• Title/Summary/Keyword: setting period

Search Result 616, Processing Time 0.025 seconds

A Study on the Cold Weather Concrete using High Early Strength Concrete (조강시멘트를 이용한 한중콘크리트의 특성평가 연구)

  • 임채용;엄태선;유재상;이종열;이순기;이동호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.261-264
    • /
    • 2003
  • Cold weather can lead to many problems in mixing, placing, setting time, and curing of concrete that can have harmful effects on its properties and service life. Korean Concrete Institute (KCI) defines cold weather as a period when the average daily air temperature is less $4^{\circ}C$ and recommends to cast concrete with special care such as shielding, heating and so on. The use of high early strength cements may improve the rate of hardening characteristics of concrete in cold weather by making it possible to achieve faster setting time and evolving more hydration heat than ordinary Portland cement. Higher early strength can be achieved using Type III cement especially during the first 7 days. The strength increase property of Type III cement at low temperature was studied. As a conclusion the heat or heat insulation curing period can be reduced to 50~75%. So, it can be used for cold weather concreting to reduce construction cost and extend the construction season.

  • PDF

The Safety Stock Determination by the Optimal Service Level and the Forecasting Error Correcting (최적서비스수준과 예측오차수정에 의한 안전재고 결정)

  • 안동규;이상용
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.37
    • /
    • pp.31-40
    • /
    • 1996
  • The amount of safety stock is decided from various information such as the forecasted demand, the lead time, the size of the order quantity and the desired service level. There are two cases to consider the problem of setting safety stock when both the demand in a period and the lead time are characterized as random variables: the first case is the parameters of the demand and lead time distributions are known, the second case is they are unknown and must be estimated. The objective of this study is to present the procedure for setting safety stocks in the case the parameters of the demand and lead time distributions are unknown and must be estimated. In this study, a simple exponential smoothing model is used. to generate the estimates of demand in each period and a discrete distribution of the lead time is developed from historical data, and the optimal service level is used which determined to consider both of a backorder and lost sale.

  • PDF

Research on Risk-Averse Newsboy under Supply Uncertainty (위험회피성향을 고려한 공급 불확실성하(下) 신문팔이소년 문제에 대한 고찰)

  • Kim, Hyoungtae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.3
    • /
    • pp.43-50
    • /
    • 2013
  • In this paper, the single-period inventory problem, what is called newsboy problem, has been revisited with two different conditions, uncertain supply and risk-averseness. Eeckhoudt et al. [5] investigated the effect of risk-averseness of a newsboy on the optimal order quantity in a stochastic demand setting. In contrary to Eeckhoudt et al. [5] this paper investigates the effect of risk-averseness in a stochastic supply setting. The findings from this investigation say that if ${\alpha}^*$ represents the optimal order quantity without risk-averseness then the risk-averse optimal order quantity can be greater than ${\alpha}^*$ and can be less than ${\alpha}^*$ as well.

A Method of Failure Detection Rate Calculation for Setting up of Guided Missile Periodic Test and Application Case (유도탄 점검주기 설정을 위한 고장 탐지율 산출 방안 및 적용 사례)

  • Choi, In-Duck
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.2
    • /
    • pp.28-35
    • /
    • 2019
  • Since guided missiles with the characteristics of the one-shot system remain stored throughout their entire life cycle, it is important to maintain their storage reliability until the launch. As part of maintaining storage reliability, period of preventive test is set up to perform preventive periodic test, in this case failure detection rate has a great effect on setting up period of preventive test to maintain storage reliability. The proposed method utilizes failure rate predicted by the software on the basis of MIL-HDBK-217F and failure mode analyzed through FMEA (Failure Mode and Effect Analysis) using data generated from the actual field. The failure detection rate of using the proposed method is applied to set periodic test of the actual guided missile. The proposed method in this paper has advantages in accuracy and objectivity because it utilizes a large amount of data generated in the actual field.

