The sludge settleability is a key factor for operating activated sludge process as well as BNR (biological nutrient removal) process, because the poor sludge settling causes an increase of suspended solid in the effluent. In order to improving the sludge settleability, a settling agent such as iron dust can be applied. In this study, the effect of sludge settleability on the performance of DNR (Daewoo nutrient removal) process was investigated with GPS-X, which is the popular wastewater treatment process model program, and the result of modeling was verified with operating lab-scale DNR process. As a result, if the sludge blanket keeps stable in the secondary settling tank, the effluent quality is similar in spite of different SVI values. And in case of the good sludge settleability, short HRT or long SRT increased the biomass concentration in the bioreactor, and improved the pollutant removal efficiency. In spite of daily influent changing, the good sludge settleability also guaranteed the stable effluent quality. And the results of the lab-scale DNR process experiment could support the simulated results.
This study aimed to investigate the feasibility of improving dewaterability and settleability of sewage sludge using coagulation sludge. When mixed with sewage sludge and coagulation sludge at 1:1 ratio, capillary suction time(CST) and specific resistance to filtration(SRF) decreased by about 56% and 68%, respectively. It is found that total solids(TS) and volatile solids(VS) of mixing sludge are increased by about 59% and 53%, respectively. Also, the turbidity of the mixing sludge supernatant was reduced from 99 to 16 NTU. It is observed that the mixing of sewage sludge and coagulation sludge at 1:1 showed better effect than using poly-aluminum chloride(PAC) coagulant at 25 mg/L.
Membrane backwashing waste shows seasonally different characteristics and it has bad settleability differently from general backwashing waste in water treatment plant. When chemicals was injected to membrane backwashing waste, the settleability was better than chemicals was not injected. However, when settled lower sludge was not discharged, flowing sludge continuously was concentrated over a certain surface and floatation penomena occurred according to flowing velocity. When the lower sludge was discharged continuously in the thickener to prevent floatation penomena of turbidity materials, the depth of sludge surface was the least and the settleability increased.
Laboratory experiments were conducted to investigate the effect of digestion temperature on the settleability and dewaterability of anaerobically digested sludge. The digesters were operated at a hydraulic retention time of 20 days with a loading rate of 0.63~0.66kg volatile solids per cubic meter per day at the temperature of $35^{\circ}C$ and $55^{\circ}C$. A mixed primary and secondary municipal sludge was used as a feed. The interface height of the sludge during settling test was recorded to identify settleability. As a measure of dewaterability of the sludge, specific resistance and capillary suction time were also measured with and without chemical conditioning. Higher digestion efficiency was obtained at $55^{\circ}C$ than $35^{\circ}C$. However, the settleability and dewaterability of the sludge at $35^{\circ}C$ were quite higher than those of the sludge digested at $55^{\circ}C$. The optimum dosages of ferric chloride for sludge conditioning were 0.4% and 0.6% at $35^{\circ}C$ and $55^{\circ}C$, respectively. The filtrate COD of the sludge digested at $55^{\circ}C$ was higher than at $35^{\circ}C$, which means that poor dewaterability of the sludge result in high filtrate COD.
An experimental study was carried out to evaluate the potential of flotation process for the secondary clarifier of an activated sludge process. Flotation techniques, applied in this study, include electrofloation (EF) which generated fine bubbles smaller than $35{\mu}m$ in average and diffuser flotation (DF) which generated fine bubbles smaller than $55{\mu}m$ in average. The batch experiments were done with activated sludge displaying various characteristics. It was shown that the efficiency of solids/liquid separation was reduced as the diluted sludge volume index ($DSVI_{30}$) of activated sludge increased. The dependency, however, gradually decreased as the gas to solids (G/S) ratio increased. Thickening efficiency of EF was more than 2~10 times and DF process was more than 1.5~5 times as compared with gravity sedimentation (GS). Stable sludge blanket was maintained regardless of sludge settleability when the G/S ratio was 0.019 in the EF. On the other hand, Serious deterioration in the sludge blanket was observed in the DF depends on G/S ratio and sludge settleability. And For EF and DF, the suspended solids concentration of effluent was not nearly influenced on settleability of activated sludge and more clear than GS. A biological nutrient removal (BNR) process, combined with EF as a secondary clarifier was operated for three months. The mean MLSS (mixed liquid suspended solids) concentration in the reactor and mean solids concentration of return sludge were estimated to be 5,340 mg/L and 16,770 mg/L, respectively. The water quality of effluent was considerably stable and low value was accomplished, that was, standard suspended solids concentration $0.07{\pm}0.51mg/L$ and standard turbidity $1.44{\pm}0.56NTU$. The EF could be applicable for enhancement of efficiency of activated sludge system as well as improvement of the water quality of effluent.
