철제펜스로 지지된 동력배선의 단락.지락에 의한 전기화재 발생 개연성 연구 (A Study on the Possibility of Electrical Fires due to the Short Circuit and Ground Fault of Power Cable Supported by an Iron Fence)

  • 김정훈;박병기;송종혁;정기창
    • 한국안전학회지
    • /
    • 제22권6호
    • /
    • pp.41-45
    • /
    • 2007
  • Short circuit and ground fault account for the primary causes of electrical fires. In this research, real-scale experiments were conducted to assess the possibility of electrical fires due to these causes. The experiment conditions were identical with an actual fire accident, in which the power cable was supported by an iron fence. The purposes of this research are to investigate the short circuit caused by wire cutting, the conductivity of the iron fence depending on its coating conditions, and the ground fault of one wire or two wires in an effort to reconstruct the fire accident. The test results show that, owing to the instant operation of circuit breaker in the moment of short circuit or ground fault, the generated ignition energy is far less than necessary to start an ignition. Therefore it is concluded that electrical fire is highly unlikely if the electric system is protected by a circuit breaker with normal functions.

전력용 변압기의 단락강도 해석 (Computational Analysis of Short-Circuit Stresses in Power Transformer Windings)

  • 최영길
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.147-150
    • /
    • 2002
  • This paper describes the work performed by computer simulation to achieve a satisfactory method of predicting the short circuit withstand strength of transformer which, may be too big for test due to physical or economic reasons. In fact, the windings of power transformer are subjected to extremely severe stresses under short-circuit condition. From our work, however, were computed such stresses as buckling, tending and compression occurring in transformer windings.

  • PDF

3상 90 MVA 단시간전류시험 설비 구축 (The construction of 3-phase 90 MVA short-time withstand current testing facilities)

  • 서윤택;김용식;윤학동;김맹현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.700-702
    • /
    • 2005
  • The most electrical apparatus should be able to withstand short-time current and peak current during a specified short time until circuit breakers have interrupted fault current. It defines the short-time withstand ability of electric a apparatus to be remain for a time interval under high fault current conditions. It is specified by both dynamic ability and thermal capability. KERI(Korea Electrotechlology Research Institute) recently constructed the new short-time current and low voltage short circuit testing facilities. This paper shows short- circuit calculation of transformer and describes high current measuring system, and evaluate the result of short-time withstand test used in $3{\phi}$ 90MVA short-time current testing facilities.

  • PDF

단락 전류 왜형방지를 위한 변압기 잔류자속제어 (Controlling the Residual Flux in Transformer to Prevent the Distortion of Short-circuit Current)

  • 오승렬;박지훈;박종화
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.237-239
    • /
    • 2006
  • The residual flux(${\psi}_r$) in transformer's iron cores cause the distortion of short-circuit current occasionally. And some considerable distortion effect on the validation of test results. To prevent this situation, there needs some suitable control of residual flux through the pretest. This paper deals with the how to control the residual flux in pretest and the comparison between the two test results which were obtained by different test method.

  • PDF

부스바(Busbar)형 전기접점의 단락통전성능 해석기법 개발 (Development of the Analysis Technology for Short Circuit Current Capability of Busbar-Type Electrical Contacts)

  • 오연호;송기동;김진기
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제54권1호
    • /
    • pp.27-32
    • /
    • 2005
  • This study presents an analysis technique that can consider all variables which are needed in the design of short circuit current capability of electrical contacts. Required variables in the design are material of contact, contacting area, applied force, asperity of surface, current and so on. Short circuit current capability test was carried out for the interrelation of design variables and the verification of analysis technique. Temperature rise equation of the contacts was obtained from the test results, and also, a standard that is criterion of the occurrence availability of melting or spot of contact surface from test results was established.

변압기 단락강도시험 성능평가에 관한 고찰 (The Study of Characteristics evaluation of short-circuit tests for Power Transformers)

  • 노창일;김선구;정흥수;김원만;이동준;김선호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.913-914
    • /
    • 2007
  • Power transformer shall be designed and constructed to withstand the mechanical and thermal stresses produced by external short circuits which include three-phase, single line to ground, double line-to-ground, and line-to-line faults on any one set terminals at a time. This paper presents the method of short-circuit test and means of evaluation during and after each test to judge the results of short-circuit tests.

  • PDF

22.9 kV-y 실긍장 배전선로 모의를 위한 집중정수회로의 설계 (The Design of Lumped Constant Circuit for the Simulation of A Real 22.9 kV-y Distribution Line)

  • 윤철호;정영호;한용희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1186-1188
    • /
    • 1999
  • When we perform the test related to the power distribution system such as artificial fault test, protective coordination test, distribution automation test in short length test line, Lumped Constant Circuit, a kind of variable impedance, should be attached to the test line in order to make it equivalent to a real line in length electrically. In this paper we designed the positive sequence and zero sequence Lumped Constant Circuit with optimized inductor and resister for the modification of long, 16km, distribution line, when they are attached to the short, 4km, distribution test line.

  • PDF

변압기 권선(층간)단락시의 충격파시험파형분석에 관한 연구 (Study on the analysis of impulse test wave in the short coil (layer)of transformer winding)

  • 박민호
    • 전기의세계
    • /
    • 제25권5호
    • /
    • pp.75-78
    • /
    • 1976
  • The most difficult problem encountered in impulse test of transformer is the determination of exact fauly for coil layer short. This paper is to establish one of improved standards in the above case by means of wave form analysis, based on the equivalent circuits and experimental investigation. During the fault occurs, the local oscillation in fault circuit is applicable where as the reflection wave is utilized to the main circuit. The result current wave form at neutral impeadance point is similar to the wave form by impulse test and has the singular wave form respectively.

  • PDF

Static and Dynamic Testing Technique of Inductor Short Turn

  • Piyarat, W.;Tipsuwanporn, V.;Tarasantisuk, C.;Kummool, S.;Im, T.Sum
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1999년도 제14차 학술회의논문집
    • /
    • pp.281-283
    • /
    • 1999
  • This topic presents an inductor short turn testing. From the rudimentary principles, the quality factor(Q) decreases due to inductor short turn. Frequency response varies because of the variation of circuit inductance and resistance. In general, short turn circuit testing is performed by comparing the ratio of an inductance and resistance of inductor in that particular circuit. An alternative method can be done by considering the response of second order circuit which can give both dynamic and static testing, whereas static testing give an error results not more than 2 turns. For dynamic testing, the result is more accurate, which can test fur the short turn number form 1 turn onward.

  • PDF

합성 진상전류 개폐 시험설비의 회로설계에 관한 연구 (A study on circuit design of synthetictest facilities of capacitive current switching tests)

  • 김맹현;서윤택;윤학동;신영준;강영식;고희석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.38-40
    • /
    • 2002
  • A study on the test method and the test facilities of synthetic capacitive current tests have been very slight and the direct test method with the short-circuit generator and power transformer only used up to now. However, according to the development of analysis technique of power system and design and manufacture technique we are realized that direct testing method is not satisfactory to evaluate the performance of circuit-breaker because it is difficult to simulate precisely the conditions of power system. Therefore, in order to solve these problem this paper deals with the tests methods and the design technique of the tests facilities of the synthetic capacitive current based on the same theory with the synthetic short-circuit tests.