• 제목/요약/키워드: small hydropower plant

검색결과 33건 처리시간 0.025초

수도관로를 이용하는 소수력의 최적 설계 방안 (The Optiunm Design Plan for Small Hydropower Plant Using of Waterpipe)

  • 이형묵;김기원;변일환;홍정조;이은웅
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 B
    • /
    • pp.1728-1730
    • /
    • 2005
  • Many domestic organizations are pushing ahead with small hydropower business to develop a renewable energy. In addition each organization gradually spreads small hydropower business with searching the best site for it. And KOWACO(Korea Waters Resources Corporation) answers a purpose of the government policy to spread the wide use of a renewable energy. This study explains the researching programs for the best development sites for small hydropower generation with using water pipes managed and controled by KOWACO.

  • PDF

능동적 신재생에너지 생산을 통한 하수처리장 에너지자립화 향상 (Improving Energy Self-sufficiency in Municipal Wastewater Treatment Plant using Renewable Energy Production)

  • 강지훈;채규정;김동수;양희정;안영섭;김원경;김정현;박동을
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2012년도 학술발표회
    • /
    • pp.643-643
    • /
    • 2012
  • Increasing energy prices and growing concerns about global warming address the need to improve energy self-sufficiency in many industrial and municipal sectors. Wastewater treatment plants (WWTPs) are representative of energy-consuming facilities in Korea, accounting for 5% of national energy consumption. We present renewable energy technologies and energy self-sufficiency scenarios in a municipal WWTP ($30,000m^3d^{-1}$) located in Yongin, South Korea. By employing photovoltaics (PV, 135 kW), small hydropower turbine (10 kW), and thermal energy from treated effluent (25 RT: refrigeration ton) within the WWTP, a total of 142 tonne of oil equivalent (toe) of energy was estimated to be generated, accounting for $365ton\;CO_2\;yr^{-1}$ of greenhouse gas emission reduction. Core renewable technologies under consideration include 1) hybrid solar PV system consisting of fixed PV, dual-axis PV, and building integrated PV, 2) low-head small hydropower plant specifically designed for treated effluent, 3) effluent heat recovery system for heating and air conditioning. In addition to these core technologies, smart operation and management scheme will be presented for enhancing overall energy savings and distribution within the WWTP.

  • PDF

관측 유량 자료를 이용한 소수력 잠재량 평가에 대한 사례연구 (Case Study : Assessment of Small Hydropower Potential Using Runoff Measurements)

  • 정성은;김진영;강용혁;김형수
    • 한국태양에너지학회 논문집
    • /
    • 제38권4호
    • /
    • pp.43-54
    • /
    • 2018
  • In this study, we assessed dependency of small hydropower potentials on the two different runoff such as the estimated runoff based on the rainfall amounts and measured runoff. The hydpropower potentials were evaluated using actural power generations taken from Deoksong, Hanseok, and Socheon small hydropower plants over Han and Nakdong river basins, respectively. As a result of comparing the actual power generation amount with the potential amount based on the rainfall amount and the estimated amount based on the observed flow amount by each small hydroelectric power plant, the degree of latent small hydro energy by the observed flow was confirmed to be high. It is confirmed that the potential hydroelectric power generation rate is estimated to be about average 30%Point higher than the actual generation amount as a result of the measured flow rate rather than using the rainfall amount. Based on this, a method for improving the degree of the actual generation amount is proposed.

물관련 설비를 이용한 소수력발전 성능분석 (Performance Analysis for Small Hydro Power at Existing Water Treatment Facilities)

  • 박완순;이철형
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.134-137
    • /
    • 2008
  • A methodology to evaluate the performance analysis for small hydropower at existing water treatment facilities has been studied. It consists of two main parts; flow duration function which can describe existing water treatment facilities and performance analysis to estimate the output characteristics of small hydro power plants. The output performance characteristics for Mi-ho reservoir, Sum-kang low dam, Sun-cheon sewage treatment plant and Nam-dong purification plant were analyzed, using developed model. According to the simulation results, the predicted data show that the data were in good agreement with measured results. Also, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power at existing water treatment facilities.

  • PDF

소수력발전소의 성능예측 기법에 관한 연구 (A Study on the Performance Prediction Methodology of Small Hydropower Plant)

  • 박완순;이철형;정상만
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.894-898
    • /
    • 2006
  • A model, which can analyze the hydrological performance for small hydropower(SHP) plants having no flow duration characteristics has been studied and developed. System performance of existing SHP plant under operating was analyzed by using the developed model. The annual operational rate of SHP plant showed that the data were in good agreement with predicted results from the model. Based on these results, several SHP sites to be exploited were selected and the performance characteristics were analyzed by using the developed model. Also, primary design values such as design flow rate, plant capacity, and operational rate were suggested. As a result, it was found that the methodology used in this study is useful tool to predict the hydrological system performances of SHP sites.