The ballasted flocculation effects of the mill scale and magnetite on activated sludge were investigated. Both ballasted flocculants (BF) could remarkably improve the sludge settleability in terms of zone settling velocity (ZSV) and sludge volume index (SVI). With the BF dosage of 0.2 to 2.0 g-BF/g-SS, the magnetite particles showed better efficiency on improving settling behavior of activated sludge than the mill scale due to higher surface area and hydrophobic property. The efficiency of SVI30 with magnetite injection was 2.5 to 11.3% higher than mill scale injection and that of the ZSV appreciated from 23.7% to 44.4% for magnetite injection. Averaged floc size of the BF sludge with magnetite dosage (0.5 g-BF/g-SS) was 2.3 times higher than that of the control sludge. Dewaterability of the sludge was also greatly improved by addition of the BF. The specific resistance to filtration (SRF) was reduced exponentially with increasing the dosage of BF. However, the BF's particle size effect on the SRF looks to be marginal. Consequently, for improving the dewaterability, the BF played a physical role to remove the pore water of the biological flocs by intrusive attachment and a chemical role to induce aggregation of the flocs by charge neutralization.
The effects of activated carbon originated Ballasted Flocculant (BF) on the settleability of activated sludge and the recovery of BF by Hydro-cyclone (HC) were analyzed experimentally. Two kinds of BF (M-I: 125-250 ㎛, M-II: 250-425 ㎛ in dia.) and three kinds of activated sludges with different SS concentration (2,300-7,100 mg/L) were applied for this study. With the dosage variation of BF from 0.14 to 1.3 g-BF/g-SS, we could obtain 24-31% improvement in SV30 (Sludge Volume after 30min sedimentation) for the lowest SS concentration sludge (2,300 mg/L). Whereas the SV30 improvement was much higher as 44-48% for the highest SS concentration sludge (7,100 mg/L). The settling characteristics of the sludge with BF followed Vesilind model the best among three models (Vesilind, Takacs and Cho model). HC could effectively separate BF with the separation efficiency of 70-90% and over 95% separation efficiency could be obtained when the HC was applied twice.
In this study, the effects of starvation on floc characteristics when treating saline wastewater using a sequencing batch reactor (SBR) were investigated. The effectiveness over 5 days of starvation for aerobic and non-aerobic strategies for maintaining the physical characteristics of floc-forming sludge and the recovery period needed to regain the initial pollutant removal efficiency were investigated. Experiment results revealed that the sludge volume index (SVI) increased and the floc size and fractal dimension decreased after starvation under both aerobic and non-aerobic conditions. Sludge settleability deteriorated faster under aerobic conditions compared to non-aerobic conditions. Under non-aerobic conditions, the SBR required less time to return to its initial pollutant removal efficiency and settleability. Floc size, fractal dimension, and SVI were observed to be fairly correlated with each other. The results demonstrated that it was better to maintain the sludge under non-aerobic rather than aerobic starvation, because it adapted to, resisted starvation and had a quicker re-start afterward.
In this study, the treatment of livestock wastewater using an aerobic granular sludge based sequencing batch reactor was investigated. The reactor operation was carried out by general injection and split injection methods. The average removal efficiency of organic matter after the adaptation period was 71.5 and 87.4%, respectively. Some untreated organic matter was attributed to recalcitrant organic matter. The average removal efficiency of total nitrogen was 65.6 and 88.4%, respectively. These results indicate that the denitrification reaction by split injection was carried out smoothly. As for the solids, the ratio of aerobic granular sludge/mixed liquor suspended solid can be determined as the main factor of the process operation, and the ratio increased gradually and finally reached 86.0%. Correspondingly, the sludge volume index (SVI) was also improved, reaching 54 mL/g at the end of operation, and it is believed that the application of a short settling time contributed to the improvement of settleability.
While sludge settles down in a column, sludge settling characteristic is influenced by effect parameters, interparticle force, wall effect etc. As the height of a column changes, the settling velocity of sludge-water interface changes, too. At lower sludge concentration, particular effect was not observed by the difference of column height, however it was observed that settleability of sludge was greatly influenced by column height when sludge settling was poor or sludge concentration was high. It is therefore required to consider the effect of column height when the power model for sludge interface settling is established. In the tests, there was hardly any $SVI_{ts}$(SVI after "t" minutes) difference in each column after 10min at $1.5kg/m^3$ of sludge concentration. When sludge concentration was at $2.5kg/m^3$, $SVI_{ts}$ tended to be constant after 20min. At $3.5kg/m^3$, $SVI_{ts}$ increased to 30minuets. The purpose of this work is to establish the correction factor that is able to compensate the errors derived from each different height of column.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.