the demand estimation procedure for snow removal equipments and vehicles based on regional snowfall and roadway characteristics. This research first classifies regional snowfall characteristics using KMO's ten-year snowfall data. Second, roadway snow removal length is computed for local governments. Real possession data is compared with demand estimation of snow removal equipments & vehicles for each local government with roadway snow removal scenarios. Finally, required demands of snow removal equipments & vehicles are predicted by concerning regional snowfall amount and required snow removal hours. Results from this research are used for developing heavy snowfall disaster management policies for optimal demands and snow removal routes of 229 local governments.

A Case Analysis Study on the Development of Snow Removal Equipment Using Smart Mobility (스마트 모빌리티를 적용한 제설장비 개발을 위한 사례분석 연구)

  • Heejae Kim;Geunyoung Kim
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.138-146
    • /
    • 2024
  • Purpose: The purpose of this study is to find cases of using information and communication technology and smart mobility technology in snow removal vehicles and equipment for rapid and efficient road snow removal in the event of a snowstorm, and to find ways to utilize them. Method: Cases of domestic and overseas snow removal methods are investigated, and snow removal operation methods incorporating new technologies are presented. Result: Most of the operation of snow removal equipment in Korea uses GPS, CCTV, and road traffic information systems, and in the case of overseas, road weather information systems and road snow removal monitoring systems are used. It is expected that snow removal technology using autonomous snow removal vehicles, which are smart mobility, will be developed in the future. Conclusion: The results of this study can contribute to the policy of using snow removal equipment and snow removal vehicles of local governments and related organizations.

Analysis of Snow Removal Vulnerability through Relationship between Snow Removal Works and Weather Forecasts (제설작업과 기상정보의 상관관계를 통한 제설취약성 분석)

  • Yang, Choong-Heon;Kim, In-Su;Jeon, Woo-Hoon
    • International Journal of Highway Engineering
    • /
    • v.14 no.4
    • /
    • pp.141-148
    • /
    • 2012
  • PURPOSES : This study demonstrates the need for the collection of road weather information in order to perform efficient snow removal works during the winter season. Snow removal operations are usually dependent upon weather information obtained from the Automatic Weather Station provided by the Korea Meteorological Administration. However, there are some difference between road weather and weather forecasts in their scope. This is because general weather forecasts are focused on macroscopic standpoints rather than microscopic perspectives. METHODS : In this study, the relationship between snow removal works and historical weather forecasts are properly analyzed to prove the importance of road weather information. We collected both weather data and snow removal works during winter season at "A" regional offices in Gangwon areas. RESULTS : Results showed that the validation of weather forecasts for snow removal works were depended on the height difference between AWS location and its neighboring roadway. CONCLUSIONS : Namely, it appears that road weather information should be collected where AWS location and its neighboring roadway have relatively big difference in their heights.

Evaluation of Efficiency of Snow Removal Operation Resources using Data Envelopment Analysis (DEA를 이용한 동절기 도로제설자재 운영 효율성 평가)

  • Kim, Jin Guk;Yang, Choong Heon;Park, Geun Hyoung
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.109-118
    • /
    • 2018
  • PURPOSES : This study evaluates the efficiency of snow removal operation resources using data envelopment analysis (DEA). The results of this study can help decision-making strategies, especially for resource allocation for snow removal works on national highways. METHODS : First, regional road management offices (DMUs) for efficiency evaluation were set up, and a database (for years 2012-2016) for analysis was formed. Second, DEA was carried out by selecting input and output variables based on the constructed database. Lastly, based on the results of the DEA, the efficiency of each regional road management office was evaluated. In addition, the potential for future improvement was determined. RESULTS : The results showed that there was a large variation in efficiency of snow removal operation resources by regional offices. CONCLUSIONS : The results of this study imply that the evaluation of efficiency for snow removal operation resources is important when decisions related to snow-removal strategies are made by road management offices.

Operation Case Analyses of Snow Removal Equipments using Information system Technologies (정보 시스템 기술을 적용한 제설장비 운영 사례 분석)

  • Kim, Hee-Jae;Kim, Geunyoung
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.2
    • /
    • pp.154-164
    • /
    • 2018
  • Purpose: Recent climate change makes weather-related disasters such as summer storms, heavy rains, winter snowfall disasters, and extreme cold temperature increase in trend. Heavy snowfall disasters requires speedy response due to various effects to traffic flows, buildings, and infrastructure. Heavy snowfall disaster response of South Korea is insufficient, even though heavy snowfall disasters affect urban safety. There have been lack of policy studies for heavy snowfall disasters. Method: This research analyzes case studies and explores implications using Information system technologies to snow removal vehicles and equipments for speedy snow removal during the heavy snowfall disasters. Results: Information system technology attachment to snow removal equipments can identify locations of snow removal vehicles and equipments for emergency period to support snow removal of adjacent jurisdictions. Conclusion: Case studies of this research can be further used for efficient application of snow removal tools of local governments.

