Proceedings of the Korean Geotechical Society Conference
/
2009.03a
/
pp.1053-1059
/
2009
In this study, slope hazards mitigation methods for a natural terrain are systematically classified to survey the mitigation methods and develop a data base system. Also, field survey sheets which can be recorded the features of mitigation methods installed in the natural slope are developed. The slope hazards mitigation methods in the natural slope are classified as hillside part method and valley part method. The slope part sheet and the valley part sheet are also drawn up for field survey. As the result of the filed survey of mitigation methods about 50 points in Muju and Jangsu area, grass painting and slope covering methods are dominant in case of slopes part. In case of valley part, slit dam, concrete check dam and slope foot barrier are applied simultaneously.
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.722-726
/
2010
Inventory survey is process collecting data about cut slope. It's different from inspection. It contains not only basic information about cut slope, especially location, GPS positioning, height, length, weathering, joint direction, water conditions but also level of danger and damage. Collected data are being used get at status about cut slope along national roads. And It helps judging about priority of detailed investigation. According to results of analysis, we found better method about maintenance of cut slope. Later on, if inventory research is finished, we will understand characteristics of collapse slopes.
Journal of the Korean Society of Environmental Restoration Technology
/
v.4
no.3
/
pp.10-18
/
2001
The existing measurement system to ground-surface displacement survey of the slope has been including the hazard for the measure in site and the difficulty for install, maintenance and control of expensive instruments, which are impossible of whole survey on the slope surface. To overcome of those defects, Softcopy Photogrammertry method is used, which can measure displacement of ground-surface on the slope and structure deformation vectors. Recently, the survey methods applying the advantages of Photogrammetry and Digital Photogrammetry Survey are widely used. In this study, therefore, the development and application of the new instrument mechanism on the the site example are studied. Through the application of Softcopy Photogrammetry, the 3-D data of ground surface on the dangerous slope could be effectively obtained at the long distance, which are obtained through the reform process of contour line. Those are different to the results of the Close-Range Photogrammetry analysis. In ground instrumentation parts, the new practical system shall be the technical base to improve of the instrument machine as well as can be widely applied in civil engineering and others branch.
Existence of core stone at the inside of the Rock mass is reacting as unstable element. In particular, in case of the cut slope, even when it is not exposed, slope's discontinuity increases or strength level decreases depending on the difference in the weathering grade when it comes to the core stone, and reacts as an important element of the slope movement such as slope's rock fall or collapse. As for the slope that is subject to study, incision was completed after 20 years or so, and parts of the slope reinforcement was completed, but frequent rock fall occurs despite small amount of rainfall, and permanent stability measures are urgent. Refractional seismic survey and geological survey results were compared and analyzed, and reliability was improved by complementing the two survey methods, and stereo-graphic projection using DIPS program was conducted to analyze the characteristics of oore stone in the weathered soil slope.
Inventory survey is process collecting data about cut slope. It's different from inspection. Collected data are being used get at status about cut slope along national roads. And we analyse between current situation and data about collapse slope. It helps finding better method about maintenance of cut slope. We found changes in the situation between data at present and data at 10 years ago. We will research collapse and counterplan by cause.
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.1282-1288
/
2010
In this study, Site Investigation Program of cut slope is developed using related techniques and experience got from practical application of Inventory Survey Program of cut slope in work for last 4 years. The Site Investigation Program is designed to can be loaded to the Mobile PC for convenience of carrying in filed, convenience of data input and revision, application of diverse programs, convenience of confirming data and facility of establishment of real-time database system using wireless communication like Inventory Survey Program. Also, for connection with Inventory Survey Program, it has a same work process and can establish real-time database system of almost data obtained in filed using stability analysis tool loaded in this program. Application of this developed program is expected to be an opportunity that can contribute to development of slope investigation and database system area using IT techniques.