  • PDF

소수력발전소의 성능예측기법에 관한 연구 (A Study on the Performance Prediction Methodology of Small Hydropower Plant)

  • 이철형;박완순
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2005년도 연구개발 발표회 논문집
    • /
    • pp.742-747
    • /
    • 2005
  • A model, which can analyze the hydrological performance for small hydropower(SHP) plants having no flow duration characteristics has been studied and developed. System performance of existing SHP plant under operating was analyzed by using the developed model. The annual operational rate of SHP plant showed that the data were in good agreement with predicted results from the model. Based on these results, several SHP sites to be exploited were selected and the performance characteristics were analyzed by using the developed model. Also, primary design values such as design flow rate, plant capacity, and operational rate were suggested. As a result, it was found that the methodology used in this study is useful tool to predict the hydrological system performances of SHP sites.

  • PDF

수도관로 소수력발전 운영효율 향상을 위한 최적제어 방안 (The Optimum Control Study for Improving Efficiency of the small hydropower generation in water pipe)

  • 홍정조;임동희;김수상
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.126-129
    • /
    • 2008
  • Using a surplus head in presented water supply pipes, we have studied to improve the operating efficiency of small hydro generator, which was chosen for a test model with Sung-Nam and Bo-Ryong small hydro power plant. With regard to power control and countermeasure of water hammer impact, Finally we have represented the optimal control method through the synthetical analysis of existing system symptoms, operation efficiency, the effect of water hammer impact and system configuration.

  • PDF

소수력발전소의 건설 타당성분석 기법 (Methodology of Feasibility Assessment for Small Hydropower Plant)

  • 박완순;이철형;정상만
    • 태양에너지
    • /
    • 제18권3호
    • /
    • pp.153-160
    • /
    • 1998
  • The methodology and feasibility analysis model for small hydropower plant has been studied and developed. It consists of two main part, the performance prediction model to estimate the performance characteristics and economics anaysis model to evaluate economical characteristics for surveyed sites. The performance characteristics and feasibility assessment for surveyed sites were analyzed, using developed models. Also, primary design specifications such as design flowrate, capacity, load factor were estimated and discussed for surveyed sites in Dan-yang and feasibility was suggested through analyzing the investment, unit cost and payback period.

  • PDF

경제성분석에 의한 소수력 개발의 최적규모 결정 방안 (Framework for Optimum Scale Determination for Small Hydropower Development Using Economic Analysis)

  • 김길호;이충성;이진희;심명필
    • 한국수자원학회논문집
    • /
    • 제40권12호
    • /
    • pp.995-1005
    • /
    • 2007
  • 본 연구에서는 하천유역에서 소수력 개발 대상지점에서의 최적규모를 결정하는 방안을 제시하였다. 제시된 방안은 지형 및 수문자료의 구축, 발전소 모의운영, 경제성분석, 최적규모 결정과 같은 일련의 절차로 이루어진다. 최적규모 결정을 위해 경제성 평가지표 가운데 하나인 순현가를 이용하였고, 이를 통해 최적 설계유량과 시설물의 최적규모를 도출하였다. 초기비용의 산출을 위하여 기존 소수력발전소의 비용 자료를 검토하여 함수식을 개발하였고, 편익 산정시 현재 공시된 전력 기준단가를 이용하였다. 이러한 일련의 절차를 기존에 조사된 금강수계의 초강유역에 위치한 댐식, 수로식 소수력 지점 2개소에 적용하였으며, 최종적으로 설계유량과 시설물의 규모 변화에 따른 NPV 민감도를 확인하여 최적규모를 결정하였다. 본 연구에서 제시한 방법은 소수력 개발지점에서의 최적규모 및 경제성 여부를 사업추진 이전에 개략 추정하여 잠재수력 부존량을 확인함으로써 사업시행주체의 의사결정 지원 측면에서 활용도가 높을 것으로 기대된다.

소수력발전용 용적형수차의 성능해석과 최적설계법에 관한 연구 (Performance Analysis and Optimum Design Method of Positive Displacement Turbine for Small Hydropower)

  • 최영도
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제31권5호
    • /
    • pp.514-521
    • /
    • 2007
  • There has been considerable interest recently in the topic of renewable energy. This is primarily due to concerns about environmental impacts. Moreover, fluctuating and rising oil prices, increases in demand, supply uncertainties and other factors have led to increased calls for alternative energy sources. Small hydropower, especially using water supply system, attracts high attentions because of relatively lower cost and smaller space requirements to construct the plant. Moreover. newly developed positive displacement turbine has high acceptability for the system. Therefore, the purpose of this study is focused on the examination of the performance characteristics and proposition of a optimum design method of the turbine for the improvement of the performance. The results show that newly proposed optimum design method for the turbine has high accuracy of performance prediction and good applicability for the performance improvement of the turbine.