Configuration Design of Multi Purpose Snow Removal System (다 목적 제설장비 시스템 설계)

  • Lee, Jang-Yong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.37 no.4
    • /
    • pp.415-420
    • /
    • 2011
  • Snow removal system is named for machinery which manages roads for passing of pedestrians and automobiles when snow is piled up on the road. This paper studies configuration design of snow removal system that has several functions-melting snow in the street without moving it to other place, transferring snow to the melter and cleaning road by spraying water for cleaning road. These sorts of functions are analyzed by function decomposition method of Kirshman and Fadel and, based upon which, machine parts are selected. Layout design would follow functional design to testify if the selected component satisfies space which is allowed by constraints.

Current Status of Eco-Friendly Deicing Material Development (친환경 제설제 개발 현황)

  • Seo, Ho Seong;Park, Byung Heung
    • Journal of Institute of Convergence Technology
    • /
    • v.6 no.2
    • /
    • pp.25-28
    • /
    • 2016
  • Recently, due to the climate change by global warming, the amount of snow has increased. The situations were demanded to use many snow removal materials. The snow removal materials that used in Korea were solid chloride deicing material. That is calcium chloride($CaCl_2$) and sodium chloride(NaCl). Solid chloride baesd snow removal materials have various property, for example good freezing point depression, deliquescence and economical solvents. However, there are problems such as water pollution, high corrosiveness and ecocide. For such reason, development of eco-friendly deicer was required obligatorily. This study investigated development situation of eco-friendly deicer materials.

Estimates on appropriate storage for deicing materials for the 2018 Pyeongchang Winter Olympic Games (평창 동계올림픽을 대비한 적정 제설제 비축량 추정)

  • Kim, Jin Guk;Yang, Choong Heon
    • International Journal of Highway Engineering
    • /
    • v.18 no.6
    • /
    • pp.51-59
    • /
    • 2016
  • OBJECTIVES : The objective of this study is to estimate the appropriate storage required for deicing materials in Gangwon-do for successful snow removal operations during the 2018 Pyeongchang Winter Olympic Games. The final estimates of the deicing chemicals can be used by public agencies to aid decision making. METHODS : First, the database that exists in the road snow-removal management system (RSMS) of the Ministry of Land, Infrastructure, and Transport, South Korea was used to determine historical characteristics of snow removal experiences in Gangwon-do. The database includes historical information, including regional and road weather data and number of snow-removal works. Second, both the maximum and the actual amount of storages used for deicing materials in the past three years were analyzed. Lastly, the final estimates of the deicing materials were evaluated using an additional equation. It considers frequency of salt spray application, total administrative road length estimated by road agencies, and number of days required for snow removal works in Gangwon-do. Consequently, the results show that significant differences were not observed between the final estimates and the maximum amount used during the past three years. RESULTS : The final estimates of the deicing materials are almost similar to the maximum amount used during the past three years in Gangwon-do. CONCLUSIONS : The study shows that the estimates of deicing chemicals can be useful when decision making is required for the snow-removal policy.

Development of LED Traffic Light Lens with snow removing function (제설 기능을 갖는 LED 신호등 렌즈 개발)

  • Lee, Dongeun;Seol, Dongyoul
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.13 no.4
    • /
    • pp.41-48
    • /
    • 2017
  • It is necessary to develop an LED traffic light lens having a snow removal function capable of clearly providing a traffic signal to the driver even when a traffic light is blurred due to heavy snow and wind in the winter season. This study is focused on the research and development of the traffic light lens in the process of developing the LED traffic light with the snow removal function. In the developed traffic light lens, instead of attaching the film heater, the coated nichrome wire was wound into a coil shape and inserted directly into the groove in the lens. The developed heater system facilitates the insertion of the heating wire with high elasticity into a curved lens and can provide a sufficient heat without deformation of the PC lens. The proposed traffic lights were tested in various external environments and the test results showed that complete snow removal is possible without tunnel effect.