Developing the Optimized Method of Reliability-Growth Target Setting for Complex and Repairable Products from Business View

  • So, Young-Kug;Jeon, Young-Rok;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.15 no.4
    • /
    • pp.248-255
    • /
    • 2015
  • Purpose : The purpose of this research is to develop the optimized method and process in the reliability-growth target setting, especially for complex and repairable system (or products) such as vehicle and airplane, construction equipment. Method : A reliability-growth test plan specifies a scenario to achieve the planned reliability value (or reliability target). The major elements in test planning are reliability-growth starting time and reliability level at that time, reliability-growth rate and reliability-growth target. All of them except a reliability target can be referred to the previous development data and reference researches. The reliability target level is directly influencing to test period (or time) which is related to test and warranty cost together. There are a few researches about the reliability target setting method and but showing the limitations to consider the views of engineering, business and customer together. There is no research how to handle the target setting process in detail. Result : We develop the optimized method and systematic process in reliability target setting with considering such views. This research also establish the new concept as production capability which means company (or supplier) capability to product its products. Conclusion : In this research result, we apply the new method to a few projects and can set the reasonable test planning. The developing results is showing the good balance between the developing cost and warranty cost at market.

Evaluation of the Harbor Operation Rate Considering Long Period Waves (장주기파를 고려한 항만 가동율의 평가)

  • 김규한
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.2
    • /
    • pp.21-26
    • /
    • 2002
  • In this study, the characteristics of long period waves are analyzed by field observation at Sokcho harbor on the eastern coast of Korea. firstly. the pressure data obtained from field observation are transformed into water surface elevations and the wave by wave analysis is applied to the observed wave data. also, we select long period waves by setting up the range 30-200sec, and suggest the relationship between ordinary waves and long period waves using the concept of the significant wave height. and, we examine the effects oft he long period waves on the rate of the harbor operation. The observation results demonstrate that the long period waves with heights of 1.2-14.6cm and periods of 35.8-162sec exist at Sokcho harbor. also, we found the rates of harbor operation based on long period waves are 61.8%-99.5% lower than the usual rates of 93.8%-100%.

Real-time monitoring of net setting and hauling process in fishing operations of Danish seine vessel using ECDIS (ECDIS에 의한 외끌이 기선저인망 어선의 투양망 조업 과정의 실시간 모니터링)

  • Lee, Dae-Jae;Byun, Duck-Soo
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.43 no.4
    • /
    • pp.347-354
    • /
    • 2007
  • This paper describes on the real-time monitoring of net setting and hauling process for fishing operations of Danish seine vessels in the southern waters of Korea as an application of a PC based ECDIS system. Tracking of fishing process was performed for the large scale Danish seine vessel of G/T 90 and 350 PS class using the fishing gear which the length of net, ground rope, head rope and sweep line including warp in both sides were 86m, 104m, 118m and 3,200m, respectively. Tracking information for net setting and hauling process was continuously recorded for 23 fishing operations performed on November and December, 2003. All measurement data, such as trawl position, heading, towing course and past track which was individually time stamped during data acquisition, was processed in real time on the ECDIS and displayed simultaneously on the ENC chart. The results indicated that after the separation of a marker buoy from Danish seiner, the averaged running speed of vessel and the averaged setting period while shooting the seine on the course of diamond shape to surround the fish school in the 23 fishing operations were 8.3 knots and 13.1 minutes, respectively. And with the maker buoy taken on board, the averaged running speed of vessel and the averaged towing period while closing the seine on the straight route was 1.0 knots and 47.0 minutes, respectively. After the closing stage of hand rope, the hand rope was towed by the averaged speed of 2.2 knots during the 13.0 minutes. The average area for route of diamond shape swept by sweep lines of the seine in 23 fishing grounds was $709,951.6m^2$. Further investigation is also planed to provide more quantitative tracking information and to achieve more effective surveillance and control of Danish seine vessels in EEZ fishing grounds.

A Investigation for Usage Reason and Usage Satisfaction of Setting Perm and Digital Perm (셋팅 펌과 디지털 펌 기기의 사용 이유와 사용 만족도 조사)

  • Hong, Mi Ra;Park, Hye ryeon;Youn, Young Han
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.6
    • /
    • pp.312-325
    • /
    • 2020
  • The heat perm is the preferred hair technique to get positive affects such as increase of work efficiency and sale in hair industry. The subjects of this study is 262 hair shop workers and it was investigated heat perm device using reason, using satisfaction and repurchase. As a result, the perm accounted for 32.1 and the use of digital perm devices was more than that of setting perm devices. The reasons for the use were that the longer the setting device was engaged, the flexible it was the hair wave. The higher the rank, the better the hair wave retention and the long hair treatment, and it also helped sales. (p<0.05) Digital perm device can be hair-wavy in the desired style while in use, and the longer the working period, the more advantageous. The repurchase intention was that the longer the period of service and the higher the rank, the more advantageous it was. (p<0.05) The reasons for the usage of setting perm and digital perm were correlated with the satisfaction of use and the repurchase intention. The reasons for the use were helpful for sales and elastic hair wave and long hair waving was possible, which affected the repurchase. In conclusion, heat perm had been found not only helped sales, made a good hair wave, and the long hair waving, but also to be preferred to the long working period of the hair shop and the rank above the designer.