In relation to slope stability analysis, geologic characteristics and engineering properties of the discontinuities in three slopes selected are compared and analyzed by both square-inventory method and scanline survey. The aim of the study is in evaluating which method is applied better in slope stability analysis by comparing results of the two methods with those of direct observation on outcrop of slope failures generated. In each slope, results of comparative analysis among geologic and engineering properties are analyzed similarly one another. However, results of orientation analysis in slope 2 are different each other, which indicates orientation of joints in slope 2 depends on persistency and frequency of each joint and also indicates appearance of new joint set with different orientation. Probability density distribution and spacing in slope 3 are high in comparison to those in slope 2 and 3. The reasons are that distribution of psammitic rocks and development of minor folds in slope 3 unlike slope 2 and 3 are closely associated with development of joints. The research data indicate that the square-inventory method predicts more precise failure aspects and is more effective way than scanline survey in analyzing slope stability of the study area.
Proceedings of the Korean Geotechical Society Conference
/
2000.11a
/
pp.551-558
/
2000
When cut slope is excavated, corestone in cut slope exists 20∼30%. In case of soil and soft rock mixing, people lay out gradient of 1 : 0.5, because of soft rock slope. In a case, slope that exists corestone between soil happens to large landslide. So, As a study performs geological survey, Analysis of slope stability reinforcement measures, etc, A study presents example meaures and analysis on slope stability of corestone.
Hwang, Hwan Kook;Kim, Young Jin;Han, Sang Jong;Jung, Ho Chan
Journal of Korean Society of Water and Wastewater
/
v.23
no.6
/
pp.789-797
/
2009
The flow in the beginning lateral sewer can be characterized as intermittent and unsteady, and a moment maximum flow energy is required to transport fecal solids in the sewer. It is thus difficult to design to satisfy a minimum velocity criteria (0.6m/s), because of the substantially lower discharge in the beginning lateral sewer. This study is the result of a field survey, and aims to determine a design criteria for the minimum slope to prevent sediment in a lateral sewer. The survey performed on the two flat small catchments in Goyang-si consisting of D400mm hume-pipe, aimed to understand the manner in which the scope of a sewer slope has an effect on sediment in the beginning lateral sewer. The survey showed that the sewer slope below 3‰ had sedimentation of 88.7%, while the sewer slope of 3~6‰ had sedimentation of 47.8%. In addition, the minimum design slope was estimated to refer to the result of hydraulic experiments from Public Works Research Institute in Japan. Analysis showed that the D400mm hume pipe should be installed with a slope of 6.5‰ to prevent sediment in the beginning lateral sewer. For future installations, the study results showed that a D300mm plastic pipe requires a minimum slope of 3.5‰, and a D250mm plastic pipe requires a minimum slope of 3.3‰ in the beginning lateral sewer.
Kim, Taejin;Son, Younghwan;Park, Jaesung;Kim, Donggeun
Journal of The Korean Society of Agricultural Engineers
/
v.60
no.1
/
pp.67-77
/
2018
The objective of this study is to extract the shape of the slope from the images acquired using UAV and evaluate its suitability and reliability when applied to slope stability analysis. UAV is relatively inexpensive and simple, and it is possible to make terrain survey by generating point clouds. However, the image acquired from UAV can not be directly photographed by the forest canopy due to the influence of trees, resulting in severe distortion of the terrain. In this study, therefore, the effects of forest canopy were verified and the slope stability analysis was performed. Images acquired in winter and summer were used, because summer images are heavily influenced by the forest canopy and winter images are not. As a result of the study, the winter image is suitable for the extraction of slope shape, but severe terrain distortion occurs in the summer image. Therefore, slope stability analysis using slope shape extracted from summer image is impossible, so it should be modified for slope stability analysis. The modified slope did not completely eliminate the distortion of the terrain, but it could express the approximate shape of the slope. As a result of the slope stability analysis, the location and shape of the failure surface are the same, and the error of the safety factor is less than 0.2, which is close to the actual slope.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.