A Study on the Criteria for Setting the Dynamic Control Mode of Battery Energy Storage System in Power Systems (전력계통 적용을 위한 배터리 에너지저장장치의 동적 제어모드 판단기준에 관한 연구)

  • Han, Jun Bum;U, Garam;Kook, Kyung Soo;Chang, Byunghoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.444-450
    • /
    • 2013
  • This paper presents the criteria for setting the dynamic operating mode of BESS(Battery Energy Storage System) in the bulk power systems. ESS has been expected to improve the degraded dynamic performance of the power system with high penetration of the renewable resources. While ESS is controlled in steady state or dynamic operating mode for its better effectiveness depending on the operating conditions of power systems, the criteria for setting the dynamic operating mode for the transient period needs to be robust enough to cover all the different conditions. The proposed criteria consider the varying conditions and the operating practices of the bulk power systems.

Discussion on the Strategic Priorities and Navy's Coping in the Interwar Period Britain, 1919?1939 (「전간기 영국의 전략 우선순위 논의와 영국해군의 대응, 1919-1939」)

  • Jeon, Yoon-Jae
    • Strategy21
    • /
    • s.32
    • /
    • pp.123-159
    • /
    • 2013
  • The purpose of this research paper is to re-valuate the factors that affected the Royal Navy's rearmament and preparation for war by conducting analysis on the discussion held in the Britain on the strategic priorities and Navy's coping measures adopted during the interwar period. After the end of the WWI, each of the military arms of the Britain faced significant difficulty in securing budget and increasing their military power all throughout the interwar period, and the Navy was not an exception. The WWII that got started on September 1939 was the turning point in which this difficulty led to full-fledged crisis. Immensely many criticisms followed after the war and problems were identified when it comes to the Royal Navy's performance during the war. This type of effort to identify problem led to the attempt to analyze whether Royal Navy's preparation for war and rearmament policy during interwar period were adequate, and to identify the root causes of failure. Existing studies sought to find the root cause of failed rearmament from external factors such as the deterioration of the Britain itself or pressure from the Treasury Department to cut the budget for national defense, or sought to detect problems from the development of wrong strategies by the Navy. However, Royal Navy's failed preparation for the war during interwar period is not the result of one or two separate factors. Instead, it resulted due to the diverse factors and situations that the Britain was facing at the time, and due to intricate and complex interaction of these factors. Meanwhile, this research paper focused on the context characterized by 'strategic selection and setting up of priorities' among the various factors to conduct analysis on the Navy's rearmament by linking it with the discussion held at the time on setting up strategic priorities, and sought to demonstrate that the Navy Department's inadequate counter-measures developed during this process waned Royal Navy's position. After the end of WWI, each of the military arms continued to compete for the limited resources and budget all throughout the interwar period, and this type of competition amidst the situation in which the economic situation of Britain was still unstable, made prioritization when it comes to the allocation of resources and setting up of the priorities when it comes to the military power build-up, inevitable. Amidst this situation, the RAF was able to secure resources first and foremost, encouraged by the conviction of some politicians who were affected by the 'theory of aerial threat' and who believed that curtailing potential attack with the Air Force would be means to secure national security at comparatively lower cost. In response, Navy successfully defended the need for the existence of Navy despite the advancement of the aerial power, by emphasizing that the Britain's livelihood depends on trade and on the maintenance of maritime traffic. Despite this counter-measuring logic, however, Navy's role was still limited to the defense of overseas territory and to the fleet run-off instead of sea traffic route production when it comes to the specific power build-up plan, and did not understand the situation in which financial and economic factors gained greater importance when it comes to the setting up of strategic priorities. As a result, Navy's plan to build its powers was met with continual resistance of the Treasury Department, and lost the opportunity to re-gain the status of 'senior service' that it had enjoyed in the past during the competition for strategic prioritization. Given that the strategic and economic situation that Korea faces today is not very different from that of the Britain during the interwar period, our Navy too should leverage the lessons learned from the Royal Navy to make the effort to secure viable position when it comes to the setting of priorities in case of national defense strategy by presenting the basis on why maritime coping should be prioritized among the numerous other threats, and by developing the measures for securing the powers needed effectively amidst the limited resources.

  • PDF